Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18095A068 + (08:20:49, 6 January 2025)
- ML18095A067 + (08:20:50, 6 January 2025)
- ML18095A065 + (08:20:51, 6 January 2025)
- ML18095A066 + (08:20:51, 6 January 2025)
- ML18095A064 + (08:20:52, 6 January 2025)
- TMI-18-044, Radiological Emergency Plan Revisions + (08:20:53, 6 January 2025)
- ML18095A058 + (08:20:55, 6 January 2025)
- L-2018-068, Florida Power and Light Co. - Response to Request for Additional Information Re Decommissioning Funding Plan Updates for Independent Spent Fuel Storage Installations + (08:20:56, 6 January 2025)
- ML18095A056 + (08:20:57, 6 January 2025)
- ML18095A054 + (08:20:58, 6 January 2025)
- ML18095A053 + (08:20:59, 6 January 2025)
- ML18095A050 + (08:21:00, 6 January 2025)
- LR-N18-0042, Guarantees of Payment of Deferred Premiums + (08:21:01, 6 January 2025)
- LR-N18-0041, Annual Property Insurance Status Report + (08:21:02, 6 January 2025)
- ML18095A039 + (08:21:02, 6 January 2025)
- PMNS20180444, Louisiana Energy Services (Les), LLC (D.B.A Urenco Usa)Licensee Performance Review Meeting + (08:21:03, 6 January 2025)
- ML18095A037 + (08:21:05, 6 January 2025)
- ML18095A029 + (08:21:05, 6 January 2025)
- BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test + (08:21:06, 6 January 2025)
- PMNS20180433, Honeywell Metropolis Workslicensee Performance Review Meeting + (08:21:07, 6 January 2025)
- ML18095A017 + (08:21:08, 6 January 2025)
- ML18095A014 + (08:21:09, 6 January 2025)
- IR 05000354/2018301 + (08:21:10, 6 January 2025)
- ML18095A010 + (08:21:11, 6 January 2025)
- ML18095A007 + (08:21:14, 6 January 2025)
- 05000316/LER-1978-101, Forwards LER 78-101/01T-0 + (08:21:15, 6 January 2025)
- ML18095A005 + (08:21:16, 6 January 2025)
- ML18094B454 + (08:21:17, 6 January 2025)
- ML18094B453 + (08:21:18, 6 January 2025)
- ML18094B452 + (08:21:18, 6 January 2025)
- 05000272/LER-1990-012-01, :on 900409,reactor Trip on Steam Generator 12 lo-lo Level Occurred.Caused by Equipment Failure.Steam Generator 12 Governor Valve Linkage Repaired + (08:21:19, 6 January 2025)
- 05000272/LER-1990-011-01, :on 900406,turbine Trip & Feedwater Isolation Actuation Occurred on Steam Generator 14 hi-hi Level. Caused by Equipment Failure.Valve Stem on Valve 12TB10 Polished & Adjusted + (08:21:21, 6 January 2025)
- ML18094B448 + (08:21:22, 6 January 2025)
- 05000272/LER-1990-010-01, :on 900403,reactor Trip Signal Initiated Due to lo-lo Level in Steam Generator 12.Caused by Personnel Error. Event Reviewed by Operations Dept Mgt & Personnel Involved Held Accountable + (08:21:23, 6 January 2025)
- ML18094B446 + (08:21:24, 6 January 2025)
- ML18094B445 + (08:21:25, 6 January 2025)
- ML18094B444 + (08:21:28, 6 January 2025)
- 05000272/LER-1990-009-01, :on 900328,main Steamline Isolation Signal Actuated During Performance of Channel I Main Steamline Flow Calibr.Caused by Inadequate Procedure.Main Steamline Flow Detector Calibr Procedure Revised + (08:21:29, 6 January 2025)
- ML18094B441 + (08:21:31, 6 January 2025)
- ML18094B439 + (08:21:31, 6 January 2025)
- ML18094B438 + (08:21:32, 6 January 2025)
- ML18094B437 + (08:21:33, 6 January 2025)
- ML18094B436 + (08:21:34, 6 January 2025)
- 05000272/LER-1990-008-01, :on 900327,controlled Shutdown Commenced,Per Tech Spec Action Statement Due to Inoperability of Safeguards Equipment Controls Cabinet 1A.Caused by Equipment Failure.Spare Chassis Installed + (08:21:35, 6 January 2025)
- ML18094B434 + (08:21:36, 6 January 2025)
- ML18094B432 + (08:21:37, 6 January 2025)
- TAC:76050 + (08:21:38, 6 January 2025)
- ML18094B431 + (08:21:39, 6 January 2025)
- ML18094B430 + (08:21:40, 6 January 2025)
- ML18094B428 + (08:21:41, 6 January 2025)
- ML18094B426 + (08:21:42, 6 January 2025)