Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19331D665 + (08:41:44, 31 December 2024)
- ML19331D663 + (08:41:45, 31 December 2024)
- ML19331D661 + (08:41:50, 31 December 2024)
- ML19331D660 + (08:41:51, 31 December 2024)
- ML19331D659 + (08:41:51, 31 December 2024)
- ML19331D658 + (08:41:52, 31 December 2024)
- 05000348/LER-1980-045-03, /03L-0:on 800727,vacuum Pump Tripped on Low Flow Causing Containment Atmosphere Radioactivity Monitoring Sys R11 & R12 to Be Declared Inoperable.Caused by Fouled Filter Paper in Vacuum Pump.Paper Replaced + (08:41:54, 31 December 2024)
- ML19331D656 + (08:41:55, 31 December 2024)
- 05000348/LER-1980-045, Forwards LER 80-045/03L-0 + (08:41:56, 31 December 2024)
- ML19331D652 + (08:41:57, 31 December 2024)
- 05000333/LER-1980-066-03, /03L-0:on 800805,during Normal Shutdown,Conducting Surveillance Procedure F-ISP-8,core Spray Sys Pipe Break Detection Switches 14-DPIS-43A & 43B Found Set Greater than Limit.Caused by Instrument Drift.Instruments Recalibr + (08:42:00, 31 December 2024)
- ML19331D647 + (08:42:05, 31 December 2024)
- ML19331D646 + (08:42:06, 31 December 2024)
- 05000333/LER-1980-066, Forwards LER 80-066/03L-0 + (08:42:07, 31 December 2024)
- 05000368/LER-1980-050, Updated LER 80-050/03X-1:on 800804 During Mode 1 Operation, While Testing Emergency Feedwater Pump (2P7A),overspeed Trip Occurred Rendering 2P7A Inoperable.Cause Not Specified, But Hydraulic Control Oil Sys Is Suspected.Vendor + (08:42:10, 31 December 2024)
- PM-80-887, Forwards Semiannual Radioactive Effluent Release Rept, Jan-June 1980 + (08:42:12, 31 December 2024)
- 05000333/LER-1980-065-03, /03T-0:on 800814,during Normal Operations,While Inerting Primary Containment,Standby Gas Treatment Sys A&B Found Inoperable.Caused by Blocked Drain Line Allowing Water to Accumulate in Line Until Fans Could Not Discharge + (08:42:14, 31 December 2024)
- ML19331D639 + (08:42:16, 31 December 2024)
- ML19331D635 + (08:42:17, 31 December 2024)
- 05000333/LER-1980-065, Forwards LER 80-065/03T-0 + (08:42:18, 31 December 2024)
- ML19331D632 + (08:42:19, 31 December 2024)
- ML19331D631 + (08:42:21, 31 December 2024)
- ML19331D629 + (08:42:28, 31 December 2024)
- ML19331D625 + (08:42:29, 31 December 2024)
- ML19331D627 + (08:42:29, 31 December 2024)
- ML19331D623 + (08:42:30, 31 December 2024)
- ML19331D622 + (08:42:32, 31 December 2024)
- ML19331D621 + (08:42:32, 31 December 2024)
- ML19331D620 + (08:42:33, 31 December 2024)
- ML19331D617 + (08:42:34, 31 December 2024)
- ML19331D615 + (08:42:35, 31 December 2024)
- ML19331D614 + (08:42:35, 31 December 2024)
- 05000320/LER-1980-034-03, /03L-0:on 800725,during Recovery Mode,Use of Hot Water Hydrolasing Set Off Fire Alarm in Fuel Handling Bldg. Ventilation Automatically Shut Down & Was Not Returned to Svc for 5-h.Caused by Operator Response to Fire Alarm + (08:42:37, 31 December 2024)
- ML19331D611 + (08:42:38, 31 December 2024)
- ML19331D610 + (08:42:39, 31 December 2024)
- ML19331D607 + (08:42:39, 31 December 2024)
- 05000320/LER-1980-034, Forwards LER 80-034/03L-0 + (08:42:41, 31 December 2024)
- ML19331D604 + (08:42:42, 31 December 2024)
- ML19331D603 + (08:42:44, 31 December 2024)
- ML19331D602 + (08:42:44, 31 December 2024)
- ML19331D600 + (08:42:46, 31 December 2024)
- ML19331D599 + (08:42:47, 31 December 2024)
- ML19331D598 + (08:42:48, 31 December 2024)
- ML19331D597 + (08:42:49, 31 December 2024)
- ML19331D596 + (08:42:50, 31 December 2024)
- ML19331D595 + (08:42:51, 31 December 2024)
- ML19331D594 + (08:42:53, 31 December 2024)
- ML19331D593 + (08:42:54, 31 December 2024)
- ML19331D591 + (08:42:55, 31 December 2024)
- ML19331D590 + (08:42:56, 31 December 2024)
- ML19331D589 + (08:42:57, 31 December 2024)
- ML19331D588 + (08:42:58, 31 December 2024)