Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18106A787 + (05:14:00, 6 January 2025)
- ML18106A785 + (05:14:02, 6 January 2025)
- LR-N980356, Documents Info Exchanged W/Nrc from 980616 Meeting Re Status of Design/Licensing Bases Review Project (Dlbrp).Attachment 1 Compares Original Dlbrp Methodology W/Util Planned Future Actions + (05:14:03, 6 January 2025)
- ML18106A783 + (05:14:05, 6 January 2025)
- ML18106A781 + (05:14:06, 6 January 2025)
- TAC:MA0883 + (05:14:06, 6 January 2025)
- ML18106A778 + (05:14:08, 6 January 2025)
- ML18106A774 + (05:14:13, 6 January 2025)
- LR-N980345, Requests Use of Portion of 1992 Edition of ASME Boiler & Pressure Vessel Code Section XI (IWA-4500).During Tenth Refueling Outage,Feedwater Nozzle Insps Will Be Performed & Weld Repair on SG Feedwater Nozzles May Be Required + (05:14:16, 6 January 2025)
- LR-N980346, Clarifies Commitment as Stated in Response to Question 2a of 980508 Response to NRC 980312 Rai.Sfp Liner Drain Lines Will Be Modified by Installation of Either Isolation Valves or Caps to Limit Leakage from SFP + (05:14:18, 6 January 2025)
- ML18106A760 + (05:14:20, 6 January 2025)
- ND-18-0511, Enclosure 4 - Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.c (Index Number 811) + (05:14:21, 6 January 2025)
- ML18106A757 + (05:14:21, 6 January 2025)
- ML18106A756 + (05:14:22, 6 January 2025)
- ML18106A755 + (05:14:22, 6 January 2025)
- ML18106A752 + (05:14:23, 6 January 2025)
- ML18106A754 + (05:14:23, 6 January 2025)
- ML18106A750 + (05:14:24, 6 January 2025)
- ML18106A747 + (05:14:25, 6 January 2025)
- ML18106A749 + (05:14:25, 6 January 2025)
- ML18106A745 + (05:14:26, 6 January 2025)
- ML18106A746 + (05:14:26, 6 January 2025)
- ML18106A744 + (05:14:27, 6 January 2025)
- ML18106A743 + (05:14:28, 6 January 2025)
- ND-18-0454, Unit 4, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.03.12a.i (Index Number 214) + (05:14:28, 6 January 2025)
- ND-18-0327, Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.02.05a.i (Index Number 19) + (05:14:29, 6 January 2025)
- ML18106A730 + (05:14:30, 6 January 2025)
- ML18106A737 + (05:14:30, 6 January 2025)
- ML18106A726 + (05:14:31, 6 January 2025)
- ML18106A724 + (05:14:32, 6 January 2025)
- ML18106A722 + (05:14:32, 6 January 2025)
- ML18106A721 + (05:14:33, 6 January 2025)
- LR-N980337, Forwards 90-day Rept for ISI Activities Conducted at Salem Generating Station,Unit 1,during Twelfth Refueling Outage. Rept Submitted IAW Plant TS Requirements & Article IWA-6210(c),6220(c) & 6230 of Section XI of ASME BPV Code + (05:14:34, 6 January 2025)
- LR-N980343, Provides Formally Documented Commitments Made by Pse&G During 980407 Meeting W/Nrc Relating to WRB-2 Correlation & Reload Analysis + (05:14:36, 6 January 2025)
- LR-N98-0334, Monthly Operating Rept for June 1998 for Salem,Unit 2 + (05:14:38, 6 January 2025)
- LR-N98-0333, Monthly Operating Rept for June 1998 for Salem,Unit 1 + (05:14:39, 6 January 2025)
- IR 05000272/1998003 + (05:14:42, 6 January 2025)
- ML18106A708 + (05:14:45, 6 January 2025)
- ML18106A706 + (05:14:46, 6 January 2025)
- ML18106A705 + (05:14:47, 6 January 2025)
- ML18106A703 + (05:14:48, 6 January 2025)
- ML18106A701 + (05:14:50, 6 January 2025)
- ML18106A699 + (05:14:51, 6 January 2025)
- ML18106A694 + (05:14:54, 6 January 2025)
- ML18106A696 + (05:14:54, 6 January 2025)
- 05000311/LER-1998-003-02, :on 980122,inappropriate Plugging of Tubes R9C60 & R10C60 in Salem Unit 2 Sg,Was Performed.Caused by Failure of Qualification,Verification & Validation Process. Tubes Reviewed to Verify No Others Inappropriately Plugged + (05:14:56, 6 January 2025)
- 05000311/LER-1998-003, Forwards LER 98-003-00 Re Inappropriate Plugging of Tubes R9C60 & R10C60 in Salem Unit 2,SG + (05:14:58, 6 January 2025)
- ML18106A689 + (05:14:59, 6 January 2025)
- ML18106A688 + (05:15:00, 6 January 2025)
- ML18106A687 + (05:15:01, 6 January 2025)
- LR-N980318, Forwards Listing of Licensing Actions W/Brief Description for Each,In Response to NRC Administrative Ltr 98-03, Operator Reactor Licensing Action Estimates + (05:15:02, 6 January 2025)
- LR-N980321, Informs That 980617 Submitttal of Charting Our Future, Contained Incorrect Statement on Page 10 Re re-accreditation of Operator Training Program.Revised Rept,Encl + (05:15:04, 6 January 2025)