Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-83-906, Forwards marked-up FSAR Changes in Response to SER Confirmatory Issue 1 Re Break Locations.Info Based on Status as-built Configuration.Final as-built Analysis Not Expected to Result in Significant Differences + (12:29:23, 8 January 2025)
- ML17277A913 + (12:29:25, 8 January 2025)
- ML17277A912 + (12:29:26, 8 January 2025)
- GO2-83-881, Requests That Spent Fuel Storage Pool Monitors Not Be Made Requirement in Tech Specs,Based on Recent Exemption Granted for License SNM-1890.Storage in Spent Fuel Storage Area Exemption Predicated on Design of Storage Facility + (12:29:27, 8 January 2025)
- ML17277A905 + (12:29:27, 8 January 2025)
- GO2-83-885, Forwards Response to FSAR Question 110.43 in NRC . Increased Damping & Seismic Spectra Resulting from Finite Element Model Utilized to Produce Phase II Refined Loads for Each of Five Sample Anchor Groups + (12:29:29, 8 January 2025)
- GO2-83-884, Forwards Response to FSAR Question 110.41 Re Requirements for Equipment Nozzle Loads,Per SER Confirmatory Issue 7 on Component Supports + (12:29:30, 8 January 2025)
- GO2-83-891, Forwards marked-up Tech Spec Re ECCS in Response to 830923 Request for Proposed Change to Surveillance Requirements on Automatic Depressurization Sys Backup Air Supply,Per SER, NUREG-0892 & Item II.K.3.28 + (12:29:32, 8 January 2025)
- GO2-83-880, Forwards Draft Tech Specs to Require Use of Shorting Links During Initial Source Range Monitors/Intermediate Range Monitors Overlap Demonstration or post-mod,per NUREG-0123 + (12:29:34, 8 January 2025)
- ML17277A887 + (12:29:34, 8 January 2025)
- ML17277A877 + (12:29:35, 8 January 2025)
- ML17277A875 + (12:29:36, 8 January 2025)
- ML17277A874 + (12:29:36, 8 January 2025)
- GO2-83-872, Forwards Four Oversize Drawings,Closing Out NUREG-0892,SER Outstanding Issue 29 Re Vacuum Breaker Valves.Valve Response Meets Containment Design Bases for Response Time & Flow Capacity.Aperture Cards Are Available in PDR + (12:29:37, 8 January 2025)
- ML17277A873 + (12:29:37, 8 January 2025)
- ML17277A868 + (12:29:39, 8 January 2025)
- ML17277A870 + (12:29:39, 8 January 2025)
- GO2-83-863, Forwards Addl Info Re Containment Out-of Roundness Per NRC 830722 Meeting + (12:29:40, 8 January 2025)
- GO2-83-861, Discusses Agreement W/Nrc Affecting Surveillance Requirements in NUREG-0892,SER Suppl 2 Re TMI Action Item II.K.3.28 on Automatic Depressurization Sys.Bottle Pressure Verification Changed to 31 Days + (12:29:41, 8 January 2025)
- GO2-83-865, Forwards Response to 830907 Request for Addl Info Re Setpoint Methodology.Resolution of Issue Generically w/NRC- Recognized Util Group Presently Addressing Issue Requested + (12:29:42, 8 January 2025)
- ML17277A861 + (12:29:44, 8 January 2025)
- GO2-83-855, Forwards Response to FSAR Question 110.44 in NRC .W/One Oversize Drawing.Aperture Card Is Available in Pdr.Response W/O Encl + (12:29:45, 8 January 2025)
- ML17277A859 + (12:29:45, 8 January 2025)
- BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 + (12:29:47, 8 January 2025)
- ML17277A854 + (12:29:48, 8 January 2025)
- GO2-83-085, Forwards Quality Verification Program,Vol 1:Overview Rept, Jul-Sept 1983 + (12:29:49, 8 January 2025)
- ML17277A822 + (12:30:04, 8 January 2025)
- GO2-83-814, Forwards WPPSS Unit 2 Single-Loop Operation Analysis. Rept Will Be Incorporated in Amend 32 to FSAR + (12:30:05, 8 January 2025)
- GO2-83-844, Forwards Response to Specific Issues Raised in Sser 3 (NUREG-0892) Addressing Seismic Qualification of safety- Related Electrical & Mechanical Equipment + (12:30:11, 8 January 2025)
- ML17277A811 + (12:30:20, 8 January 2025)
- ML17277A808 + (12:30:21, 8 January 2025)
- GO2-83-840, Clarifies Use of Quality Verification Instruction QVI-09 by Facility Project Visual Exam Acceptance Criteria for Reverification Insp of Welded Structures.Revised Page 3.8-190 to Be Incorporated Into Amend to FSAR + (12:30:22, 8 January 2025)
- GO2-83-833, Updates Response to Rev 1 to NUREG-0313 Re Intergranular Stress Corrosion Cracking in Bwrs.Summary of Selection Process Used to Determine Welds Receiving Induction Heating Stress Improvement Treatment Listed + (12:30:31, 8 January 2025)
- GO2-83-832, Advises of Util Decision to Add Auxiliary Steam Isolation Devices to Reduce Potential Reactor Bldg Accident Environ Conditions.Facility Can Be Operated Safely Until Mod Completed for Listed Reasons + (12:30:35, 8 January 2025)
- GO2-83-831, Forwards Response to SER (NUREG-0892),Confirmatory Issue 7, Question 110.42 Re Component Supports.Data Quantifies Difference Between Support Design Load W/ & W/O Inclusion of Thermal Loads + (12:30:39, 8 January 2025)
- ML17277A800 + (12:30:42, 8 January 2025)
- GO2-83-842, Forwards Environ Qualification Rept for safety-related Equipment.Justification for Interim Operation Included in Rev to Rept + (12:30:43, 8 January 2025)
- GO2-83-828, Restates Util Commitment to Install Diesel Starting Air Dryers at First Refueling Outage,Not by Fuel Load. Installation Unnecessary at Fuel Load to Complete Safe Reliable Station + (12:30:45, 8 January 2025)
- ML17277A797 + (12:30:49, 8 January 2025)
- ML17277A796 + (12:30:52, 8 January 2025)
- ML17277A795 + (12:30:53, 8 January 2025)
- ML17277A789 + (12:30:54, 8 January 2025)
- GO2-83-785, Provides Addl Response to Generic Ltr 83-24 Re TMI Action Plan Item I.G.1.Response Provides Justification for Elimination of Station Blackout Test & Restatement of WPPSS, Unit 2 Approach to Compliance w/I.G.1 + (12:30:55, 8 January 2025)
- ML17277A785 + (12:30:58, 8 January 2025)
- ML17277A784 + (12:30:59, 8 January 2025)
- GO2-83-727, Forwards Draft Test Procedure & FSAR Section Re Verification of UHS Performance.One Test Objective Is to Suppl & Extend Wind Speed Range of Previous Drift Loss Testing.Test to Be Conducted When Plant & Environ Conditions Optimum + (12:31:00, 8 January 2025)
- ML17277A780 + (12:31:04, 8 January 2025)
- ML17277A779 + (12:31:04, 8 January 2025)
- ML17277A777 + (12:31:06, 8 January 2025)
- ML17277A776 + (12:31:08, 8 January 2025)
- GO2-83-732, Forwards Info Describing Actions Taken to Resolve Const Issues Identified in IE Insp Rept 50-397/83-29,per 830715 Submittal.Schedules for Completion & Status of Programs Addressing Broad Issues Also Encl + (12:31:09, 8 January 2025)