Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212J620 + (10:51:46, 4 December 2024)
- ML20212J619 + (10:51:47, 4 December 2024)
- ML20212J618 + (10:51:47, 4 December 2024)
- ML20212J615 + (10:51:48, 4 December 2024)
- ML20212J612 + (10:51:49, 4 December 2024)
- ML20212J613 + (10:51:49, 4 December 2024)
- ML20212J610 + (10:51:51, 4 December 2024)
- ML20212J606 + (10:51:52, 4 December 2024)
- TXX-6234, Interim Deficiency Rept CP-86-12 Re Attachments at or Near Design Gaps Between Secondary Walls & Adjacent Walls/Floors. Initially Reported on 860227.Evaluation Continuing.Next Rept Expected by 870327 + (10:51:53, 4 December 2024)
- ML20212J601 + (10:51:53, 4 December 2024)
- ML20212J599 + (10:51:54, 4 December 2024)
- ML20212J594 + (10:51:55, 4 December 2024)
- ML20212J598 + (10:51:55, 4 December 2024)
- 05000373/LER-1987-005-01, :on 870131,reactor Scram Occurred on Turbine Stop Valve Fast Closure Due to Loss of Alternator Exciter Field.Caused by Degradation of Collector Brushes Due to Insp Failure.Brushes Replaced.Insps Upgraded + (10:51:57, 4 December 2024)
- ML20212J590 + (10:51:58, 4 December 2024)
- ML20212J591 + (10:51:58, 4 December 2024)
- ML20212J587 + (10:51:59, 4 December 2024)
- ML20212J585 + (10:52:00, 4 December 2024)
- TXX-6208, Interim Deficiency Rept CP-86-65 Re Unconsolidated Concrete in Exterior Wall of Reactor Containment Bldg.Initially Reported on 860915.Review Continuing.Final Rept Expected by 870313 + (10:52:00, 4 December 2024)
- ML20212J583 + (10:52:01, 4 December 2024)
- ML20212J584 + (10:52:01, 4 December 2024)
- ML20212J579 + (10:52:03, 4 December 2024)
- ML20212J580 + (10:52:03, 4 December 2024)
- TXX-6225, Interim Deficiencu Rept CP-86-69 Re Failure to Incorporate Specific Restraining/Support Requirements Defined by IEEE Std 420-1973, Class IE Control Switchboards, Into Project Specs & Procedures.Next Rept Will Be Submitted by 870312 + (10:52:04, 4 December 2024)
- ML20212J578 + (10:52:04, 4 December 2024)
- ML20212J575 + (10:52:05, 4 December 2024)
- ML20212J573 + (10:52:06, 4 December 2024)
- ML20212J572 + (10:52:06, 4 December 2024)
- ML20212J571 + (10:52:07, 4 December 2024)
- ML20212J569 + (10:52:07, 4 December 2024)
- ML20212J566 + (10:52:08, 4 December 2024)
- ML20212J563 + (10:52:09, 4 December 2024)
- ML20212J564 + (10:52:09, 4 December 2024)
- ML20212J562 + (10:52:10, 4 December 2024)
- ML20212J561 + (10:52:11, 4 December 2024)
- TXX-6221, Interim Deficiency Rept CP-85-36 Re Installation of nonsafety-related Conduit on nonsafety-related Dead Weight Supports in Category 1 Areas.Initially Reported on 860906. Field Verification Continuing.Next Rept Expected by 870708 + (10:52:11, 4 December 2024)
- TXX-6230, Final Deficiency Rept CP-86-16 Re Detrimental Effects of Low Melting Point Metals on Stainless Steel Instrument Tubing During Fire.Initially Reported on 860321.Mods Will Be Implemented as Required + (10:52:12, 4 December 2024)
- ML20212J555 + (10:52:13, 4 December 2024)
- ML20212J556 + (10:52:13, 4 December 2024)
- ML20212J551 + (10:52:14, 4 December 2024)
- ML20212J552 + (10:52:14, 4 December 2024)
- ML20212J549 + (10:52:15, 4 December 2024)
- IR 05000416/1999014 + (10:52:17, 4 December 2024)
- ML20212J546 + (10:52:17, 4 December 2024)
- ML20212J543 + (10:52:18, 4 December 2024)
- ML20212J545 + (10:52:18, 4 December 2024)
- ML20212J542 + (10:52:19, 4 December 2024)
- TXX-6235, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321.Scope of Item Expanded to Include Corrective Actions for CP-86-77, CP-86-70 & CP-86-16.Next Rept Expected by 870320 + (10:52:20, 4 December 2024)
- ML20212J540 + (10:52:20, 4 December 2024)
- ML20212J535 + (10:52:21, 4 December 2024)
- ML20212J538 + (10:52:21, 4 December 2024)
- ML20212J533 + (10:52:22, 4 December 2024)