Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19270H703 + (10:42:51, 3 January 2025)
- ML19270H702 + (10:42:52, 3 January 2025)
- ML19270H700 + (10:42:53, 3 January 2025)
- ML19270H699 + (10:42:54, 3 January 2025)
- ML19270H698 + (10:42:58, 3 January 2025)
- ML19270H697 + (10:42:59, 3 January 2025)
- 05000312/LER-1979-006-04, /04T-0:on 791214,plant Effluent Sample Indicated 0.6 mg/1 of Chlorine & Followup Sample at Site Boundary Indicated 0.5 mg/1.Caused by Inadequate Dilution When Sewage Sys Discharged to Effluent.Normal Dilution Instituted + (10:43:01, 3 January 2025)
- ML19270H695 + (10:43:02, 3 January 2025)
- ML19270H694 + (10:43:03, 3 January 2025)
- ML19270H692 + (10:43:04, 3 January 2025)
- 05000312/LER-1979-006, Forwards LER 79-006/04T-0 + (10:43:05, 3 January 2025)
- ML19270H689 + (10:43:06, 3 January 2025)
- ML19270H687 + (10:43:07, 3 January 2025)
- ML19270H685 + (10:43:08, 3 January 2025)
- ML19270H682 + (10:43:09, 3 January 2025)
- ML19270H681 + (10:43:10, 3 January 2025)
- ML19270H680 + (10:43:12, 3 January 2025)
- ML19270H679 + (10:43:12, 3 January 2025)
- ML19270H678 + (10:43:13, 3 January 2025)
- ML19270H677 + (10:43:14, 3 January 2025)
- ML19270H675 + (10:43:16, 3 January 2025)
- ML19270H674 + (10:43:16, 3 January 2025)
- 05000029/LER-1979-031-03, /03L-0:on 791130,during Normal Mode 1 Operation, Steam Generator 3 Blowdown Monitor Isolated to Repair Leaking Valve.Caused by Leaking Monitor Isolation Valve. Monitor Replaced + (10:43:18, 3 January 2025)
- ML19270H672 + (10:43:19, 3 January 2025)
- ML19270H670 + (10:43:21, 3 January 2025)
- ML19270H669 + (10:43:22, 3 January 2025)
- 05000029/LER-1979-031, Forwards LER 79-031/03L-0 + (10:43:24, 3 January 2025)
- ML19270H666 + (10:43:25, 3 January 2025)
- ML19270H665 + (10:43:26, 3 January 2025)
- ML19270H664 + (10:43:27, 3 January 2025)
- ML19270H663 + (10:43:28, 3 January 2025)
- ML19270H661 + (10:43:35, 3 January 2025)
- ML19270H659 + (10:43:36, 3 January 2025)
- ML19270H656 + (10:43:40, 3 January 2025)
- ML19270H654 + (10:43:41, 3 January 2025)
- ML19270H653 + (10:43:42, 3 January 2025)
- ML19270H650 + (10:43:43, 3 January 2025)
- PNO-III-79-021, on 791025,reactor Scram Occured.Reactor Coolant Pump 2-2 Tripped During Switching of 480-volt Electrical Bus Sys Mod.Unknown Switching & Tripping Are Coincidental + (10:43:44, 3 January 2025)
- PNO-IV-79-017, on 791204,State of Ne Will Conduct Emergency Response Exercise Based on Incident at Cooper Nuclear Power Station Involving Simulated Offsite Releases + (10:43:46, 3 January 2025)
- ML19270H642 + (10:43:47, 3 January 2025)
- PNO-III-79-018B, on 791023,licensee Determined Linear Indications in Feedwater Nozzle Pipe Welds to Be Cracks. Cracking Estimated Depth Less than 0.170 Inch.Meeting Scheduled 791025 to Review Matter + (10:43:49, 3 January 2025)
- PNO-III-79-019, on 791023,reduced Power in Preparation of Tripping Reactor Coolant Pump 1-1.Apparently Caused by Failure of Two of Three Shaft Seals + (10:43:51, 3 January 2025)
- PNO-IV-79-011, on 791018,during Surveillance Testing,Major Bearing Damage Encountered in Emergency Diesel Generator 2. Reactor Shut Down for Examination of Core Internals. Repairs Will Extend Outage for Undetermined Period + (10:43:53, 3 January 2025)
- ML19270H633 + (10:43:54, 3 January 2025)
- PNO-V-79-006, on 791019,facility Notified NRC of Tritium Found in Samples from Onsite Recreation Lake.Caused by Leaking Steam Generator Tubes + (10:43:55, 3 January 2025)
- PNO-III-79-046, on 791127,State of Nv Dept of Public Health Is Holding Public Hearing in Carson City to Determine Whether Facility License Should Be Suspended,Revoked or Modified + (10:43:57, 3 January 2025)
- PNO-IV-79-007, on 791015,one Individual Performing Well Logging Received High TLD Reading of 64 Rem.Other Workers Performing Similar Duties Received Typical Readings.No Unusual Events or Activities Indicated + (10:43:59, 3 January 2025)
- PNO-III-79-018A, on 791017,insp & Evaluation Ongoing of Linear Indications in Feedwater Nozzle to Pipe Welds.Welds on Each of Four Steam Generators Have Been Radiographed. Linear Indications Exist in Feedwater Nozzle + (10:44:01, 3 January 2025)
- ML19270H627 + (10:44:02, 3 January 2025)
- ML19270H623 + (10:44:03, 3 January 2025)
- ML19270H614 + (10:44:05, 3 January 2025)