ML19199A228

From kanterella
Jump to navigation Jump to search
Forwards 1978 Annual Rept Containing Tabulation of Personnel Exposure Data & Listing of Aircraft Movement at Harrisburg Intl Airport.Submittal Is One Month Late
ML19199A228
Person / Time
Site: Crane  
Issue date: 04/02/1979
From: Lawyer L
Metropolitan Edison Co
To: Grier B
NRC Office of Inspection & Enforcement (IE Region I)
References
GQL-0452, GQL-452, NUDOCS 7904050204
Download: ML19199A228 (5)


Text

.

p- )

4~

r, n;i.

s i11 i-a

'4 e

April 2, 1979 GQL 0452 Mr. 11. 11. Grier, Director Office of Inspection 6 Enforcement Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylv. inia 19406

Dear Sir:

Three Mile Island Nuclear Station, Units 1&2 Operating License Nos. DPR-50 & DPR-7 3 Docket Nos. 50-289 and 50-320 Per the telephone call between Mr..l.

F.

Ililbish of Metropolitan Edison Company and Mr. D. llaverkamp of your of fice, the 1978 Annual Report for Three Mile Island Nuclear Station, Units 1 and 2 is being submitted one month late.

This report is submitted per the requirements of Section 6.9.1.B of the TMI-1 Technical Specifications, and Sect ion 6.9.1.5 of the TMI-2 Technical Specifications.

This Annual Report contains a tabulation of the personnel exposure data and a listing of aircraf t movements at the liarr i sbu rg International Airport.

Sincerely, DRIGINAL' SIGNED BY L. L LAWYER L. L. Lawyer Manager-Generation Operations LLL:DGM:tas Enclosure cc:

Director, Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 (40 copies)

Director, Office of Management Info. 6 Program Control U.S. Nuclear Regulatory Commission Washington, D.C.

( 2 Copies) 7904 05 0 Jo //

S O

o 9p\\

11~ 214 u nemo smo coowo., m, m m.

.., m,

u..

..,,o 6

Pnce 1 of ?

Date-3/26/79 Report Period:

ITUMBER OF PERSOUrlEL AIID MAN REMS BY WORK AfiD JOB FU?!CTIGIl 1/1/78 - 12/31/78 TMI STATIOil STATIOTI PERSOilflEL UTILITY PERS0!!? LEI, C0!ITRACTOR PERPO!!UEL JOB CATEGORY--JOB FUflCTIOil ITUMBER REMS HUMBER REMS ITUMBER R EM.1 Reactor Oper. Fc Surveil.

Maintenance Personnel 78 1.11'l 12

.102 66

.869 operating Personnel 109 8.866 0

.000 0

.000 Health Physics Personnel 19 1.202 1

.030 11

.083 Supervisory Personnel 37 2.162 10 312 12

.2h2 Engineering Personnel 23

.276 26

.237 17

.365 Administrative Personnel i

.163 19

.128 2

.000 Routine Maintennnee Maintenance Personnel lh2 16.183 30

.692 235 31.016 Operating Personnel 90 1.818 0

.000 1

.160 Health Physics Personnel 25 980 1

.010 26 12.207 Supervisory Personnel h1 2.871 7

.13h 35 3.Sh5 Engineering Personnel 16

.211 22

.h83 33 1.680 Administrative Personnel 10

.h26 h

.0hD 2

.1h7 Inrervice Inspection laintenance Personnel 56

.603 lh

.302 h7 3.223 pp Operating Personnel 63 1.902 0

.000 0

.000 Health Physien Personnel 19 1.081 6

.855 2

.1 30 N

Supervisory Personnel 31 1.651 9

.281 19

.638 Engineering Personnel 10 765 h0

.385 15

.185 Cli Administrative Personnel 9

.0h7 33 522 8

1.723 Special Maintenance Maintenance Personnel 138 21.1h1 58 1.650 257 36.397 Operating Personnel 88 3.280 0

.000 1

.003 Health Physics Personnel 22 1.365 0

.000 11

.106 Supervisory Personnel hl 1.908 lh

.205 h5 h.601 Engineering Personnel 23 987 hh

.h95 53 2.971 Administrative Personnel b

.h10 7

.1 h 2 h

011

Page 2 of 2 STATICII PEH30!IllEL tiTILITY PERSOTITIEL CO!ITH M'TOH PERS0!!TIEL JOB CATEGORY-JOB FU?IOTICII NUl4BER REMS UUf!BER EEft3 flu'4BER HEf f'l Waste Processing Maintenance Personnel 51 21.616 5

.210 33

?.80h ope: ating Personnel 37 7.112 0

.000 0

.000 IIealth Physics Personnel 6

.056 3

.168 12

.089 Supervisory Personnel 13 2.728 8

.367 6

.176 Engineering Personnel 3

.03h 18

.60h 2

.011 Administrative Personnel 5

.159 7

.047 1

.1h9 Refueling Maintenance Personnel 98 1h.6ho 12 768 133 9.h33 Operating Personnel 93 4.313 0

.000 0

.000 llealth Physics Personnel 19

.233 1

.005 21 1.0h6 Superviso:y Personnel h0 3.703 h

.021 22 2.200 Engineering Personnel 21

.255 18

.899 3?

