Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19330B664 + (10:05:08, 31 December 2024)
- ML19330B663 + (10:05:09, 31 December 2024)
- ML19330B659 + (10:05:12, 31 December 2024)
- ML19330B658 + (10:05:13, 31 December 2024)
- 05000295/LER-1980-034-01, /01T-0:on 800710,possibility Discovered of Insufficient Indication of Boron Dilution While on RHR with Shutdown Margin Below 5%.FSAR Did Not Use Flow/Mixing Model for Analysis.Potential Damage Assessment in Progress + (10:05:14, 31 December 2024)
- A01137, Responds to IE Bulletin 80-17,Suppl 2, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. Mod Expending Three man-days Performed 800722 on North Side Scram Discharge Vol Vent + (10:05:16, 31 December 2024)
- 05000295/LER-1980-034, Forwards LER 80-034/01T-0 + (10:05:18, 31 December 2024)
- ML19330B652 + (10:05:19, 31 December 2024)
- 05000295/LER-1980-035-01, /01T-0:on 800720,wastewater Treatment Facility Effluent Ph Was Below Tech Spec Limit.Caused by Incorrect Setting on Aluminum Sulfate Chemical Feed Sys.Potentiometer Controlling Feed Rate Reset + (10:05:21, 31 December 2024)
- AECM-80-169, Interim Deficiency Rept 2 Re Rodent Damage to Cable Insulation Involved W/Rhr Sys.Investigation Incomplete.Final Rept to Be Submitted by 801016 + (10:05:22, 31 December 2024)
- ML19330B649 + (10:05:24, 31 December 2024)
- 05000295/LER-1980-035, Forwards LER 80-035/01T-0 + (10:05:26, 31 December 2024)
- ML19330B646 + (10:05:27, 31 December 2024)
- ML19330B644 + (10:05:28, 31 December 2024)
- ML19330B643 + (10:05:29, 31 December 2024)
- ML19330B642 + (10:05:30, 31 December 2024)
- ML19330B640 + (10:05:31, 31 December 2024)
- 05000293/LER-1980-031-04, /04T-0:on 800721,mussel Sample Concentration of Co-60 Exceeded 10 Times Lower Limit of Detection.Caused by Pilgrim Station Operation.Annual Dose to Humans Is Not Significant Per Reg Guide 1.109 + (10:05:36, 31 December 2024)
- PNO-I-80-108, on 800723,painter Was Working W/Solvent Inside Downcomer & Solvent Detonated.Painter Was Taken to Hosp W/Burns on 25% of Body + (10:05:39, 31 December 2024)
- 05000312/LER-1980-032-03, /03L-0:on 800712,during Routine Surveillance Test on Auxiliary Feedwater pump,P-318,pump Failed to Start from Control Room.Cause Undetermined.After Successfully Starting for Five Days,Pump Returned to Svc + (10:05:40, 31 December 2024)
- 05000293/LER-1980-031, Forwards LER 80-031/04T-0 + (10:05:42, 31 December 2024)
- 05000312/LER-1980-032, Forwards LER 80-032/03L-0 + (10:05:44, 31 December 2024)
- 05000293/LER-1980-033-03, /03L-0:on 800701,during Test,Nitrogen Purge Valve Did Not Close within Prescribed 10-s Limit.Cause Not Stated. Stroke Length Reduced,Valve Tested Satisfactorily & Returned to Svc + (10:05:46, 31 December 2024)
- ML19330B630 + (10:05:49, 31 December 2024)
- PNO-I-80-105, on 800722,one-man Picket Was Set at Main Entrance to Protest Use of Nonunion Contractor.All Union Employees Expected to Honor Picket Line.Licensee Plans Operators Shift Schedule of 18 Supervisory Personnel + (10:05:49, 31 December 2024)
- ML19330B629 + (10:05:50, 31 December 2024)
- 05000293/LER-1980-033, Forwards LER 80-033/03L-0 + (10:05:51, 31 December 2024)
- ML19330B624 + (10:05:55, 31 December 2024)
- ML19330B623 + (10:05:56, 31 December 2024)
- ML19330B618 + (10:06:04, 31 December 2024)
- ML19330B616 + (10:06:08, 31 December 2024)
- ML19330B612 + (10:06:09, 31 December 2024)
- 05000368/LER-1980-045, Forwards LER 80-045/04L-0 + (10:06:13, 31 December 2024)
- ML19330B608 + (10:06:15, 31 December 2024)
- ML19330B607 + (10:06:16, 31 December 2024)
- ML19330B603 + (10:06:17, 31 December 2024)
- ML19330B605 + (10:06:17, 31 December 2024)
- ML19330B602 + (10:06:18, 31 December 2024)
- ML19330B600 + (10:06:19, 31 December 2024)
- ML19330B599 + (10:06:20, 31 December 2024)
- ML19330B597 + (10:06:21, 31 December 2024)
- ML19330B596 + (10:06:22, 31 December 2024)
- ML19330B595 + (10:06:23, 31 December 2024)
- ML19330B593 + (10:06:24, 31 December 2024)
- ML19330B591 + (10:06:25, 31 December 2024)
- ML19330B592 + (10:06:25, 31 December 2024)
- ML19330B590 + (10:06:27, 31 December 2024)
- ML19330B588 + (10:06:28, 31 December 2024)
- ML19330B586 + (10:06:28, 31 December 2024)
- 05000219/LER-1980-027-01, /01T-0:on 800716,during Tour by Plant Mgt & NRC Personnel,Reactor Bldg to Suppression Chamber Vacuum Breaker Inlet Pipe Found Covered W/Plastic.Caused by Personnel Error.Plastic Removed from Vacuum Breaker Inlet Opening + (10:06:30, 31 December 2024)
- 05000219/LER-1980-027, Forwards LER 80-027/01T-0 + (10:06:32, 31 December 2024)