L-94-283, Provides NPDES Permit Mod,Issued by EPA on 941101

From kanterella
Jump to navigation Jump to search
Provides NPDES Permit Mod,Issued by EPA on 941101
ML17228A910
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/04/1994
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-283, NUDOCS 9411160342
Download: ML17228A910 (14)


Text

PRIGRITY 1

(ACCELERATED RIDS PROCESSING REGULATORY.INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9411160342 DOC.DATE: 94/11/04 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power-

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET g

05000335 05000389 P

SUBJECT:

Provides NPDES permit mod,issued by EPA on 941101.

DISTRIBUTION CODE:

COOID COPIES RECEIVED:LTR /

ENCL 3 SIZE:

TITLE: Licensing Submittal: Environmental Rept Amdt

& Related Correspondence 0

NOTES:

RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS OGC/HDS3 EXTERNAL LITCO AKERS i D NRC PDR COPIES LTTR ENCL 1

1 6

6 1

0 1

1 1

1 RECIPIENT ID CODE/NAME NORRIS,J F CENTER 0

RGN2 DRSS/RPB NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

U E

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUb!ENTCONTROL DESK, ROOKI Pl-37 (EXT. 504-2083 ) TO ELIAIINATEYOUR NAME FROW!

DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 13

Florida Power & Light Company, P.O. Box 128, Fort Pierce, FL 34954.0128 November 4, 1994 L-94-283 10 CFR 50.36b 10 CFR 50.4 EPP 3.2.3 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 NPDES Permit Modification Attached is an information copy of the National Pollutant Discharge Elimination System (NPDES) Permit modification, which was issued by the U.

S.

Environmental Protection Agency on November 1,

1994.

This document is being sent pursuant to Section 3.2.3 of the St.

Lucie Units 1 and 2 Environmental Protection Plan.

Should you have any questions on this information, please contact us

~

Very truly yours, D. A.

S er Vice P ident St.

Lu 'e Plant DAS/CDW cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachment

)O

] r~Q 9411160342 941104 PDR ADOCK 05000335 P

PDR an FPL Group company L,.(

14: 46 FROM FPLiENV AFFAI RS NOV-81-1994 1 q%tV 514p c,'c

~gA

\\

TO 8-4654898 P.83 RECEIVED OCT 27 59't 345 CQURTL.aNO STREET. N.K, ATLANTA,GKORGtA 30365 QQf oe toot CHRTIFl D MAlL RETURN REC PT RE U STED UNITED STATES ENVIRONMENTALPROTECTION AGENCY REGION I V REF-'WM-WPEB Mr. Larry L. Leskovjan, Manager Florida Power and Light Co.

P.Q.

Box 088801 North Palm Beach, Florida 33408-8801 RE: Final Issuance of modification NPDES Permit No. FL0002208 FPL St. Lucie Plant

=NYIRONV.ENTAlAi= 'I'"S

Dear Mr. Leskovjan:

Enclosed is the National Pollutant Discharge Elimination System (NPDES) permit modification for the above>>referenced facility.

This action constitutes the Environmental Protection Agency's final permit modification decision in.accordance with Title 40, Code of Federal Regulations (CFR) Section 124.15(a).

The permit modification, will become effective as specified, provided that no timely request for an evidentiary hearing is received by the Agency.

Any interested person may contest. this decision by submitting a timely request for an evidentiary hearing pursuant to the procedures at 40 CFR 5 124.74.

If a request for a hearing is received by the Agency, following review, a determination will be made and the requester advised of the Agency's decision on the request.

Until that time, please be advised that any request will render" the permit ineffective pursuant, to 40 CPR 5 124.15.(b).

For a new source, a new discharger<

a recommencing discharger, or a facility for which an untimely permit renewal application was submitted, a hearing request renders the facility without an NPDES permit and the facility may not discharge (unless relief is granted by the Presiding Officer under 40 CFR 5 124.60(a)).

Xf the evidentiary hearing request is granted, in whole or part, to an existing source, the. effect of the contested provision(s),

and any other conditions not severable from those conditions, will be stayed and not subject to judicial review pending final Agency action.

In this case, all provisions of the prior permit, as well as, all uncontested provisions of the reissued permit ~hall continue fully enforceable and effective pending fi.nal Agency action on the permit appeal.

See 40 CFR 5 124.60.

HOV-81-1994 14: 47 FROM FPLiENV AFFA1RS TO 8-4654898 P.84 To request an evidentiary hearing under 40 CFR 5 124.74, you must submit an original and two copies of the request to the Regional Hearing Clerk at the letterhea'd address within thirty

{30) days from service of this notice.

A copy of the procedures and requirements for evidentiary hearing requests and appeals to the Achninistrator is enclosed.

