Browse wiki

Jump to navigation Jump to search
June 9, 2016  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
April 8, 2016  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
20:41:00, 4 December 2019  +
TSTF-2  +, TSTF-234  +, TSTF-45  +, TSTF-46  +, TSTF-27  +, TSTF-28  +, TSTF-87  +, TSTF-95  +, TSTF-24  +, AFW Train Operable When in Service  +, Administratively Control Containment Penetrations  +, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B  +, Add Note to LCO 3.9.5 Allowing Shutdown Cooling Loops Removal from Operation  +, Increase the Completion Time When the Core Reactivity Balance is Not within Limit  +, Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable  +, SFDP Clarifications  +, Add Met Vs. Perform to Specification 1.4, Frequency  +, Determination of Cumulative and Projected Dose Contributions in Recp  +, Containment Structural Integrity  +, Delete SR Frequencies Based on Inoperable Alarms  +, Provide Separate Condition Entry for Each PORV and Block Valve  +, Revise Shutdown Margin Definition for Stuck Rod Exception  +, Eliminate the Remote Shutdown System Table of Instrumentation and Controls  +, Refueling Boron Concentration Clarification  +  and Require Static and Transient Fq Measurement  +
Vogtle +  and Farley +
April 8, 2016  +
Approved  +  and Closed  +