- ML17347A593 + (15:40:31, 7 January 2025)
- 05000250/LER-1987-017, :on 870528,29 & 0603,normal & Emergency Boration Flow Paths Lost.Caused by Damaged in-board Mechanical Seal on Boric Acid Transfer Pumps 4B.Mechanical Seal Inspected & Repaired + (15:40:32, 7 January 2025)
- ML17347A590 + (15:40:41, 7 January 2025)
- ML17347A587 + (15:40:42, 7 January 2025)
- 05000250/LER-1987-016, :on 870526,while in Mode 6,partial Actuation of Train a Safeguards Equipment Occurred.Caused by Sticking Safety Injection Block Switch.Switch Inspected,Cleaned & Returned to Svc + (15:40:44, 7 January 2025)
- L-87-266, Remits Fee for Util 870304 Request for Extension of Administrative 7-day Allowable out-of-svc Time for Emergency Diesel Generators,Per RM Diggs 870611 Request.Fee Remitted Even Though Request Subsequently Withdrawn + (15:40:45, 7 January 2025)
- ML17347A585 + (15:40:45, 7 January 2025)
- L-87-272, Advises That Work on Mods Required to Satisfy NUREG-0737, Item III.D.3.4 Re Control Room Habitability Requirements,Per 860825 Application for Amends to Licenses DPR-31 & DPR-41 Will Begin After Both Units Return to Power + (15:40:47, 7 January 2025)
- 05000250/LER-1987-018, :on 870526,determined That Subsequent to Large Break Loca,Procedures Would Allow Period of Time W/No Safety Injection Flow While Performing Switchover to Cold Leg Recirculation.Procedures Will Be Revised + (15:40:50, 7 January 2025)
- ML17347A580 + (15:40:52, 7 January 2025)
- ML17347A578 + (15:40:53, 7 January 2025)
- L-87-254, Provides Results of 870608-13 Insp of Steam Generators.Steam Generator Tube Plugged as Result of Insp Listed + (15:40:54, 7 January 2025)
- ML17347A576 + (15:40:54, 7 January 2025)
- L-87-253, Responds to Violations Noted in Insp Repts 50-250/87-14 & 50-251/87-14.Corrective Actions:Individual Involved Counseled & Training Dept Will Evaluate Event for Appropriate Training Requirement & Methods + (15:40:59, 7 January 2025)
- 05000251/LER-1987-010-02, :on 870522,emergency Diesel Generator auto-started During Testing of 4,160-volt Bus Undervoltage Protection Circuit.Caused by Personnel Error.Personnel Counseled & Procedure Revised + (15:41:02, 7 January 2025)
- L-87-263, Forwards Regulatory Rept for June 1987,consisting of Current Integrated Schedule W/Correct Baseline Schedules for Forthcoming Integrated Schedule License Amend.Rept Provided as Update to Rept Transmitted on 870427 + (15:41:04, 7 January 2025)
- IR 05000250/1987022 + (15:41:09, 7 January 2025)
- ML17347A567 + (15:41:11, 7 January 2025)
- ML17347A566 + (15:41:11, 7 January 2025)
- ML17347A564 + (15:41:12, 7 January 2025)
- IR 05000250/1987015 + (15:41:13, 7 January 2025)
- 05000250/LER-1987-015, :on 870522,design Basis Reconstitution Revealed Potential Loss of HVAC in Inverter & Battery Rooms.Caused by Mods to Original Plant Design.Maint & Insp Procedures Implemented for Air Conditioning Units + (15:41:18, 7 January 2025)
- 05000250/LER-1987-014, :on 870519,while Unit in Mode 6,determined That Design Discrepancy Existed in Containment Spray Sys.Caused by Flow Orifice in Discharge Line Not Incorporated in Field. Design Mods Will Be Implemented for Correction + (15:41:20, 7 January 2025)
- L-87-219, Advises of Intention to Issue Ser,Addressing Permanent Incorporation of Continuous Tube Cleaning Sys Into Plant Design & Final Resolution of Need to Upgrade Cv 2201, Following Tube Cleaning Sys Evaluation Period + (15:41:21, 7 January 2025)
