Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000335/LER-2076-038, With Reactor Critical at 0.01 Percent Power, Power Supply to Digital Data Processor Was Momentarily Deenergized + (04:45:32, 6 January 2025)
- 05000335/LER-2076-039, With Reactor Critical at 0.01 Percent Power, Shield Building Access Door Was Found Open Which Is Contrary to Technical Specification 3.6.6.2 + (04:45:34, 6 January 2025)
- 05000335/LER-2076-040, During Reactor Shutdown and Cooldown, Pressurizer Level Would Drop Whenever Either Set of Shutdown Cooling System Suction Valves Was Opened + (04:45:36, 6 January 2025)
- 05000335/LER-2076-041, During Shutdown Cooling Pump Operation, Second Charging Pump Was Started to Increase Letdown Flow Rate and It Caused Reactor Coolant System Pressure to Increase + (04:45:38, 6 January 2025)
- 05000335/LER-2076-043, During Special Inspection of Steam Generators a and B to Accomplish Tack Welding of Stand Pipes for Feed Ring, 3 Stand Pipes Were Found Missing + (04:45:42, 6 January 2025)
- L-76-361, Forwards Reactor Vessel Overpressurization Issue Progress Report + (04:45:43, 6 January 2025)
- 05000335/LER-2076-042, With Reactor Shutdown for Fuel Inspection, Containment Purge Fan Was Started and Sufficient Vacuum Was Obtained to Cause Containment Vacuum Release Valve to Open + (04:45:44, 6 January 2025)
- 05000335/LER-2076-044, With 1B Diesel Generator Out of Service for Preventive Maintenance on Air Line Lubricators, 1A Diesel Generator Failed to Start During Surveillance Test + (04:45:46, 6 January 2025)
- PMNS20180515, Meeting Announcement - Category 1 Public Meeting + (04:45:50, 6 January 2025)
- 05000335/LER-2076-045, During Plant Heatup, Low Pressure Safety Injection Pumps Were Stopped When System Pressure Had Been Raised Above 250 Psia + (04:45:51, 6 January 2025)
- 05000335/LER-2076-047, Steam Driven Auxiliary Feedwater Pump Would Not Start Because Trip Solenoid Latch Failed to Engage + (04:45:55, 6 January 2025)
- 05000335/LER-2076-048, Due to Faulty Switch on Operators Console an Interrupt Signal Was Sent to Central Processing Unit Causing Digital Data Processor to Halt + (04:45:58, 6 January 2025)
- IR 05000269/2018411 + (04:45:59, 6 January 2025)
- ML18113A286 + (04:46:01, 6 January 2025)
- 05000335/LER-2077-001, During a Weekly Test of Turbine Control Valves, RCS Cold Temperature Exceeded 542 Degrees F Twice + (04:46:02, 6 January 2025)
- 05000335/LER-2077-003, During Surveillance Testing, 1A Diesel Generator Failed to Start + (04:46:05, 6 January 2025)
- 05000335/LER-2077-005, Two Main Feed Pump Discharge Valves Could Reopen After Closing on a Main Steam Isolation Signal + (04:46:07, 6 January 2025)
- ML18113A270 + (04:46:09, 6 January 2025)
- ML18113A268 + (04:46:10, 6 January 2025)
- ML18113A267 + (04:46:10, 6 January 2025)
- ML18113A259 + (04:46:15, 6 January 2025)
- 05000335/LER-2077-006, With the Plant Operating at Power, Control Element Assembly 60 Dropped, Initiating Turbine Run Back and Giving a Rod Bottomed Indication + (04:46:17, 6 January 2025)
- 05000335/LER-2077-007, During Routine Surveillance, CEA 7 Was Found to Be Inoperable. CEA 7 Is a Shutdown CEA + (04:46:19, 6 January 2025)
- NL-18-0550, Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations + (04:46:21, 6 January 2025)
- ML18113A254 + (04:46:21, 6 January 2025)
- 05000335/LER-2077-009, Digital Data Processing System Computer Went Off the Line Because of Memory Disk Content Error, Resulting in Loss of CEA Pulse Counting Position Indication + (04:46:23, 6 January 2025)
- PNP 2018-020, Offsite Dose Calculation Manual and Big Rock Point ISFSI - Attachment 2, 2017 Radioactive Effluent Release Report + (04:46:26, 6 January 2025)
- ML18113A247 + (04:46:28, 6 January 2025)
- ML18113A246 + (04:46:29, 6 January 2025)
- ML18113A245 + (04:46:30, 6 January 2025)
- ML18113A235 + (04:46:34, 6 January 2025)
- ML18113A234 + (04:46:37, 6 January 2025)
- 1CAN041806, Cycle 28 COLR, Revision 1 + (04:46:38, 6 January 2025)
- ML18113A227 + (04:46:39, 6 January 2025)
- ML18113A226 + (04:46:40, 6 January 2025)
- ML18113A225 + (04:46:40, 6 January 2025)
- ML18113A222 + (04:46:41, 6 January 2025)
- Press Release-II-18-018, NRC to Hold Meeting to Discuss Performance of Honeywell Metropolis Facility + (04:46:42, 6 January 2025)
- LG-18-057, Issuance of the Core Operating Limits Report (Cola) for Unit 1 Reload 17, Cycle 18 + (04:46:43, 6 January 2025)
- ML18113A186 + (04:46:45, 6 January 2025)
- ML18113A185 + (04:46:49, 6 January 2025)
- PMNS20180342, Interagency Collaborative for Environmental Modeling and Monitoring (Icemm) Annual Public Meeting + (04:46:50, 6 January 2025)
- ML18113A162 + (04:46:50, 6 January 2025)
- L-2018-082, Enclosure 4 to L-2018-082 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Documents (Public Version) + (04:46:51, 6 January 2025)
- BW180044, Core Operating Limits Report, Braidwood Unit 1 Cycle 21 + (04:46:52, 6 January 2025)
- ML18113A145 + (04:46:54, 6 January 2025)
- ML18113A141 + (04:46:57, 6 January 2025)
- ML18113A142 + (04:46:57, 6 January 2025)
- ML18113A136 + (04:46:59, 6 January 2025)
- ML18113A131 + (04:47:00, 6 January 2025)
- ML18113A134 + (04:47:00, 6 January 2025)