Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000366/LER-1979-075, Forwards LER 79-075/03L-0 + (18:14:12, 4 January 2025)
- 05000334/LER-1979-021-01, /01T on 790726:meggar Readings Indicated Degradation of Insulation Resistance During Testing of Emergency Bus GE Transformers.Cause Not Stated. Transformers Replaced W/Qualified Ite Transformers + (18:14:14, 4 January 2025)
- ML19242D355 + (18:14:15, 4 January 2025)
- 05000259/LER-1979-012-03, /03L-0 on 790710:w/unit in Normal Operation,Hpci Failed to Come to Rated Speed & Flow within Required Time Limit While SI 4.5.E.1.d & E Were Being Performed.Caused by Stop Valve FCV 73-18 Not Opening Fully Due to Loose Screw + (18:14:20, 4 January 2025)
- 05000295/LER-1979-052-03, /03L-0 on 790713:reactor Coolant Loop Flow Transmitter 1FT 44C Had Drifted High by 5.5%.Caused by Instrument Drift.Transmitter Readjusted to Zero & Mechanics Being Trained to Identify Drift Situation + (18:14:28, 4 January 2025)
- ML19242D342 + (18:14:30, 4 January 2025)
- 05000295/LER-1979-052, Forwards LER 79-052/03L-0 + (18:14:32, 4 January 2025)
- ML19242D339 + (18:14:33, 4 January 2025)
- ML19242D338 + (18:14:34, 4 January 2025)
- NUREG-1350 Volume 31, Information Digest 2019-2020, Chapter 7, Appendices + (18:14:35, 4 January 2025)
- 05000259/LER-1979-012, Forwards LER 79-012/03L-0 + (18:14:37, 4 January 2025)
- ML19242D319 + (18:14:40, 4 January 2025)
- 05000346/LER-1979-079-03, /03L-0 on 790712:while Repositioning Group 8, Absolute Position Indication for Rod 4 Shifted from 25% to 0% Position.Caused by Oxide Film Buildup on Reed Switch Contacts.Corrective Maint Performed + (18:14:44, 4 January 2025)
- 05000366/LER-1979-082-03, /03L-0 on 790725:switch in low-low Water Level Recirculation Pump Logic Inoperable.Caused by Trash on Switch Contacts.Contacts Cleaned & Tested.Maint Request Issued to Inspect & Clean Other Switches + (18:14:47, 4 January 2025)
- 05000344/LER-1979-010-03, /03L-0 on 790525:two Valves Found Leaking During Local Leak Rate Testing.Caused by Uneven Seating of Two Gate Valves Between Disc & Seat.Valves Repaired & Retested + (18:14:49, 4 January 2025)
- 05000346/LER-1979-079, Forwards LER 79-079/03L-0 + (18:14:51, 4 January 2025)
- 05000366/LER-1979-082, Forwards LER 79-082/03L-0 + (18:14:53, 4 January 2025)
- 05000344/LER-1979-010, Forwards LER 79-010/03L-0 + (18:14:55, 4 January 2025)
- ML19242D280 + (18:14:56, 4 January 2025)
- 05000295/LER-1979-044-99, /99x-0 on 790608:operators Manually Initiated Safety Injection After False Steam Pressure Differential Signals Caused Control Room Safety Injection Annunciation. Caused by Waterhammer Shock in Steam Generator Loop D + (18:14:58, 4 January 2025)
- ML19242D278 + (18:14:59, 4 January 2025)
- 05000295/LER-1979-044, Forwards LER 79-044/99X-0 + (18:15:00, 4 January 2025)
- ML19242D275 + (18:15:01, 4 January 2025)
- 05000304/LER-1979-040-03, /03L-0 on 790724:steam Generator Level 2L-538 Indicated 20% Higher than Other Channels for Steam Generator D.Caused by Faulty Power Supply,Model 4111085-001.Power Supply Replaced W/Calibr Spare + (18:15:03, 4 January 2025)
- ML19242D273 + (18:15:04, 4 January 2025)
- 05000263/LER-1979-015, Forwards LER 79-015/03L-0 + (18:15:09, 4 January 2025)
- ML19242D271 + (18:15:11, 4 January 2025)
- ML19242D270 + (18:15:13, 4 January 2025)
- 05000304/LER-1979-040, Forwards LER 79-040/03L-0 + (18:15:15, 4 January 2025)
- ML19242D266 + (18:15:17, 4 January 2025)
- 05000334/LER-1979-020-01, /01T-0 on 790724:during Insp,Inoperable Pipe Hanger Baseplate Observed.Caused by Improper Installation of Concrete Expansion Anchors in Baseplate Due to Lack of Formal Procedures During Initial Installation + (18:15:18, 4 January 2025)
- ML19242D264 + (18:15:19, 4 January 2025)
- ML19242D263 + (18:15:19, 4 January 2025)
- ML19242D262 + (18:15:20, 4 January 2025)
- ML19242D260 + (18:15:21, 4 January 2025)
- ML19242D259 + (18:15:22, 4 January 2025)
- ML19242D257 + (18:15:22, 4 January 2025)
- ML19242D256 + (18:15:23, 4 January 2025)
- ML19242D254 + (18:15:24, 4 January 2025)
- ML19242D252 + (18:15:24, 4 January 2025)
- 05000304/LER-1979-036-03, /03T-0 on 790703:while Boric Acid Tank Was Recirculating Unit 2 Boron Injection Tank,Boron Concentration Was Found to Be 11.2%,0.3% Above Tech Spec Max.Caused by Leakage from RCS + (18:15:26, 4 January 2025)
- 05000334/LER-1979-020, Forwards LER 79-020/01T-0 + (18:15:28, 4 January 2025)
- 05000304/LER-1979-036, Forwards LER 79-036/03T-0 + (18:15:30, 4 January 2025)
- 05000348/LER-1978-024-03, /03L-1 on 780408:while Changing Turbine Governor Valve Control,Load Rejection of Approx 170 MW Resulted in Momentary Temp Average Increase.Control Rods Automatically Initiated & Average Reduced + (18:15:31, 4 January 2025)
- ML19242D243 + (18:15:33, 4 January 2025)
- ML19242D239 + (18:15:34, 4 January 2025)
- 05000348/LER-1978-024, Forwards Updated LER 78-024/03L-1 + (18:15:35, 4 January 2025)
- L-79-173, Forwards Supplementary Response to IE Bulletin 79-06A Re Operating Procedures for Transients & Accidents + (18:15:36, 4 January 2025)
- ML19242D235 + (18:15:39, 4 January 2025)
- ML19242D232 + (18:15:40, 4 January 2025)
- ML19242D231 + (18:15:40, 4 January 2025)