- L-87-256, Forwards Performance Enhancement Program (Pep) Selected Sys Review for May 1987.Listed Changes to Pep Requested + (15:41:22, 7 January 2025)
- ML17347A556 + (15:41:25, 7 January 2025)
- ML17347A555 + (15:41:26, 7 January 2025)
- 05000251/LER-1987-009-02, :on 870516,diesel Generator Ready to Start Light Went Out Causing Loss of Emergency Power Supply for RHR Sys.Caused by Inadvertent Bumping of Telemand Transfer Relay 2X4-3A.Normal Power Supply Restored + (15:41:27, 7 January 2025)
- 05000250/LER-1987-013, :on 870514,Tech Spec Required Surveillance of Spent Fuel Pit Exhaust Monitor Missed.Caused by Personnel Error.Procedure O-PMI-67.11 Will Be Revised & Other Surveillance Procedures Will Be Reviewed + (15:41:29, 7 January 2025)
- L-87-244, Advises That Estimated Cost of Implementing Boise Interagency Fire Ctr Survey Recommendations to Establish NRC Communications at Util Sites & Offsite Facilities Would Be $4,000,per NRC 860521 Request + (15:41:30, 7 January 2025)
- ML17347A547 + (15:41:32, 7 January 2025)
- ML17347A546 + (15:41:33, 7 January 2025)
- IR 05000251/1987016 + (15:43:10, 7 January 2025)
- ML17347A540 + (15:43:12, 7 January 2025)
- ML17347A538 + (15:43:13, 7 January 2025)
- TAC:57398 + (15:43:14, 7 January 2025)
- ML17347A536 + (15:43:15, 7 January 2025)
- 05000250/LER-1987-012, :on 870507,emergency Diesel Generator auto-started Due to Personnel Error in Failing to Lift Clearance Prior to Performing Steps of Procedure.Operator Counseled & Supervisor Briefing to Be Detailed + (15:43:17, 7 January 2025)
- IR 05000250/1987025 + (15:43:19, 7 January 2025)
- ML17347A531 + (15:43:23, 7 January 2025)
- L-87-230, Forwards Request for Relief from Visual (VT-2) Exam Required by IWA-5246, Repaired or Replaced Components & Alteration of Sys, Required by ASME Boiler & Pressure Vessel Code Section Xi.Basis for Request Encl.Fee Paid + (15:43:24, 7 January 2025)
- L-87-238, Forwards Revised Pages to Inservice Test Program for Valves. Changes Required Due to Plant Changes/Mods or to Correct Errors in Inservice Test Program + (15:43:26, 7 January 2025)
- L-87-239, Special Rept:Fire Barriers Breached for Longer than 7 Days. Fire Protection Was Impaired.Caused by App R Alternative Shutdown Work.Plant Continues to Implement Compensatory Measures as Applicable.Breached Barriers Listed + (15:43:28, 7 January 2025)
- IR 05000250/1987021 + (15:43:32, 7 January 2025)
- ML17347A522 + (15:43:34, 7 January 2025)
- L-87-229, Submits Listed Changes to Performance Enhancement Program, Project 1,Task 4 for Approval,Per NRC 860812 Confirmatory Order + (15:43:35, 7 January 2025)
- ML17347A521 + (15:43:35, 7 January 2025)
- ML17347A519 + (15:43:38, 7 January 2025)
- ML17347A518 + (15:43:39, 7 January 2025)
- L-87-233, Advises That Current Schedule for Closing Equipment Hatch & Setting Missile Shields Will Be 870605 & 08,respectively,per Safeguards Program.Surveillance Seals Installed on Reactor Vessel Head on 870521 & Camera Removed from Containment + (15:43:40, 7 January 2025)
- L-87-234, Requests Limited & Temporary Exemption from Requirements of 10CFR73.57 to Allow Certain Employees Unescorted Access to Nuclear Facilities Until Results of FBI Check of Criminal History Records Secured + (15:43:42, 7 January 2025)