ML17276B259
Text
2998 G 078 SH 152 REVISIONS NO DATE 7-24-95 DESCRIPTION BY CH -
APPROVED BB DWC JJZ Ictr
0 IIIIIII Sl}s)97 GM
~
~
~
~
~
~
~
~
~
ECZMM7048:
REV: (86) PIPING, (E5,E6)
ABANDONED AND ADO NOTE 8, DEL (86)
DRAWING CORRECTION
}
z6 Z
5
(}
o~~
CC 03 Z
LDz Z
rn FROM CCW SUPPLY 2998-G-083 SH 2 CC G6 TO 0"W RETURN 2998-G-083 SH 2 CC F4 FROM SAMPIE INLET 2998-G-078 SH 153 SS D7 3/8-65-579 3/8'ROM OEMIN WTR PUM 2998-0-084 SH 2 DWS miSO Vseiei I
HIC S734 vsies 3/4.
FAI V5734 I
I HS 5763 N/5 FC V5763 I
I I
x::
CLOSES V5740 ON 1 HIGH PRESSURE N/5 DISSOLVED H2 ANALYZER V05102
,I 508 508 V05106 V05105 V05101 F- ~S (NOTE 3)
IN/5 5765 CL 4J 4J In 40 cn ~
)
4J O
I In OI OI)
TO HEAT TRACE CO Ol 0
5747 (NOTE 3)
I 0
V5719 5731
/
/5 GAS RESIDENCE CHAMBER FC O
V5731 502 502 HS 5741 Ot CO V5741 H
PIA
~A 503 (NOTE 4)
CLOSES V5763 ON HIGH PRESSURE FI
~
~
~
5749 5
N/5 -~sseFRF SURGE BULB V5747 C I/
(NOTES 1
ec 7)
V5718 HS V5720 SAMPLE CIRCULATION PUMP HS 5743 N/5 FC V5743 V
U LT 503 503 DR HS 5745 N/5 FC V5745 V5746 V5748 GAS SAMPLE VESSEL 5742 N/5 (NOTE 3)
(NOTES 2 k 5)
V5742 V5710 I/I rJ)
~ 4/
cn 4 CO W 0 I/I 4/
00 O C3 V5711 V5762 HS 57SI D2 METER N/5 504
~
505 CONTAINMENT SAMPLE PUMP DR OI 0)
~
~
CONTAINMENT SAMPLE YESSEL
~
~
~
HS 5
5760
~ 5 N/5
~
FI FC 503 V5760 V5705 P
M E
OT V
DR SURGE VESSEL PUMP V5706 5733 FC
~
~
~ V575 I ~
~
~
~
~
~
~
~
~
HS
~
~
HS 5799 S
VENT TO CABINET EXHAUST FILTER V5799
~
H2 METER 505
~
~
CO COI 5750 gs N/SoF ~
OI0 I)
HS 5756 ee HS 5767 S
N/S oF N/5 V5758 502 S
HS 5771 S
N/5 YS702 5772 N/5 CO I)
)0 FC 5753 S
N/S~~~
VENT TO HOOD ELECTROUTE STORAGE VESSEL X=
DR HS 5735 N/5 tnI I) 502 AE BORON METER 2
A E
N E
8 I
V5794 HS 5752 N/5 5 4 V
CO V5712 PT 505 V5703 ce X "=
TEST BURETTE 502 502 X-:
DR V5713 V5704 HIC 5732
/
N/5 FC$
5773 5797 S
r O
tn)
FC V5797 HIC 5768 V5714 SURGE YESSEL V5768 V5715 s7es HS
/5 FC V5709 HIC 5736
~
I
/
N/5
~FC D
FROM CNTMT ATMOS 3/6-56-569 2998-G-078 SH 153
~
~
SS G4
~
I TO CNTMT ATMOS 2998-G-078 SH 153 SS H4 3/e-ee-sso
'll
'/
3/6-WM-E54 V06411 V06410 FROM N2 PCV V7219 2998-0-078 SH 1638 WM E3 FROM V7270
}R N2 HDR 2998-G-078 SH 1638 WM E3 3/e-es 653 L ~)
V5716~
CONTROL PANEL D
1/2-65-654 FROM N2 PCV V7273 2998-G-078 SH 1638 WM F3 4/
CJ I
I I
D TQ GRB SLTPL/EQ DR TK 2998M-078 SH 153 SS E7 3/e-es-ses
'I~'-QRPAATtog Oi)L,Y
-.~IPY (', IT)'
CONTROLLED MPY EIEFORE USE NOTES MECH 2998 G 078 PTL 8
BLUM CHC CUNNINGHAM SHEET 152 URNooieo.owo 1.
- JgJC, DESIGNATES A 4-WAY VALVE; FLOW ENTERING IHE VALVE
~
WILL CONTINUE AT 90'URNS ONLY.
POSITIONING OF I //'HE VALVE WIlL ALLOW FLOW TO PASS EITHER QNE WAY (L) SINGLE ARROW OR THE OTHER WAY Q DOUBLE ARROW THE SINGLE ARROW DEPICTS THE NORMAL POSITION, 2.
I DESIGNATES A 4-WAY VALVE WITH NORMAL POSITION
~ ALLOWING STRAIGHT THROUGH FLOW AND THE OTHER POSITION ALLOWING FLOW THROUGH THE VERTICALLY PATH SHOWN.
3.
DESIGNATES A 4-WAY VALVE WITH NORMAL POSITION OF N/5 4CX THREE OPEN PORTS AND N2 SUPPLY ISOLATED BY THE FOURTH PORT.
4.
ALARMS ARE ANNUNCIATED AT THE POST ACCIDENT SAMPUNG SYSTEM CONTROL PANEL I
E, 5.
VALVE FAILS TO NORMAL POSITION UPON LOSS OF POWER AND AS IS UPON LOSS OF AIR 6.
ALL EQUIPMENT ON THIS DRAWING IS LOCATED WITHIN IHE PASS STATION.
7.
N/5 INDICATES THAT NITROGEN IS SUPPLIED TO THIS VALVE FOR OPERATION FROM THE NITROGEN HEADER WITHIN THE SKID.
8.
EQUIPMEiVT IS ABANDONED IN PLACE. AND NON FUNCTIONAL REFERENCE DRAWINGS
- PIPE, VALVE k INSTRUMENT SYMBOLS VALVE LIST LINE UST VALVE OPERATIONAL NUMBER INDEX INSTRUMENT INSIALIATION DETAILS INSIRUMENT LIST 2998-G-078 SH IDO 2998-A-051 2998-8-052 2998-8-057A 2998-8-231 2998-8-2700 I
I I
%$ I 5 IBBI Oc RI coRDR TNICUI/HITCONTROL CENTER
)
")
I I
I I
I
)
H(
I "I
I 9
I}C RLC DODO }TNTCONTROL CENTER NOTE:
THIS DRAWING IS MADE FROM REV.
OF DRAWING 2998-0-078 SH 152 REVISION OF THIS DRAWING MAY REQUIRE UPDATE OF THE FOLLOWING DOCUMENTS:
1.
FSAR FIGURE 9.3-3b I/M PASS VOLUME II 2998 13315 FLORIDA POWER ec UGHT COMPANY ST LUCIE PLANT 1983 890 MWe EXTENSION UNIT 2 FLOW DIAGRAM SAMPL)NG SYSTEM RAYTHEON ENGINEERS ts CONSTRUCTORS, INC SCALE: NONE APPROVAL DATE:
Q 7/ Q a (-(LaZ IG C) 6