Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HNP-95-078, Monthly Operating Rept for Aug 1995 for Shearon Harris Nuclear Power Plant + (11:21:00, 7 January 2025)
- ML18011B009 + (11:21:02, 7 January 2025)
- ML18011B007 + (11:21:03, 7 January 2025)
- ML18011B008 + (11:21:03, 7 January 2025)
- ML18011B006 + (11:21:04, 7 January 2025)
- ML18011B004 + (11:21:05, 7 January 2025)
- IR 05000400/1995010 + (11:21:06, 7 January 2025)
- HNP-95-074, Provides 90 Day Response to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity + (11:21:07, 7 January 2025)
- HNP-95-073, Monthly Operating Rept for Jul 1995 for Shearon Harris Nuclear Power Plant + (11:21:09, 7 January 2025)
- ML18011A996 + (11:21:11, 7 January 2025)
- HNP-95-072, Requests That 950320 Request for License Amend Re Reactor Trip Sys Instrumentation Setpoint Relocation to COLR Be Withdrawn,Per NRC Position That TS Parameters in Questions Would Not Meet Commission Criteria for Relocation + (11:21:12, 7 January 2025)
- ML18011A994 + (11:21:15, 7 January 2025)
- IR 05000400/1995030 + (11:21:17, 7 January 2025)
- ML18011A991 + (11:21:18, 7 January 2025)
- ML18011A990 + (11:21:19, 7 January 2025)
- IR 05000400/1995011 + (11:21:24, 7 January 2025)
- ML18011A987 + (11:21:26, 7 January 2025)
- NUREG-1431, Safety Evaluation Supporting Amend 60 to License NPF-63 + (11:21:27, 7 January 2025)
- ML18011A980 + (11:21:28, 7 January 2025)
- ML18011A979 + (11:21:30, 7 January 2025)
- HNP-95-070, Provides Rev to in 950501 Violation Response Re Insp Rept 50-400/95-04.Rev Reflects Revised Actual Completion Dates + (11:21:34, 7 January 2025)
- ML18011A976 + (11:21:34, 7 January 2025)
- ML18011A971 + (11:21:36, 7 January 2025)
- ML18011A970 + (11:21:37, 7 January 2025)
- HNP-95-067, Provides Addl Info in Support of 950405 License Amend Request Re Refueling Operations Section 3/4.9 of Shnpp TS + (11:21:38, 7 January 2025)
- HNP-95-051, Forwards Technical Info Re Area Temp Monitoring TS (3/4.7.12),as Requested During Telcon W/Nrc Re 941024 Request for License Amend Re Relocation of Selected TS in Accordance w/NUREG-1431 + (11:21:40, 7 January 2025)
- HNP-95-068, Informs That Td Walt Has Assumed Position of Manager, Regulatory Affairs at Plant + (11:21:42, 7 January 2025)
- IR 05000400/1995008 + (11:21:44, 7 January 2025)
- ML18011A962 + (11:21:45, 7 January 2025)
- ML18011A961 + (11:21:46, 7 January 2025)
- TAC:M87251 + (11:21:47, 7 January 2025)
- ML18011A959 + (11:21:48, 7 January 2025)
- ML18011A957 + (11:21:49, 7 January 2025)
- IR 05000507/2006010 + (11:21:50, 7 January 2025)
- ML18011A953 + (11:21:52, 7 January 2025)
- ML18011A954 + (11:21:52, 7 January 2025)
- HNP-95-056, Provides Suppl Info Re CP&L 950330 Application for Amend to License NPF-63,revising EDG SRs to Address NRC Questions Communicated on 950510 + (11:21:53, 7 January 2025)
- HNP-95-063, Withdraws 930820 Request to Revise TS 3/4.4.5, SGs to Allow Repair of Degraded SG Tubes by Sleeving as Alternative to Removing Tube from Svc by Plugging + (11:21:55, 7 January 2025)
- ML18011A950 + (11:21:55, 7 January 2025)
- HNP-95-060, Responds to NRC Re Violation Noted in Insp Rept 50-400/95-08.Corrective Actions:Individual Involved in Incident Cited Received One on One Training on Plant Administrative Procedure AP-002,Section 5.32.3 + (11:21:57, 7 January 2025)
- ML18011A947 + (11:21:59, 7 January 2025)
- HNP-95-061, Forwards Plant IPEEE Final Rept in Response to GL 88-20, Suppl 4 + (11:22:00, 7 January 2025)
- HNP-95-059, Forwards Plant Response to GL 95-03, Circumferential Cracking of SG Tubes + (11:22:02, 7 January 2025)
- ML18011A941 + (11:22:04, 7 January 2025)
- 05000400/LER-1995-003-01, :on 950518,deficiency Identified in Testing Method for Cooling Water Supply Valves for ESW Intake Structure.Caused by Deficient TS Sps.Surveillance Test Procedures OST-1214 & OST-1215 Revised + (11:22:08, 7 January 2025)
- 05000400/LER-1995-004-01, :on 950524,identified Possibility That Blown Fuse in Control Power Circuit Could Affect Hydraulic Pump. Caused by Discrepancy Between Circuit Wiring & Diagrams for Control Board Alarm.Drawing Review Completed + (11:22:10, 7 January 2025)
- IR 05000400/1995009 + (11:22:19, 7 January 2025)
- ML18011A936 + (11:22:21, 7 January 2025)
- ML18011A935 + (11:22:21, 7 January 2025)
- ML18011A934 + (11:22:22, 7 January 2025)
- ML18011A931 + (11:22:25, 7 January 2025)