Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000321/LER-1980-051, Forwards LER 80-051/03L-0 + (23:37:26, 31 December 2024)
- AECM-80-128, Deficiency Rept (PRD-80/26) Re GE Type SB-12 Switches. Questions Rationale That Safety Function of Breaker Was to Trip on Signal from Reactor Protection sys.Re-evaluation Will Be Conducted & Final Rept Filed by 800710 + (23:37:27, 31 December 2024)
- 05000321/LER-1980-054-01, /01T-0:on 800529,while Repairing RHR Inboard Injection Valve,Engineering Staff Confirmed That Cable Separation Problem Existed Re Containment Atmospheric Control Sys.Caused by Design & Installation Error + (23:37:29, 31 December 2024)
- ML19323J245 + (23:37:31, 31 December 2024)
- ML19323J243 + (23:37:32, 31 December 2024)
- ML19323J244 + (23:37:32, 31 December 2024)
- 05000321/LER-1980-054, Forwards LER 80-054/01T-0 + (23:37:33, 31 December 2024)
- ML19323J240 + (23:37:35, 31 December 2024)
- ML19323J239 + (23:37:36, 31 December 2024)
- ML19323J237 + (23:37:39, 31 December 2024)
- ML19323J236 + (23:37:41, 31 December 2024)
- ML19323J235 + (23:37:42, 31 December 2024)
- ML19323J234 + (23:37:44, 31 December 2024)
- ML19323J233 + (23:37:44, 31 December 2024)
- ML19323J232 + (23:37:45, 31 December 2024)
- ML19323J231 + (23:37:45, 31 December 2024)
- 05000259/LER-1980-044-01, /01T-0:on 800602,while Reviewing Instrument Buses Per IE Bulletin 79-27,failure of 250 Volt Dc Battery Board Determined to Cause Feedwater Flow to Increase to Full Flow & Disable Feed Pump Trips.Caused by Power Nonseparation + (23:37:47, 31 December 2024)
- 05000259/LER-1980-044, Forwards LER 80-044/01T-0 + (23:37:48, 31 December 2024)
- ML19323J226 + (23:37:49, 31 December 2024)
- ML19323J225 + (23:37:50, 31 December 2024)
- A01024, Forwards Info Re Five Addl TMI-2 Related Requirements Applying to Operating Reactors Per 800507 Request.Integrated Assessment of Collective Impact of All Requirements Should Be Conducted + (23:37:57, 31 December 2024)
- ML19323J223 + (23:37:59, 31 December 2024)
- ML19323J222 + (23:37:59, 31 December 2024)
- ML19323J221 + (23:38:00, 31 December 2024)
- ML19323J220 + (23:38:01, 31 December 2024)
- ML19323J219 + (23:38:02, 31 December 2024)
- ML19323J218 + (23:38:07, 31 December 2024)
- ML19323J215 + (23:38:08, 31 December 2024)
- ML19323J216 + (23:38:08, 31 December 2024)
- ML19323J214 + (23:38:10, 31 December 2024)
- ML19323J213 + (23:38:11, 31 December 2024)
- ML19323J212 + (23:38:11, 31 December 2024)
- A01061, Forwards Info Re Design Basis Transient & Accident Conditions Providing Basis for Auxiliary Feedwater Sys Flow Requirements,In Response to NRC 791022 Request.Based on Analyses,Auxiliary Feedwater Sys Complies W/Section 1.4 + (23:38:12, 31 December 2024)
- ML19323J210 + (23:38:14, 31 December 2024)
- ML19323J209 + (23:38:16, 31 December 2024)
- ML19323J208 + (23:38:16, 31 December 2024)
- IR 05000116/1980001 + (23:38:18, 31 December 2024)
- ML19323J205 + (23:38:22, 31 December 2024)
- ML19323J204 + (23:38:23, 31 December 2024)
- IR 05000295/1980004 + (23:38:26, 31 December 2024)
- ML19323J201 + (23:38:30, 31 December 2024)
- ML19323J200 + (23:38:31, 31 December 2024)
- ML19323J198 + (23:38:33, 31 December 2024)
- ML19323J197 + (23:38:34, 31 December 2024)
- ML19323J196 + (23:38:34, 31 December 2024)
- IR 05000373/1980021 + (23:38:36, 31 December 2024)
- ML19323J191 + (23:38:37, 31 December 2024)
- ML19323J189 + (23:38:38, 31 December 2024)
- ML19323J188 + (23:38:39, 31 December 2024)
- ML19323J185 + (23:38:40, 31 December 2024)
- ML19323J186 + (23:38:40, 31 December 2024)