ML19323J210

From kanterella
Jump to navigation Jump to search
Comments on Environ Rept for Nuclear Fuel Fabrication Plant in Autauga County,Al.Environ Statement Should Identify Aquifier Tapped by Prattville Wells & Should Assess Impacts of Water Demand on Prattville Sys & on Aquifier
ML19323J210
Person / Time
Site: 07002909
Issue date: 04/14/1980
From: Menard H
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
To: Crow W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
16090, NUDOCS 8006190407
Download: ML19323J210 (1)


Text

\\.j.

POA-70

~tS"9

[

United States Department of the Interior GEOLOGICAL SURVEY RESTON VA. 22092 d

i?

j In Reply Refer To:

k[Q7fic,0 s,

EGS-ER-80/246

(:2

  • /~,,

W' ppg ' ' A ' 00 Mai1 Stop 760 APR22U8 u,,%':'jyr.,,0 s p\\*

W' /,?

?>

S*

c [f{c'12n k o

i SU %

3 us 91 i

C l ';; y 9 <,1pog a

Mr. W. T. Crow

g-t U.S. Nuclear Regulatory Commission E'

d At4g Division of Fuel Cycle and

% cr

/

f Material Safety, 396-SS g

Washington, D.C.

20555 N' '

j

Dear Mr. Crow:

We have reviewed the environmental report for the nuclear fuel fabrication plant in AutaugT County, Alabama.

The environmental statement should identify the aquifer (s) tapped by the Prattville wells (p. 2-18) and should assess the impacts of the plant's water demand on the Prattsville system and on the aquifer (s). The average municipal water demand for Prattville should be included. The description on page 2-18 should more clearly indicate the yield of t.he individual wells and capacity of the entire system. The general direction of the water-table gradient should be given; the locations of the drainage features of figure 2-7 (p. 2-34) would suggest that some of the monitoring wells for the shallow aquifer might be upgradient from the plant.

Thank you for the opportunity to comment.

Sincerely yours, fH.WilliamMenard Director l

,2 glyc 16030 8 0:0 e 1 g.0 967 c

.