Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18011A806 + (11:24:13, 7 January 2025)
- 05000400/LER-1995-002, :on 950207,unanalyzed Condition Existed Re Potential of Loss of Automatic ESF Actuations & Subsequent TS 3.0.3 Entry.Caused by Both Trains of Ssps Declared Inoperable.Plant Evolutions Avoided + (11:24:15, 7 January 2025)
- ML18011A803 + (11:24:17, 7 January 2025)
- ML18011A802 + (11:24:18, 7 January 2025)
- ML18011A801 + (11:24:18, 7 January 2025)
- HNP-95-028, Forwards Semiannual Radioactive Effluent Release Rept Jul- Dec 1994. Rev 5 to ODCM Also Encl + (11:24:19, 7 January 2025)
- HNP-95-025, Responds to Violations Noted in Insp Rept 50-400/94-23. Corrective Actions:Event Review Team Assembled to Analyze & Perform Root Cause Investigation for Event + (11:24:21, 7 January 2025)
- ML18011A797 + (11:24:23, 7 January 2025)
- HNP-95-018, Annual Operating Rept, Consisting of Info Re Number of Individuals Receiving Exposures Greater than 100 Mrem/Yr, Primary Coolant Iodine Spikes & Challenges to PORVs & Safety Valves for 1994 + (11:24:24, 7 January 2025)
- TAC:M86849 + (11:24:25, 7 January 2025)
- ML18011A794 + (11:24:30, 7 January 2025)
- 05000400/LER-1995-001-02, :on 950119,determined That Deficiency Existed in Operability Verification Test for Thermal Overload Bypass Circuitry Due to Procedural Inadequacies.Review Performed of Applicable Surveillance Test Procedures + (11:24:31, 7 January 2025)
- HNP-95-017, Monthly Operating Rept for Jan 1995 for Shearon Harris Nuclear Power Plant + (11:24:32, 7 January 2025)
- ML18011A789 + (11:24:34, 7 January 2025)
- IR 05000400/1994021 + (11:24:35, 7 January 2025)
- ML18011A787 + (11:24:36, 7 January 2025)
- HNP-95-012, Informs That Util Scheduled Emergency Preparedness Exercise for Shnpp for 950418.Exercise Scope & Objectives Encl + (11:24:37, 7 January 2025)
- ML18011A780 + (11:24:38, 7 January 2025)
- HNP-95-011, Forwards Rev 2 to Harris Unit 1,Cycle 6 Colr + (11:24:39, 7 January 2025)
- HNP-95-014, Responds to Request for Status on Installed Westinghouse Alloy 600 Thermally Treated Mechanical Plugs Per NRC Bulletin 89-001 + (11:24:41, 7 January 2025)
- IR 05000400/1994024 + (11:24:45, 7 January 2025)
- ML18011A773 + (11:24:47, 7 January 2025)
- ML18011A774 + (11:24:47, 7 January 2025)
- ML18011A772 + (11:24:48, 7 January 2025)
- HNP-95-008, Application for Amend to License NPF-63,revising TS SR 4.0.3 & Associated Bases to Provide for Delay in Which to Perform Surveillance Discovered Not Performed within Specified Frequency + (11:24:49, 7 January 2025)
- HNP-95-004, Monthly Operating Rept for Dec 1994 for Shearon Harris Nuclear Power Plant + (11:24:50, 7 January 2025)
- HNP-95-007, Provides Revised Version of CP&L Reply to NOV Submitted on 950106.Revised Response Corrects Date When Full Compliance Will Be Achieved Section of Original Response Ltr from 940331 to 950331 + (11:24:52, 7 January 2025)
- HNP-95-001, Advises That Util Commits to Implement Current Order Surveillance Test as Recommended by WOG in Recommended Rod Control Sys Surveillance Test, Distributed to WOG Member Utils on 940408,in Response to NRC 941212 RAI Re GL 93-04 + (11:24:54, 7 January 2025)
- TAC:M86949 + (11:24:54, 7 January 2025)
- HNP-94-003, Confirms 941014 Telcon Discussions & CP&L Intent to Provide Package Which Follows Guidance in NRC 940712 Memo Entitled, Guidance on Closure of Staff Review of GL 89-10 Programs by 950228 + (11:24:56, 7 January 2025)
- ML18011A762 + (11:24:58, 7 January 2025)
- ML18011A761 + (11:24:59, 7 January 2025)
- ML18011A760 + (11:25:00, 7 January 2025)
- ML18011A759 + (11:25:01, 7 January 2025)
- ML18011A756 + (11:25:05, 7 January 2025)
- ML18011A753 + (11:25:06, 7 January 2025)
- IR 05000400/1994022 + (11:25:07, 7 January 2025)
- ML18011A751 + (11:25:08, 7 January 2025)
- ML18011A750 + (11:25:09, 7 January 2025)
- ML18011A749 + (11:25:10, 7 January 2025)
- HNP-94-098, Responds to NRC Re Violations Noted in Insp Rept 50-400/94-22.Corrective Actions:Revised Plant Administrative Procedure AP-002, Plant Conduct of Operations, to Include Section Entitled, Control of Designated Vehicles + (11:25:11, 7 January 2025)
- HNP-94-103, Forwards Response to Portions of Sections of 940214 Response to RAI Re Util Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers That Were Deferred Until Completion of Industry Testing Conducted by Nuclear Energy Inst + (11:25:13, 7 January 2025)
- HNP-94-099, Responds to ,Confirming That Util Plans to Submit Requested Addl Info on 950116 Re IPE + (11:25:14, 7 January 2025)
- HNP-94-086, Application for Amend to License NPF-63,requesting one-time Schedular Rev to TS Re Containment Leak Rate Testing + (11:25:16, 7 January 2025)
- HNP-94-102, Submits Info Per 10CFR50.46(a)(3)(ii) for Shnpp Re Estimated Effect of Significant Changes or Errors in ECCS Evaluation Models or in Application of Models + (11:25:18, 7 January 2025)
- 05000400/LER-1994-007-02, :on 941128,violations of TS Min Control Room Staffing Requirements Occurred.Caused by Personnel Error. Individuals Involved Counseled & Received Disciplinary Measures + (11:25:20, 7 January 2025)
- ML18011A738 + (11:25:22, 7 January 2025)
- ML18011A737 + (11:25:23, 7 January 2025)
- ML18011A736 + (11:25:24, 7 January 2025)
- ML18011A735 + (11:25:25, 7 January 2025)
- ML18011A733 + (11:25:27, 7 January 2025)