For purposes of judicial review under the Clean Hater Act, 33 U.S.C.

5 1251 et

~se., final Agency action on a permit does not occur unless and until a party has exhausted its administrate.ve remedies as required by 40 CFR Part 124.

Further information on procedures pertaining to the filing of an evidentiary hearing request or other legal matters may be obtained by contacting Ms.

Gwen Eason, Assistant Regional Counsel,'t

{404) 347-2309, ext 2906.

Sincerely,'nclosures

{3):

Rob t F. McGhee, Acting Director Hater Management Division Evidentiary Hearing Procedures Final NPDES Permit modification Amendment to Fact Sheet cc:

Florida DEP {with all enclosures, except Evid. Hearing Procedures)

U.S. Fish 8 Wildlife Service, Vero Beach office

{with enclosures)

0

NOV-81-1994 14: 47 FRON FPLiENU AFFAIRS

>%0 Sr TO 8-4654898 P.85

= A

+p

~

~( ~aalu UNITECI STATES ENVIRONMENTALPROTECTION AGENCY REGION IV 345 COVRTLAND5TREKT, N.K.

ATLANTA,GEORGIA 3036S AMENDMENT TO FACT SHEET AT THE TIME OF FINAL ISSUANCE DATE: 0gy 2g )gg4 NPDES Permit Number:

FL0002208 Name of Applicant: FPL St. Lucie Nuclear Plant

1) Changes to permit from draft permit to final permit stage:

Page I-ll of the modification has been corrected to show the correct schedule of compliance.

2) Public Comments.

Comments were received from Florida Power

& Light Co. on September 26, 1994.

Comments and.responses are as follows:

Comment The proposed effective date of the permit is listed as January 1,

1995.

Assuming that an acceptable permit'an be obtained by PPL by the October 18, 1994, issuance date shown on Page 2

of the Fact Sheet, FPL will waive its right to an evidentiary hearing on this matter and request that the permit modification be. effective on November 1, 1994.

Response

The issuance date for this modification will not be October 18, 1994, but rather a few days later.

However, on October 19,
1994, we received a letter stating that Florid~ Power Light Company waives all rights to an evidentiary hearing for the permit modification.

With the evidentiary hearing waived, EPA will make the effective date of this modification November 1,

1994.

Comment.

Page I-10, Part

1. B. I. b.(3) and (4).

Include the flow data to be collected under footnote t'3] so that, after four valid tests have been completed, assuming that the oil and grease data will yield favorable results, the flow monitoring requirement can be deleted or modified along with the oil and grease. monitoiing requirements.

TO 8-46S4898 P.86 Responsec ln order to maintain this discharge point and effectively enforce the other requirements for this discharge, the flow parameter needs to remain.

Comment:

Page I-ll, Part I.B.l.b.(3) and (4).

Please delete these two requirements from the permit modification.

They were not present in the BNP 3 requirement contained in the final St.

Lucie Plant NPDES permit which became effective January 1,

1995+

Response

Page I-11 has been changed to reflect November 5, 1993 minor modification in which items (3) and (4) were removed.

3) State Certification:

Certification was requested on September 14, 1994 and has been waived by the Florida Department of Environmental Protection (FDEP) by their letter of October 7, 1994.

AOV-81-1994 14: 48 FROM FPLiENV AFFAIRS TO 8-46S4898

. P,87 PERM NO. FL0002208 Major Non-POTW METED STATES ENVIRONMENTAL PROTECTION AGENCY REGION IV AUTHORIZATION TO DXSCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE.ELIMINATIONSYSTEM In compliance with the provisions of the Clean Water Actg as amended (33 U.S-C.

12 1 et seq.; the "Act")g Florida Power and Light Company Post Office Box 008801 North Palm Beach, Florida 33408-8801 is authorized to discharge from a facility located at P

St. Lucie Nuclear Power Plant Units 1 and 2

, Hutchinson Xsland St. Lucie County, Florida to receiving waters named Atlantic Ocean:

Mangrove Impoundment 8E:

from outfall serial numbers

001, 002, 003, 004,
005, and 007.

from outfall serial number 006C.

in accordance with effluent limitations, monitoring requirements, and other conditions set. forth herein.

The permit consists of this cover sheet, Part I 11

pages, Part XI 16
pages, Part XII 4
pages, Part XV 6
pages, and Part V

2 pages.

lf This permit became effective on January 1,

1994.

The cover, sheet has been modified to reflect the appropriate receiving water body for Outfall 006C.

This modification allows for the discharge of non-industrial related storm water into the Mangrove Impoundment 8E, through Outfall 006C.

Xn allowing so, 006C's discharge location has been changed to reflect the Mangrove Xmpoundment 8E and not the Intake Canal.

