Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17228A964 + (18:41:24, 8 January 2025)
- ML17228A963 + (18:41:25, 8 January 2025)
- ML17228A961 + (18:41:26, 8 January 2025)
- IR 05000335/1994023 + (18:41:29, 8 January 2025)
- ML17228A958 + (18:41:31, 8 January 2025)
- ML17228A956 + (18:41:32, 8 January 2025)
- L-94-308, Monthly Operating Repts for Nov 1994 for Saint Lucie Units 1 & 2 + (18:41:36, 8 January 2025)
- ML17228A952 + (18:41:38, 8 January 2025)
- L-94-316, Forwards NPDES Noncompliance Notification Rept of Reportable Release of Untreated Parking Lot Runoff to Mangrove Impoundment at Plant + (18:41:39, 8 January 2025)
- ML17228A950 + (18:41:39, 8 January 2025)
- L-94-312, Requests NRC to Exercise Enforcement Discretion W/Regard to Facility TS 3.3.1.1, Reactor Protective Sys, Action 2 by Extending Max Time Duration for Which Inoperable Channel May Be Bypassed + (18:41:41, 8 January 2025)
- 05000335/LER-1994-006-01, :on 941023,containment Integrity Outside of FSAR Assumption Under Limited Circumstances Due to Design Error.Relief Valve Path in I Removal Sys Was Isolated + (18:41:43, 8 January 2025)
- ML17228A943 + (18:41:44, 8 January 2025)
- ML17228A942 + (18:41:45, 8 January 2025)
- ML17228A941 + (18:41:46, 8 January 2025)
- ML17228A939 + (18:41:47, 8 January 2025)
- 05000335/LER-1994-008, :on 941104,inadvertent Cis Caused by Failure of B Instrument Inverter Concurrent W/Channel D Cis in Tripped Condition.Operations Restored Power to B Train Safeguards Instrumentation & Reset Cis + (18:41:48, 8 January 2025)
- ML17228A937 + (18:41:50, 8 January 2025)
- ML17228A935 + (18:41:51, 8 January 2025)
- ML17228A934 + (18:41:52, 8 January 2025)
- L-94-296, Forwards Environ Protection Plan Rept Providing Description of Reportable Release of Untreated Parking Lot Runoff to Mangrove Impoundment at Facility on 941116,including Description of Percolation Pond Sys Bypass + (18:41:53, 8 January 2025)
- ML17228A933 + (18:41:53, 8 January 2025)
- 05000335/LER-1994-007, :on 941026,automatic Reactor Trip on Loss of Electrical Load Due to Flashover on 240 Kv Switchyard Potential Transformer.Unit Stabilized in Mode 3 & Transformer Replaced + (18:41:55, 8 January 2025)
- L-94-297, Advises That Based on Results of Svc Water Sys Operational Performance Insp Re Mid Cycle Maint of CCW HXs Was Implemented for Facility + (18:41:56, 8 January 2025)
- L-94-299, Informs That Listed Number of SG Tubes Plugged During Fall Unit 1 Refueling Outage + (18:41:58, 8 January 2025)
- L-94-294, Special Rept:On 941028,EDG Failure Occurred Due to Burned Through Wire from Magnetic Amplifier Terminal Block to Field.Wire Repaired & Relanded to Terminal Block + (18:41:59, 8 January 2025)
- L-94-285, Monthly Operating Rept for Oct 1994 for St Lucie Units 1 & 2 + (18:42:02, 8 January 2025)
- ML17228A916 + (18:42:02, 8 January 2025)
- ML17228A912 + (18:42:04, 8 January 2025)
- L-94-283, Provides NPDES Permit Mod,Issued by EPA on 941101 + (18:42:05, 8 January 2025)
- L-94-284, Forwards NPDES Noncompliance Notification on 941030 Re 1.5 Million Gallons of Untreated Parking Lot Runoff Entered Mangrove Impoundment 008E + (18:42:07, 8 January 2025)
- ML17228A909 + (18:42:07, 8 January 2025)
- ML17228A903 + (18:42:20, 8 January 2025)
- L-94-260, Application for Amends to Licenses DPR-67 & NPF-16,upgrading TS 3/4.6.2.1 & 3/4.6.2.3 by Adapting Combined Spec for Containment Spray & Cooling Sys Contained in Std TS for C-E Plants + (18:42:21, 8 January 2025)
- ML17228A900 + (18:42:23, 8 January 2025)
- ML17228A898 + (18:42:24, 8 January 2025)
- IR 05000335/1994019 + (18:42:26, 8 January 2025)
- ML17228A894 + (18:42:28, 8 January 2025)
- ML17228A891 + (18:42:29, 8 January 2025)
- IR 05000335/1994020 + (18:42:37, 8 January 2025)
- ML17228A888 + (18:42:38, 8 January 2025)
- L-94-262, Forwards St Lucie Unit 2 Rept of Changes Made to Facility Under Provisions of 10CFR50.59 for Period 930326-940422. Rept Correlates W/Info Included in Rev 9 of Updated FSAR Submitted Under Separate Cover + (18:42:39, 8 January 2025)
- ML17228A885 + (18:42:41, 8 January 2025)
- ML17228A884 + (18:42:42, 8 January 2025)
- ML17228A882 + (18:42:43, 8 January 2025)
- L-94-254, Forwards Rev 0 to PSL-200-AOA-94-1, St Lucie Nuclear Plant, Unit 2 First ISI Interval Request for Authorization of Alternative Exam, Per 10CFR50.55a(g)(6)(ii)(A)(5) + (18:42:44, 8 January 2025)
- ML17228A881 + (18:42:44, 8 January 2025)
- L-94-258, Forwards Completed NRC Form 536,providing Info Requested in Response to Administrative Ltr 94-12, Operator Licensing Natl Exam Schedule + (18:42:46, 8 January 2025)
- L-94-259, Monthly Operating Repts for Sept 1994 for St Lucie Units 1 & 2 + (18:42:47, 8 January 2025)
- L-94-249, Comment Opposing Proposed Rule Re Pilot Program for NRC Recognition of Good Performance by Nuclear Power Plants + (18:42:49, 8 January 2025)
- ML17228A873 + (18:42:51, 8 January 2025)
- L-94-253, Requests Approval of Interim Relief Request 16 Re Repair Requirements for Class 3 Piping in ISI Plan + (18:42:52, 8 January 2025)