Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19199A300 + (06:13:07, 5 January 2025)
- ML19199A298 + (06:13:08, 5 January 2025)
- ML19199A296 + (06:13:10, 5 January 2025)
- ML19199A297 + (06:13:10, 5 January 2025)
- ML19199A295 + (06:13:11, 5 January 2025)
- ML19199A294 + (06:13:11, 5 January 2025)
- ML19199A292 + (06:13:13, 5 January 2025)
- ML19199A293 + (06:13:13, 5 January 2025)
- ML19199A291 + (06:13:14, 5 January 2025)
- ML19199A290 + (06:13:15, 5 January 2025)
- ML19199A289 + (06:13:16, 5 January 2025)
- ML19199A288 + (06:13:17, 5 January 2025)
- ML19199A287 + (06:13:19, 5 January 2025)
- ML19199A286 + (06:13:20, 5 January 2025)
- ML19199A285 + (06:13:21, 5 January 2025)
- ML19199A282 + (06:13:22, 5 January 2025)
- 05000320/LER-1978-028-03, /03L-0 on 780415:during Mode 3 Isolation & Cooling Sys Surveillance,Decay Heat Closed Cooling Sys Valve DC-V103 Failed to Close.Caused by Failed Motor on Operator.Motor Replaced & Valve Returned to Svc + (06:13:24, 5 January 2025)
- 05000320/LER-1978-042-03, /03L-0 on 780613:during Mode 6 Operation & Surveillance,Pressure in Accumulator for Damper 4092c Could Not Be Maint within 10 Psi of Initial Pressure.Caused by Improper Location of 3-way Valve for Damper + (06:13:26, 5 January 2025)
- 05000320/LER-1978-028, Forwards LER 78-028/03L-0 + (06:13:28, 5 January 2025)
- ML19199A275 + (06:13:30, 5 January 2025)
- 05000320/LER-1978-042, Forwards LER 78-042/03L-0 + (06:13:31, 5 January 2025)
- 05000320/LER-1978-045-01, /01T-0 on 780719:review of Tech Specs Revealed Errors in Modeling Rod Bow Penalty & Power Imbalance Curves. Caused by Use of Incorrect Model & Misapplication of Statistical Error Equation.Tech Spec Change Submitted + (06:13:34, 5 January 2025)
- 05000320/LER-1978-017-03, /03L-0 on 780324:during insp,half-inch Inlet Nipple Socket Weld Joint to DH-V121B Was Found Leaking. Caused by Damaged Weld Joint.Weld Repaired + (06:13:36, 5 January 2025)
- ML19199A269 + (06:13:38, 5 January 2025)
- 05000320/LER-1978-045, Forwards LER 78-045/01T-0 + (06:13:39, 5 January 2025)
- 05000320/LER-1978-017, Forwards LER 78-017/03L-0 + (06:13:42, 5 January 2025)
- 05000320/LER-1978-020-03, /03L-0 on 780329:during Monthly Surveillance Test, Containment Isolation Valve NM-V52 Was Found Inoperable.On 780401,valve NS-V81 Also Was Found Inoperable.Caused by Engaged Manual Handwheel Pins.Pins Disengaged + (06:13:44, 5 January 2025)
- 05000320/LER-1978-021-03, /03L-0 on 780329:during Mode 2 Operation,Vital Bus 2-1V de-energized,rendering Instrumentation Inoperable, Depressurizing RCS & Causing ECCS Injection.Caused by Fuse Blown on DC Input During Testing.Fuse Replaced + (06:13:48, 5 January 2025)
- 05000320/LER-1978-021, Forwards LER 78-021/03L-0 + (06:13:50, 5 January 2025)
- 05000320/LER-1978-020, Forwards LER 78-020/03L-0 + (06:13:52, 5 January 2025)
- ML19199A250 + (06:13:54, 5 January 2025)
- ML19199A249 + (06:13:55, 5 January 2025)
- ML19199A246 + (06:13:58, 5 January 2025)
- ML19199A244 + (06:14:00, 5 January 2025)
- ML19199A239 + (06:14:01, 5 January 2025)
- ML19199A238 + (06:14:05, 5 January 2025)
- ML19199A237 + (06:14:07, 5 January 2025)
- ML19199A236 + (06:14:08, 5 January 2025)
- ML19199A235 + (06:14:09, 5 January 2025)
- ML19199A234 + (06:14:10, 5 January 2025)
- ML19199A233 + (06:14:12, 5 January 2025)
- ML19199A232 + (06:14:13, 5 January 2025)
- ML19199A231 + (06:14:15, 5 January 2025)
- ML19199A230 + (06:14:17, 5 January 2025)
- ML19199A229 + (06:14:18, 5 January 2025)
- ML19199A228 + (06:14:20, 5 January 2025)
- ML19199A227 + (06:14:22, 5 January 2025)
- ML19199A226 + (06:14:23, 5 January 2025)
- ML19199A225 + (06:14:25, 5 January 2025)
- ML19199A224 + (06:14:26, 5 January 2025)
- ML19199A223 + (06:14:27, 5 January 2025)