Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203C562 + (06:45:04, 8 December 2024)
- PNO-III-91-033, on 970724,State of Mi Was Removed from Membership in Midwest Low-Level Radwaste Compact at Special Meeting in Detroit.Compact Commission Designated Ohio as New Host State W/Minnesota as Alternate Location + (06:45:04, 8 December 2024)
- ML20203C560 + (06:45:05, 8 December 2024)
- ML20203C556 + (06:45:06, 8 December 2024)
- ML20203C555 + (06:45:06, 8 December 2024)
- U-602881, Monthly Operating Rept for Nov 1997 for Clinton Power Station,Unit 1 + (06:45:07, 8 December 2024)
- ML20203C551 + (06:45:08, 8 December 2024)
- ML20203C550 + (06:45:08, 8 December 2024)
- ML20203C548 + (06:45:09, 8 December 2024)
- ML20203C546 + (06:45:10, 8 December 2024)
- ML20203C547 + (06:45:10, 8 December 2024)
- ML20203C541 + (06:45:11, 8 December 2024)
- ML20203C540 + (06:45:12, 8 December 2024)
- B12040, Requests Meeting to Discuss Proposed Revs to App R Shutdown Process.Revs Include Use of Unit 1 to Supply Emergency Power to Unit 2 During Fire & Installation of Isolation Switches in Control Room.Comments Requested + (06:45:14, 8 December 2024)
- ML20203C536 + (06:45:15, 8 December 2024)
- ML20203C537 + (06:45:15, 8 December 2024)
- ML20203C535 + (06:45:16, 8 December 2024)
- B17650, Revises Statement in Proposed Rev to TSs Re Deletion of Hydrogen Purge TS as Provided in .Change Clarifies Availability of Hydrogen Purge Sys as Backup Sys to safety- Related Hydrogen Recombiners + (06:45:17, 8 December 2024)
- PNO-III-91-028, Midwest Low Level Radwaste Compact Has Scheduled Special Meeting for 910724 to Consider Terminating Membership of Michigan.Compact Commission Dissatisfied W/Michigan Failure to Identify Disposal Facility Site + (06:45:17, 8 December 2024)
- ML20203C529 + (06:45:18, 8 December 2024)
- ML20203C527 + (06:45:20, 8 December 2024)
- ML20203C526 + (06:45:20, 8 December 2024)
- PNO-II-91-044, on 910709,licensee Inadvertently Transferred Approx 400 Gallons of Liquid Containing Small Amounts of U from Favorable Geometry Tank (T-417) to Unfavorable Tank (V-103).State of Nc Notified + (06:45:21, 8 December 2024)
- ML20203C525 + (06:45:21, 8 December 2024)
- 3F0199-01, Forwards Addl Info Re post-modification Testing of HPI & EFW Systems for Plant Changes Associated with Proposed LARs 240 & 241,dtd 981123 & 24.Some Details of Plans May Change as Specifics of Test Procedures Are Developed + (06:45:22, 8 December 2024)
- AECM-86-0089, Responds to NRC Re Violations Noted in Insp Rept 50-416/86-02.Corrective Actions:Broader Review Program to Evaluate FSAR Changes to Be Implemented.Mgt Control Info & Actions Re FSAR Update Program Encl,Per Request + (06:45:23, 8 December 2024)
- ML20203C518 + (06:45:24, 8 December 2024)
- ML20203C517 + (06:45:24, 8 December 2024)
- BVY-97-164, Provides Vermont Yankees Response to NRC RAI to Complete Review of Proposed TS Change Number 185,dtd 960911 + (06:45:25, 8 December 2024)
- ML20203C514 + (06:45:27, 8 December 2024)
- B17614, Informs That Util Reviewed Mnps,Unit 2 Independent Corrective Action Verification Program Rept,Issued 990112 by Parsons Group.Encl Response Addresses Findings & Recommendations Contained in Subject Rept + (06:45:28, 8 December 2024)
- 05000334/LER-1998-001-01, :on 980115,failure to Perform Required Valve Surveillance for CC & SW as Required by TSs Were Noted. Caused by Inadequate Application of Tss.Unit 1 Surveillance Procedures Will Be Revised + (06:45:30, 8 December 2024)
- ML20203C507 + (06:45:31, 8 December 2024)
- ML20203C505 + (06:45:33, 8 December 2024)
- ML20203C503 + (06:45:33, 8 December 2024)
- PNO-II-91-074B, on 911123,unit Remained in Cold Shutdown,Per Declaration of Alert at 0214 Due to Leak in Rcs.As of 911126,total of 7,800 Gallons of Treated Water Released from Plant to Lake Hartwell + (06:45:34, 8 December 2024)
- IR 05000373/1986022 + (06:45:35, 8 December 2024)
- ML20203C495 + (06:45:36, 8 December 2024)
- U-600536, Responds to 860318 Request for Addl Info Re Control Sys Failure (Outstanding Licensing Issue 15). TOP-DOWN Approach Used to Resolve Issue.Addl Analysis Will Be Completed Prior to Operation Above 5% Rated Power + (06:45:37, 8 December 2024)
- ML20203C489 + (06:45:37, 8 December 2024)
- ML20203C486 + (06:45:38, 8 December 2024)
- ML20203C485 + (06:45:39, 8 December 2024)
- ML20203C481 + (06:45:40, 8 December 2024)
- ML20203C479 + (06:45:45, 8 December 2024)
- ML20203C476 + (06:45:45, 8 December 2024)
- ML20203C475 + (06:45:46, 8 December 2024)
- ML20203C474 + (06:45:47, 8 December 2024)
- ML20203C473 + (06:45:47, 8 December 2024)
- ML20203C471 + (06:45:48, 8 December 2024)
- ML20203C472 + (06:45:48, 8 December 2024)
- A05625, Submits Addl Info Re Preventive Maint & Surveillance Programs for Reactor Trip Breakers,Per 860307 SER on Response to Generic Ltr 83-28,Items 4.2.1 & 4.2.2.Insp of Trip Latch Engagement Performed Per GE Procedures + (06:45:49, 8 December 2024)