1.h3h Administrative Personnel 5

.013 9

.112 11 3.093

  • Total by Job Function
  • Maintenance Personnel 150 75.300 77 3.72h 315 83.Th2 Operating Personnel 128 27.291 0

.000 1

.163 IIealth Physics Personnel 27 h.917 8

1.068 27 13.661 Supervisory Personnel 63 15.023 33 1.320 Sb 11.402 Engineering Personnel 36 2.528 113 3.103 8h 6.6h6 Administrative Personnel 18 3.218 51 991 12 5.123

    • Grand Total **

h22 128,277 282 10.206 h93 120.737 s

I P

e

ESTDIATED AIRCRAFT MOVEMENTS AT THE HARRISFURG INTERNATIONAL AIRPORT JANUARY 1, 1978 TO DECEMBER 31, 1978 Total Number of Aircraft Movements (Takeoff's, Landings)

- 111,258 Total Number of Movements of Aircraf t Larger than 200,000 Pounds

- < 1,113 11~ 21T/

Page 1 of 2 Date:

3/26/79 Report Period:

NUMBER OF PERS0!UJEL ATID MA!I REM 3 BY WORK AfD JOB FUNCTION o,

y,gg _ y g j7g TMI STATION STATIOfi I ERSONNEL UTILITY PERPO!!NEL COIJTRACTOR PERGnNilEL JOB CATEGORY-JOB FUNCTIOIl NUMBER REM 3 ImMBER REfC ilUMBER REMS Reactor Oper. & Surveil.

Maintenance Personnel 78 1.117 12

.102 66

.869 operating Personnel 109 8.466 0

.000 0

.000 llealth Physics Personnel 19 1.202 1

.030 11

.083 Supervisory Personne1 37 P.162 10

. 31 ?

12

.2h2 Engineering Personnel 23

.276 26

.237 17

.365 Administrative Personnel 7

.163 19

.128 P

.000 Routine Maintenance Maintenance Personnel lh2 16.183 30

.692 P 35 31.016 operating Personnel 90 1.818 0

.000 1

.160 ifealth Physics Personnel 25 980 1

.010 26 12.207 Supervisory Personnel hl 2.871 T

.13h 35 3.Sh5 Engineering Personnel 16

.211

?2

.h83 33 1.680 Administrative Personnel 10

.h26 h

.0h0 2

.1h7 Inservice Inspection Maintennnee Personnel 56

.603 1h

.302 47 3.223 g

Operating Personnel 63 1 902 0

.000 0

.000 Health Physles Personnel 19 1.081 6

.855 2

.130 Supervisory Personnel 31 1.651 9

.281 19

.638 N

Engineering Personnel 10

.765 ho

.385 15

.185

', A Administrative Personnel 9

.0h7 33 522 8

1.723 Special Maintenance Maintenance Personnel 138 21.1h1 58 1.650 257 36.397 Operating PerJonnel 88 3.280 0

.000 1

.003 Health Physics Personnel 22 1.365 0

.000 11

.106 Supervisory Personnel h1 1 908 lh

.205 h5 h.601 Engineering Personnel 23 987 hh

.h95 53 2.971 Administrative Personnel h

.h10 7

.1h2 h

011

Page 2 of 2 STATIOil PERS0!INEI, UTILITY PEF:30N flET, POIITRACTOR PERS0!!flEI, JOB CATEGORY-JOR FU?iCTICII IRJMBER REM 3 IRIMBER REM 3 inI? tBER 11E'U Waste Processing Maintenance Personnel 51 21.616 5

.210 33 2.80h operating Personnel 37 7.112 0

.000 0

.000 Health Physics Personnel 6

.056 3

.168 12

.089 Supervisory Pernonnel 13 2.728 8

.367 6

.176 Engineering Personnel 3

.03b 18

.60h 2

.011 Administrative Personnel 5

2.159 7

.0h7 1

.1h9 Refueling Maintenance Personnel 98 1h.6ho 12 768 133 9.h33 Operating Personnel 93 h.313 0

.000 0

.000 Health Ihysics Personnel 19

.233 1

.005 21 1.0h6 Gupervisocy Personnel ho 3.703 h

.021 22 2.200 Engineering Personnel 21

.255 18

.899 32 1.h3h Arlministrative Personnel 5

.013 9

.112 11 3.093

  • Total by Job Function
  • Maintenance Personnel 150 75.300 77 3.72h 315 83.Th2 operating Personnel 128 27.291 0

.000 1

.163 Health Physics Personnel 27 h.917 8

1.068 27 13.661 Supervisory Personnel 63 15.023 33 1.320 Sh 11.h02 Engineering Personnel 36 2.528 11 3 3.103 8h 6.6h6 Administrative Personnel 18 3.21 3 51 991 12 5.123

    • Grand Total **

h22 128.277 282 10.206 h93 120.737 e

f

ESTIMATED AIFCRAFT MOVEMENTS AT THE HARRISBURG INTERNATIONAL AIRPORT JANUARY 1,1978 TO DECDfBER 31, 1978 Total Number of Aircraft Movements (Takeoff's, Landings)

- 111,258 Total Number of Movements of Aircraft Larger than 200,000 Pounds

- < 1,113 I

1r220