Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18024A894 + (09:25:16, 7 January 2025)
- ML18024A891 + (09:25:18, 7 January 2025)
- ML18024A889 + (09:25:19, 7 January 2025)
- ML18024A890 + (09:25:19, 7 January 2025)
- ML18024A887 + (09:25:20, 7 January 2025)
- 05000260/LER-1978-013, Has Been Voided + (09:25:22, 7 January 2025)
- 05000260/LER-1978-007, Has Been Voided + (09:25:24, 7 January 2025)
- 05000260/LER-1978-012, Has Been Voided + (09:25:26, 7 January 2025)
- 05000260/LER-1979-016-03, /03L-0 on 790605:pressure Switches PS-1-81A & B & Setpoints PS-1-91A & B Exceeded Tech Spec Limits During Test.Caused by Instrument Drift.Switches Recalibr & Tested Satisfactorily + (09:25:32, 7 January 2025)
- 05000260/LER-1979-016, Forwards LER 79-016/03L-0 + (09:25:34, 7 January 2025)
- ML18024A877 + (09:25:36, 7 January 2025)
- ML18024A876 + (09:25:38, 7 January 2025)
- ML18024A874 + (09:25:38, 7 January 2025)
- 05000260/LER-1979-014-01, /01T-0 on 790526:during Cold Shutdown for Refueling,Local Leak Rate Was Found to Exceed Tech Spec Levels.Caused by Deterioration of Valve Seats in Main Steam, Ventilation, Feedwater & RCIC Sys.Valves Repaired + (09:25:42, 7 January 2025)
- 05000260/LER-1979-012-03, /03L-0 on 790528:during post-refueling Startup Testing of RCIC Turbine, Electronic Overspeed Device Could Not Be Reset.Caused by Failure of Electronic Overspeed Device,Airpax Model FSS 406.Overspeed Device Replaced + (09:25:44, 7 January 2025)
- 05000260/LER-1979-012, Forwards LER 79-012/03L-0 + (09:25:46, 7 January 2025)
- ML18024A861 + (09:25:47, 7 January 2025)
- ML18024A858 + (09:25:48, 7 January 2025)
- ML18024A857 + (09:25:49, 7 January 2025)
- ML18024A856 + (09:25:50, 7 January 2025)
- IR 05000259/1979008 + (09:25:51, 7 January 2025)
- ML18024A850 + (09:25:52, 7 January 2025)
- ML18024A847 + (09:25:53, 7 January 2025)
- ML18024A848 + (09:25:53, 7 January 2025)
- 05000260/LER-1979-010-03, /03L-0 on 790510:residual Heat Removal Sys Snubber Came Apart Upon Removal for Testing.Caused by Piston Unscrewing from Rod After Locking Key Vibrated Loose.Snubber Replaced & Other Snubber Tested + (09:25:58, 7 January 2025)
- 05000260/LER-1979-010, Forwards LER 79-010/03L-0 + (09:26:00, 7 January 2025)
- 05000260/LER-1979-009-03, /03L-0 on 790510:scram Accumulator Level Switch LS-2-85-34 for Control Rod Drivelines 58-39 & 58-19 Failed to Give Annunciation for High Accumulator Level.Caused by Switch Failure + (09:26:02, 7 January 2025)
- 05000260/LER-1979-009, Forwards LER 79-009/03L-0 + (09:26:03, 7 January 2025)
- 05000296/LER-1979-006, Forwards LER 79-006/03L-0 + (09:26:06, 7 January 2025)
- ML18024A834 + (09:26:08, 7 January 2025)
- ML18024A833 + (09:26:09, 7 January 2025)
- 05000260/LER-1979-011-01, /01T-0 on 790526:while Pulling Control Rods,First Rod 26-27 in Group 3 Was Inadvertently Withdrawn Three Notches.Caused by Unexplained Factors.Procedures Were Revised + (09:26:10, 7 January 2025)
- ML18024A830 + (09:26:11, 7 January 2025)
- 05000260/LER-1979-011, Forwards LER 79-011/01T-0 + (09:26:12, 7 January 2025)
- ML18024A828 + (09:26:13, 7 January 2025)
- ML18024A827 + (09:26:14, 7 January 2025)
- 05000260/LER-1979-006-03, /03L-0 on 790427:prior to Refueling Shutdown, Drywell Prepurge Tritium Sample Not Taken.Caused by Lack of Understanding Between Operational & Lab Personnel.Operating Instructions Amended to Prevent Recurrence + (09:26:15, 7 January 2025)
- 05000260/LER-1979-006, Forwards LER 79-006/03L-0 + (09:26:17, 7 January 2025)
- ML18024A823 + (09:26:18, 7 January 2025)
- ML18024A818 + (09:26:19, 7 January 2025)
- 05000260/LER-1979-007-03, /03L-0 on 790503:during Refueling Outage,Five MSIVs Exceeded Leakage Limits.Caused by Irregularities on Valve Seating Surfaces & Entrapment of Debris Under Seating Surfaces.Valves Will Be Repaired & Retested + (09:26:21, 7 January 2025)
- 05000260/LER-1979-007, Forwards LER 79-007/03L-0 + (09:26:30, 7 January 2025)
- 05000260/LER-1979-008-01, /01T-0 on 790504:while Preparing for Refueling Outage,Secondary Containment Integrity Was Not Conclusively Demonstrated Prior to Breaking Primary Containment.Test Improperly Performed Due to Personnel Error + (09:26:32, 7 January 2025)
- 05000260/LER-1979-008, Forwards LER 79-008/01T-0 + (09:26:34, 7 January 2025)
- ML18024A808 + (09:26:36, 7 January 2025)
- ML18024A806 + (09:26:37, 7 January 2025)
- 05000260/LER-1979-005-03, /03L-0 on 790419:broken Terminal Discovered on Shutdown Board D Battery.Cause Unknown.Affected Cells Replaced & Personnel Instructed in Proper Tightening Methods + (09:26:38, 7 January 2025)
- 05000260/LER-1979-005, Forwards LER 79-005/03L-0 + (09:26:40, 7 January 2025)
- ML18024A800 + (09:26:41, 7 January 2025)
- ML18024A798 + (09:26:42, 7 January 2025)
- IR 05000259/1979005 + (09:26:43, 7 January 2025)