Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Technical Requirements Manual + (08:09:13, 8 July 2018)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figure 7.6.5-1 (Sheet 1 of 2) Through Figure 8.3.1-1 (Sheet 4 of 34) + (08:09:20, 8 July 2018)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2 - Resubmittal of Revision 20 to the Updated Final Safety Analysis Report Cd Roms + (08:09:24, 8 July 2018)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figure 6.2.1-15 (Sheet 15 of 65) Through Figure 6.2.1-21 (Sheet 74 of 74) + (08:09:31, 8 July 2018)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Table 4.3-1 (Sheet 1 of 3) Through Figure 6-2.1-15 (Sheet 14 of 65) + (08:09:52, 8 July 2018)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3D-93 Through 3D-136 + (08:10:04, 8 July 2018)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3D-66 Through 3D-92 + (08:10:07, 8 July 2018)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3D-41 Through 3D-65 + (08:10:11, 8 July 2018)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3D-18 Through 3D-40 + (08:10:15, 8 July 2018)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3.7.B.2-27 Through 3D-17 + (08:10:28, 8 July 2018)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Chapter 2, Hydrologic Engineering + (08:10:46, 8 July 2018)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant + (08:11:06, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, List of Effective Pages + (08:11:19, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Appendix 9.6A, Fire Protection Program Report + (08:11:23, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Appendix B, Questions and Responses Related to Initial NRC Review of Operating License Application + (08:11:27, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Appendix a, a Functional Evaluation of the Components of the Systems Which Are Shared by the Two Units + (08:11:31, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 16, Aging Management Programs and Time-Limited Aging Analysis Activities + (08:11:35, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 15, Technical Specifications + (08:11:39, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 14, Safety Analysis, Appendix 14A Thru Appendix 14G + (08:11:43, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations + (08:11:47, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations + (08:11:50, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report + (08:12:00, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion Systems + (08:12:04, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 7, Instrument and Control + (08:12:13, 8 July 2018)
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary + (08:12:26, 8 July 2018)
- RS-16-228, Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition + (08:18:37, 8 July 2018)
- LR-N16-0204, Hope Creek Generating Station - Core Operating Limits Report, Reload 20, Cycle 21, Revision 13 + (08:26:44, 8 July 2018)
- LR-N16-0204, Hope Creek Generating Station - Transmittal of Core Operating Limits Report, Reload 20, Cycle 21, Revision 13 + (08:26:48, 8 July 2018)
- RA-16-003, RETRAN-3D -- a Program for Transient Thermal-Hydraulic Analysis of Complex Fluid Flow Systems Volume 4: Applications Manual + (08:29:31, 8 July 2018)
- RA-16-003, Computer Code Abstract: RETRAN-3D MOD004.7.1 + (08:29:35, 8 July 2018)
- RA-16-003, Attachment 5 EPRI RETRAN-3D Computer Code Manuals, NP-7450(A) + (08:29:39, 8 July 2018)
- NL-16-1830, Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiation Monitors at Farley Nuclear Plant, Part 1B of 1C + (08:34:16, 8 July 2018)
- NL-16-1830, Southern Nuclear Operating Company Response to RAI for License Amendment Regarding Emergency Action Level Schemes to Adopt NEI 99-01 Rev 6 and to Modify Radiaion Monitors at Farley Nuclear Plant, Part 1A of 1C + (08:34:20, 8 July 2018)
- RS-16-196, Clinton Power Station - Operational Requirements Manual (Orm) + (08:46:09, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix B - Construction Material Standards and Quality Control Procedures + (08:46:13, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix a - Glossary + (08:46:17, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 17 - Quality Assurance + (08:46:21, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix C - Computer Programs + (08:46:28, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 16 - Technical Specifications + (08:46:32, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 13 - Conduct of Operations + (08:46:43, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 12 - Radiation Protection + (08:46:50, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 11 - Radioactive Waste Management + (08:46:58, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 10 - Steam and Power Conversion System + (08:47:02, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 9 - Auxiliary Systems + (08:47:14, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 8 - Electric Power + (08:47:20, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 7 - Instrumentation and Control Systems + (08:47:40, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 111 + (08:47:51, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 111 + (08:47:56, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 111 + (08:48:01, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 111 + (08:48:06, 8 July 2018)
- RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 111 + (08:48:10, 8 July 2018)