[ Y A D;' l
/(
. gtagRtop
+j
jo
UNITED STATES
g
E fh
g
NUCLEAR REGULATORY COMMISSION
r,, g,.,
c;
REGION IV
6 'fe
&
611 RYAN PLAZA DRIVE, SUITE 1000
%
N#
U
o
ARLINGTON, TEX AS 76012
9 +...+
November 9, 1979
In Reply Refer To:
RIV
Docket No.
50-445/Rpt. 79-18
50-446/Rpt. 79-18
Texas Utilities Generating Company
ATTN:
Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas 75201
Gentlemen:
This refers to the inspection activities performed by our Resident Inspector,
Mr. R. G. Taylor, for the periods of August and September 1979, of activities
authorized by NRC Construction Permits No. CPPR-126 and 127 for the Comanche
Peak facility, Units No. I and 2, and to the discussion of our findings with
Mr. R. G. Tolson and other members of your staff during the inspection period.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with Appendix B to 10 CFR 50 of the NP.C Regula-
tions, " Quality Assurance Criteria for Nuclear Power Plants."
The Notice of Violation for the items of noncompliance reported in the enclosed
inspection report were forwarded to you by our letter dated September 24, 1979;
therefore, this letter does not require further response regarding this matter.
We have also examined actions you have taken with regard to previously identified
inspec' tion findings. The status of these items is identified in paragraph 2 of
the enclosed report.
1679
184
8001020
.
.
Texas Utilities Generating
Company
2
November 9, 1979
One new unresolved item is identified in paragraph 8 of the enclosed
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure.
The application must include a full statement of the rea-
sons why it is claimed that the information is proprietary. The application
must include a full statement of the reasons why it is claimed that the infor-
mation identified is contained in an enclosure to the application, since the
application without the enclosure will also be placed in the Public Document
Room.
If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sin:crely,
W. C. Seidle,jChief
Reactor Consttuction and
Engineering Support Branch
Enclosure:
IE Inspection Report No. 50-445/79-18
50-446/79-18
cc: w/ enclosure
Texas Utilities Generating Company
ATTN:
Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas 75201
1679
I85
.