HNP-95-011, Forwards Rev 2 to Harris Unit 1,Cycle 6 Colr
| ML18011A778 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 01/31/1995 |
| From: | Robinson W CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18011A779 | List: |
| References | |
| HNP-95-011, HNP-95-11, HO-950125, NUDOCS 9502070116 | |
| Download: ML18011A778 (4) | |
Text
PRIORITY 1
(ACCELERATED RIDS Pf(OCESSliG REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9502070116 DOC.DATE: 95/01/31 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.
Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Application for amend to license NPF-63 re Rev 2 to plant COLR for Cycle 6.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE-TITLE: OR Submittal:
General Distribution NOTES:Application for permit renewal filed.
DOCKET I 05000400 05000400 RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 6
6 1
1 1
1 1
0 1
1 RECIPIENT ID CODE/NAME PD2-1 PD FILE CENE'E~
1 NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 iXOTETO ALL RIDS" RECIPIEYTS:
PLEASE HELP US TO REDUCE iiVASTE!COYTACT'IHE DOCL'~IEYTCONTROL DESk, ROOM Pl-37 (EXT. 504-~083 ) TO ELlliIIY%TE YOI.'R NA!i!LI'RO~I DISTRIBU'I'IOYLISTS I'OR DOC!.'!i!E~'I'S5'OL'OY,"I Yl I'.D!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 17 ENCL 16
Carolina Power &Light Company PO Box 165 New Hill NC 27562 JAM 3I t9S5 William R. Robinson Vice President Harris Nuclear Plant File Number: HO-950125 SERIAL:
HNP-95-011 United States Nuclear Regulatory Commission ATTENTION:
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REVISION TO THE CORE OPERATING LIMITS REPORT Gentlemen:
In accordance with Technical Specification 6.9.1.6.4, Carolina Power 8c Light Company hereby submits Revision 2 to the Shearon Harris Nuclear Power Plant Core Operating Limits Report (COLR) for Cycle No. 6.
This revision is required to incorporate revised V(Z) data to be used in monitoring core Thermal Limits. This data isa more accurate fit to the V(Z) data used in the Cycle No.
6 Safety Evaluation than the V(Z) curve in Revision 1 to the COLR.
Questions regarding this matter may be referred to Mr. R. W. Prunty at (919) 362-2030.
Sincerely, W. R. Robinson LSR/lsr Enclosure c:
Mr. S. D. Ebneter Mr. S. A. Elrod Mr. N. B. Le P.rtf < pn
~ 4t
.Lr' 95020706 950}3} PDR ADOCK OS000400 P PDR State Road 1134 New Hill NC Tel 919 362-2502 Fax 919 362-6950
t}}