Monitoring for oil and grease has been added for Outfall 006C on Page I-10.

Outfall's 006A and 008 were deleted, upon request by the permittee, on Page I-9.

Page I-9 has been removed and subsequent pages have been renumbered.

Only Pages I-9, I-10 and I-11 aze enclosed.

The modification shall become effective on ove er 1

1994.

This permit and the authorization to discharge shall expire at midnight, Se emb 30 1998.

Se temb 30 99 Date Issued 0CT 25 SSC Date Modified Robert

. McGhee, Acting rector Water Management Division

A.

7 ~

~

'art I

Page I-9 Permit No. FM002208

~

Qp I6)

I u)

BFPLUBHT LIMITATIONS AND MONITORING REQUIREMENTS - FINAL During the period beginning on the -effective date of this permit and lasting. through expiration of this permit, the. permittee is authorized to discharge from outfall serial number 0068 '"

(oil storage area) - industrial related storm water to the intake canal.

Such a discharge shall be limited and monitored by the permittee as specified below:

BFPLUBNT CBARACTBRISTICS DISCHARGE LIMITATIONS MONITORING RB UZREMBNTS

Flow, (MOD)

Total Suspended

Solids,

.mg/1 Oil and Grease, mg/1 Daily

~vera e

Report Report Report Daily Maximum Report Report Report Measurement 1/Year 1!Year 1/Year Sample

~e Estimate Grab Grab m

XI Tlnz)

Vl b.

C ~

There shall be no discharge of floating solids or visible foam in other than trace amounts-Samples taken in compliance with the monitoring requirements specified above shall be taken at.

the following location(s):

nearest accessible point after final treatment but prior to discharge to the receiving stream.

Internal serial number assigned for identification and monitoring purposes-Monitoring requirements apply once per year during the first 30 minutes of a rainfall event.

Major Modification Date:

QCt aS iW 03l (p

Vl GI cQ CD 0

t9 I,)

A 8.

Part I Page I-10 Permit No. PL0002208, o I

EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS FINAL During the period beginning on the effective date of this permit and lasting through exp3ration of this permit, the permittee is authorized to discharge from outfall serial number 006C

~ >-

non-industrial related storm water to the Mangrove Impoundment SE.

Such a discharge shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTER STICS DISCHARGE LIMITATIONS MONITORING RB UIRHMBNTS Daily Av emcee Daily m~aaxim Measurement Sample

~e

Plow, (MGD)

Oil and Grease, mg/l Report Report "'eport 1/Quarter 1/Quarter Estimate Grab m

b.

There shall be no discharge of floating solids or visible foam in other than trace amounts.

c.

Samples taken in compliance with the monitoring requirements specified above shall be taken at the following location(s}c nearest accessible, point after final treatment but prior to discharge to the receiving stream.

9.

During the period beginning on the effective date of'his permit and lasting through expiration of this permit, the permittee is authorized to discharge from outfall serial number 007 '"

intake screen wash water to the intake canal.

a.

Discharge ot intake screen wash water is permitted withont limitations or monitoring requirements.

b.

There shall be no discharge of floating solids or visible foam in other than trace amounts.

Xnternal serial number assigned for identification and monitoring purposes.

Monitoring requirements apply once per quarter during the first 30 minutes of a rainfall event.

The permittee shall conduct Oil and Grease monitoring as specified above.

The effluent shall be monitored once per quarter until a total of 4 valid tests have been completed.

EPA shall review the Oil and Grease data and the permit may be modified to establish a water quality based limit, if needed, as authorized and required by 40 CPR 122.44(d){1}(iii), to ensure thati the requirements of Florida Administrative Code (FAC)17-302.530(50}{b} tApril 25, 1993) are maintained.

ocr ss

>Js4 Ma)or Modification Date:

4

~

TO 8-4654898 P.18 B-SCHEDULE OP COMPLIANCE Page I-ll Permit No. FL0002208 1.

The permittee shall achieve compliance with effluent

- limitations specified for discharges in accordance with the following schedule:

a. Operational level attained.......Pffective Date (ED) of the permit b.

BMP Plan (see Part IV of this'permit)

(l)

Complete Waste Management Assessment......ED of Permit + 3 months (2)

Develop 8 Implement Plan...ED of Permit + 6 months 2.

No later than 14 calendar days following the date identified in the above schedule of,compliance, the permittee shall submit either a report of progress or/

in the case of specific actions being required by identified dates, a written notice of compliance or non-compliance.

In the later case, the notice shall include cause of non-compliance, any remedial actions

taken, and the probability of meeting the next scheduled requirement.

Major Modification Date:

OCT Z5 annal P

1A

4 i

~

~

~

0