Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000272/1997018 + (05:23:40, 6 January 2025)
- ML18106A240 + (05:23:42, 6 January 2025)
- LR-N970815, Forwards 90-day Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (05:23:43, 6 January 2025)
- 05000311/LER-1997-010, :on 970819,CR Operators Initiated Plant Shutdown to Comply W/Requirements of Ts.Caused by Design, Mfg Const/Installation Deficiencies.Calibr Procedure Revised + (05:23:50, 6 January 2025)
- 05000272/LER-1995-023, :on 940106,failed to Plug SG Tubes.Caused by Lack of Contractor Oversight in Area of Eddy Current Testing.Analyst Guidelines Specific to Salem,Units 1 & 2 & Performance Demonstration Program Were Developed + (05:23:53, 6 January 2025)
- 05000272/LER-1995-023-01, Forwards Supplemental LER 95-023-01 Re Failure to Plug SG Tubes Due to Missed Eddy Current Indications.Suppl Being Submitted to Discuss Cause & Safety Significance of Event + (05:23:57, 6 January 2025)
- ML18106A234 + (05:23:59, 6 January 2025)
- IR 05000272/1997019 + (05:24:23, 6 January 2025)
- ML18106A231 + (05:24:26, 6 January 2025)
- ML18106A230 + (05:24:27, 6 January 2025)
- ML18106A228 + (05:24:28, 6 January 2025)
- ML18106A227 + (05:24:29, 6 January 2025)
- ML18106A226 + (05:24:30, 6 January 2025)
- ML18106A223 + (05:24:32, 6 January 2025)
- ML18106A222 + (05:24:33, 6 January 2025)
- 05000311/LER-1997-016-02, :on 971125,inadequate TS Testing Main Steam Isolation Valve Hydraulic Unit Override Contacts Were Noted. Caused by Lack of Adequate Controls.Operability of MSIV Hydraulic Unit Will Be Verified + (05:24:35, 6 January 2025)
- LR-N970758, Informs That Pse&G Is Revising Commitment to State That RWST Low Level back-up Alarm Will Be Set at Same Level as Existing RWST Low Level Alarm + (05:24:37, 6 January 2025)
- 05000272/LER-1997-011-02, :on 971119,failure to Test Isolation of Sgb & SS on Automatic Start of Afps Was Noted.Caused by Inadequate Incorporation of DBA Mitigation Features Into Plant Tp.Pse&G Committed to Complete GL 96-01 Evaluations by 971231 + (05:24:41, 6 January 2025)
- 05000272/LER-1997-011, Forwards LER 97-011-00,re Failure to Test Isolation of SG Blowdown & Sampling Sys on Automatic Start of Afp,Per 10CFR50.73(a)(2)(ii)(A) + (05:24:44, 6 January 2025)
- 05000272/LER-1997-013-02, :on 970702,determined That EDG Should Have Been Declared Inoperable W/Test Instrumentation Connected.Caused by Personnel Error.Performed Satisfactory follow-up Test, Removed Equipment & Signed Off Procedure + (05:24:47, 6 January 2025)
- ML18106A214 + (05:24:49, 6 January 2025)
- ML18106A213 + (05:24:50, 6 January 2025)
- LR-N970663, Application for Amends to Licenses DPR-70 & DPR-75,revising TS to Adopt Option B of 10CFR50,App J,For Type B & C Testing & Modifying Existing TS Wording for Previous Adoption of Option B on Type a Testing + (05:24:51, 6 January 2025)
- LR-N970790, Submits Response to Violations Noted in Insp Repts 50-272/97-18 & 50-311/97-18.Corrective Actions:Reopened Valves on 970916 & Locally Verified Open by Loss Prevention Personnel + (05:24:53, 6 January 2025)
- LR-N970794, Monthly Operating Rept for Nov 1997 for Salem,Unit 1 + (05:24:57, 6 January 2025)
- LR-N970795, Monthly Operating Rept for Nov 1997 for Salem,Unit 2 + (05:24:59, 6 January 2025)
- ML18106A206 + (05:25:05, 6 January 2025)
- IR 05000272/1997020 + (05:25:10, 6 January 2025)
- ML18106A203 + (05:25:11, 6 January 2025)
- IR 05000272/1997081 + (05:25:13, 6 January 2025)
- ML18106A200 + (05:25:14, 6 January 2025)
- LR-N970774, Informs NRC That Util Is Modifying Original Commitment to Pursue Design Change to Replace Present Overhead Annunciator Sys W/New Sys Following Units Restart Re Insp Repts 50-272/95-81 & 50-311/95-81 + (05:25:15, 6 January 2025)
- ML18106A196 + (05:25:17, 6 January 2025)
- LR-N970779, Application for Amend to License DPR-70,requesting one-time Exemption to Allow Containment Purging in Modes 3 & 4 + (05:25:18, 6 January 2025)
- LR-N970747, Informs NRC Staff of Changes Made to Unit 1 Design That Differ from Mods Described in Submittals & NRC Se.Mods Do Not Differ from Those Described in Previous Correspondence + (05:25:20, 6 January 2025)
- ML18106A191 + (05:25:23, 6 January 2025)
- ML18106A189 + (05:25:24, 6 January 2025)
- 05000311/LER-1997-016-01, :on 970909,loss of Fire Protection Water to Auxiliary Bldgs & Containment Was Noted.Caused by Human Error Due to Inattention to Detail.Loss Prevention Tours Have Been Revised to Include Once Per Shift Verification + (05:25:26, 6 January 2025)
- 05000311/LER-1997-016, Forwards LER 97-016-00 Re Loss of Fire Protection Water to Auxiliary Bldgs & Containments.Ler Was Originally Submitted on 971015 as LER 97-003-00.Encl Is Being Resubmitted W/Next Sequential LER Number + (05:25:29, 6 January 2025)
- ML18106A183 + (05:25:32, 6 January 2025)
- ML18106A181 + (05:25:33, 6 January 2025)
- 05000272/LER-1997-016, ;on 970909,loss of FP Water to Salem,Units 1 & 2 Auxiliary Buildings & Containment Was Noted.Caused by Inadequate Control of 1RP5.Valves Were Opened & Locally Verified by Loss Prevention Personnel + (05:25:35, 6 January 2025)
- ML18106A179 + (05:25:36, 6 January 2025)
- LR-N970729, Special Rept 97-15,on 971022,2A EDG Declared Inoperable. Caused by Moisture Build Up in Starting Air headers.2A EDG Equipment Inspected Just Subsequent to Aborted Start + (05:25:38, 6 January 2025)
- ML18106A178 + (05:25:38, 6 January 2025)
- ML18106A175 + (05:25:41, 6 January 2025)
- ML18106A173 + (05:25:42, 6 January 2025)
- ML18106A172 + (05:25:43, 6 January 2025)
- ML18106A171 + (05:25:43, 6 January 2025)
- ML18106A170 + (05:25:44, 6 January 2025)
- ML18106A169 + (05:25:45, 6 January 2025)