Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19249B634 + (15:44:26, 4 January 2025)
- ML19249B633 + (15:44:27, 4 January 2025)
- ML19249B632 + (15:44:27, 4 January 2025)
- ML19249B631 + (15:44:29, 4 January 2025)
- ML19249B630 + (15:44:32, 4 January 2025)
- 05000302/LER-1979-072-01, /01T-0:on 790816,during Mode 1,plant Ascended Into Operational Mode.Caused by Personnel Error.Shift Turnover Checklist Developed + (15:44:33, 4 January 2025)
- 05000302/LER-1979-072, Forwards LER 79-072/01T-0 + (15:44:36, 4 January 2025)
- ML19249B623 + (15:44:37, 4 January 2025)
- ML19249B621 + (15:44:40, 4 January 2025)
- ML19249B620 + (15:44:42, 4 January 2025)
- ML19249B619 + (15:44:43, 4 January 2025)
- ML19249B618 + (15:44:44, 4 January 2025)
- ML19249B615 + (15:44:46, 4 January 2025)
- ML19249B612 + (15:44:47, 4 January 2025)
- ML19249B609 + (15:44:48, 4 January 2025)
- ML19249B595 + (15:44:50, 4 January 2025)
- ML19249B593 + (15:44:51, 4 January 2025)
- ML19249B591 + (15:44:53, 4 January 2025)
- ML19249B592 + (15:44:53, 4 January 2025)
- ML19249B589 + (15:44:54, 4 January 2025)
- ML19249B588 + (15:44:55, 4 January 2025)
- ML19249B587 + (15:44:58, 4 January 2025)
- ML19249B586 + (15:45:00, 4 January 2025)
- ML19249B584 + (15:45:01, 4 January 2025)
- ML19249B582 + (15:45:02, 4 January 2025)
- ML19249B580 + (15:45:03, 4 January 2025)
- ML19249B578 + (15:45:04, 4 January 2025)
- ML19249B579 + (15:45:04, 4 January 2025)
- ML19249B575 + (15:45:05, 4 January 2025)
- ML19249B573 + (15:45:06, 4 January 2025)
- ML19249B570 + (15:45:06, 4 January 2025)
- ML19249B569 + (15:45:07, 4 January 2025)
- 05000271/LER-1979-015-03, /03L-0:on 790802,during Investigation of Seismic Class 1 Hangers,Anchor Bolts of MS-H-A10 Found Dislodged from Wall.Cause Unknown at Present.Present Review of Seismic Class 1 Sys Will Identify Necessary Mods + (15:45:09, 4 January 2025)
- ML19249B566 + (15:45:10, 4 January 2025)
- ML19249B561 + (15:45:11, 4 January 2025)
- ML19249B560 + (15:45:12, 4 January 2025)
- 05000271/LER-1979-015, Forwards LER 79-015/03L-0 + (15:45:13, 4 January 2025)
- ML19249B557 + (15:45:15, 4 January 2025)
- 05000368/LER-1979-062-03, /03L-0:on 790804,failure of Full Length Control Element Assembly 39 to Move.Caused by Failed Control Element Assembly Enable Card.Card Replaced & Assembly Declared Operable within 1-h of Failure + (15:45:16, 4 January 2025)
- ML19249B553 + (15:45:17, 4 January 2025)
- LD-79-036, Forwards Info Requested by IE Bulletin 78-12,Atypical Weld Matl in Reactor Pressure Vessel Welds Which Addresses All Applicable Matls Used in Fabrication of Reactor Vessels. W/O Encl + (15:45:18, 4 January 2025)
- ML19249B547 + (15:45:20, 4 January 2025)
- ML19249B543 + (15:45:20, 4 January 2025)
- ML19249B537 + (15:45:26, 4 January 2025)
- 05000368/LER-1979-061-03, /03L-0:on 790804,failure of Low Pressure Nitrogen Supply in Reactor Bldg Penetration,Outside Isolation Valve, to Close on Control Signal.Caused by Limit Setpoint Drift. Limit Adjusted & Valve Returned to Svc + (15:45:28, 4 January 2025)
- 05000368/LER-1979-060-03, /03L-0:on 790802,failure of Reactor Drain Tank 2T68 Discharge Reactor Bldg Penetration to Close from Control Signal.Caused by Crystallization of Boron in Vent on Valve Operator Piston.Valve Cleaned & Returned to Svc + (15:45:29, 4 January 2025)
- 05000302/LER-1979-073-03, /03L-0:on 790801,during Mode 1 Operation,Absolute Rod Position Indication for Rod 4,Group 7 Fluctuated 3-40% Caused by Sticking Reed Switches.Absolute Position on Indicator Tube Replaced + (15:45:31, 4 January 2025)
- 05000302/LER-1979-073, Forwards LER 79-073/03L-0 + (15:45:36, 4 January 2025)
- ML19249B523 + (15:45:37, 4 January 2025)
- ML19249B521 + (15:45:38, 4 January 2025)
- ML19249B520 + (15:45:57, 4 January 2025)
- ML19249B519 + (15:45:58, 4 January 2025)