Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17276B405 + (12:58:09, 8 January 2025)
- ML17276B401 + (12:58:12, 8 January 2025)
- ML17276B400 + (12:58:13, 8 January 2025)
- GO2-82-373, Forwards Transmittal Ltr & Certificate of Svc for Amend 22 to FSAR + (12:58:14, 8 January 2025)
- GO2-82-367, Advises That Decision Re Resolution of Vacuum Breaker Cycling Will Be Issued by 820715.Decision Pending Outcome of Generic Programs to Establish Structural Capacity of Vacuum Breakers for Mark II Facilities + (12:58:18, 8 January 2025)
- GO2-82-362, Forwards Study Results Re Comparison of Structural Response to Symmetric & Asymmetric Chugging & Seismic Loads.Results Show Similarity of Responses Between Load Cases + (12:58:43, 8 January 2025)
- GO2-82-351, Forwards Results of Recomputed Condensation Oscillation Load Analysis & Comparisons of Chugging & Load in Terms of Bldg Acceleration Response Spectra for Three Representative Critical Locations,In Response to NRC 820302 Request + (12:59:16, 8 January 2025)
- GO2-82-323, Forwards Public Version of Followup Emergency Plan Info Re Relation of Containment Radiation Levels to Core Damage,In Response to NRC 820208 Telcon Request + (12:59:38, 8 January 2025)
- ML17276B390 + (13:00:00, 8 January 2025)
- ML17276B385 + (13:00:00, 8 January 2025)
- ML17276B382 + (13:00:01, 8 January 2025)
- GO2-82-319, Submits Revised Response to NRC Re Violations Noted in IE Insp Repts 50-397/79-10 & 50-397/80-08. Corrective Actions:Piping post-weld Heat Treatment Will Follow Bechtel Procedures + (13:00:02, 8 January 2025)
- IR 05000397/1979010 + (13:00:06, 8 January 2025)
- ML17276B374 + (13:00:07, 8 January 2025)
- GO2-82-344, Forwards Review of Summary of Conformance to NRC Regulations of 10CFR20,50 & 100 + (13:00:09, 8 January 2025)
- GO2-82-237, Forwards Response to SER Question 23 Amending Util 820114 Response Re Criteria for balance-of-plant & NSSS Tables. Info Will Be Incorporated + (13:00:12, 8 January 2025)
- GO2-82-239, Forwards Revised FSAR Pages Describing Jet Area Based on Target Location to Replace Page 3.6-46 + (13:00:14, 8 January 2025)
- ML17276B367 + (13:00:16, 8 January 2025)
- GO2-82-327, Forwards Two Sections of Util 820201 Draft Tech Specs, Omitted Due to Duplication Errors + (13:00:19, 8 January 2025)
- GO2-82-324, Forwards Burns & Roe Review of BNL Comments Re Effects of Desynchronization Methodology Used in Generic & plant-unique Chugging Load Specs,Per Mark II Owners Group 820209 Meeting. Structural Responses Not Significant + (13:00:22, 8 January 2025)
- ML17276B348 + (13:00:25, 8 January 2025)
- GO2-82-314, Responds to 820305 Telcon.Submits Info Re Training Program for Shift Support Supervisor Per SER Open Items.Course Outlines for BWR Sys Analysis & Sys & Procedures Encl + (13:00:26, 8 January 2025)
- GO2-82-280, Forwards Schematic Re Various Supplies & Flow Paths for Facility Control Room Chillers Per 820226 Request.Control Room Cooling Sys Consists of Two Redundant Room Coolers & Chilled Water Supply Sys + (13:00:29, 8 January 2025)
- GO2-82-285, Responds to J Rosenthal 820219 Concerns Re on Rod Block Monitors.Rod Block Monitor Sys Design Is Similar to Zimmer Design.Facility Sys Has Been Reviewed & Resolution Provided + (13:00:30, 8 January 2025)
- GO2-82-281, Confirms Info Provided During 820301 Telcon Re Containment Instrument Air Sys Design Compliance W/Reg Guide 1.80 & ANSI Std MC11.1-1975.Sys Design Complies W/Reg Guide & Is Being Redesigned to Supply Nitrogen Gas from Cryogenic Source + (13:00:34, 8 January 2025)
- ML17276B340 + (13:01:10, 8 January 2025)
- GO2-82-287, Notifies That Estimated 49 Square Ft of Unqualified Organic Coating Are Inside Containment,Per 820205 Commitment + (13:01:11, 8 January 2025)
- GO2-82-279, Responds to Licensing Qualification Branch SER Open Items Per 820226 Request.Shift Support Supervisor Will Receive Training as Identified in Section 13.2.1.1.2, Initial Non-License Operator Training Program + (13:01:52, 8 January 2025)
- GO2-82-283, Forwards Addl Info Re Light Loads Per 820301 Request.Info Consists of Summary of Bounding Impact Energy Analysis & Revised Table of Light Loads Over Reactor Vessel & Potential Energy + (13:02:33, 8 January 2025)
- ML17276B336 + (13:02:38, 8 January 2025)
- ML17276B330 + (13:02:42, 8 January 2025)
- ML17276B312 + (13:02:43, 8 January 2025)
- ML17276B286 + (13:02:45, 8 January 2025)
- ML17276B283 + (13:02:48, 8 January 2025)
- ML17276B279 + (13:02:50, 8 January 2025)
- ML17276B278 + (13:02:52, 8 January 2025)
- ML17276B277 + (13:02:54, 8 January 2025)
- ML17276B276 + (13:02:56, 8 January 2025)
- ML17276B275 + (13:02:59, 8 January 2025)
- ML17276B273 + (13:03:00, 8 January 2025)
- ML17276B272 + (13:03:02, 8 January 2025)
- ML17276B271 + (13:03:03, 8 January 2025)
- ML17276B270 + (13:03:04, 8 January 2025)
- ML17276B269 + (13:03:06, 8 January 2025)
- ML17276B268 + (13:03:07, 8 January 2025)
- ML17276B266 + (13:03:08, 8 January 2025)
- ML17276B264 + (13:03:09, 8 January 2025)
- ML17276B263 + (13:03:11, 8 January 2025)
- ML17276B262 + (13:03:12, 8 January 2025)
- ML17276B260 + (13:03:13, 8 January 2025)
- ML17276B259 + (13:03:14, 8 January 2025)