Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000368/LER-1988-018, :on 880922,breached Penetration Identified in Tech Specs Fire Barrier Wall FB-2081-02.In Dec 1983,breach Found Acceptable Due to Penetration Sealed on Opposite Side of Adjacent Wall.Caused by Personnel Error + (09:02:13, 3 December 2024)
- ML20235U624 + (09:02:13, 3 December 2024)
- ML20235U621 + (09:02:14, 3 December 2024)
- ML20235U620 + (09:02:15, 3 December 2024)
- ML20235U618 + (09:02:15, 3 December 2024)
- ML20235U617 + (09:02:16, 3 December 2024)
- ML20235U615 + (09:02:17, 3 December 2024)
- ML20235U612 + (09:02:19, 3 December 2024)
- 1CAN028914, Forwards Response to 890216 Request for Addl Info on High Pressure Interface (HPI) Backflow Event.New Design Using Redundant Check Valves as Supplemented by Testing & Maint Considered Adequate to Preclude Any Future HPI Conditions + (09:02:20, 3 December 2024)
- ML20235U610 + (09:02:20, 3 December 2024)
- ML20235U608 + (09:02:21, 3 December 2024)
- 05000260/LER-1987-009-02, :on 870911,while Pressure Switch in RWCU Being Recalibr,Lead from Test Equipment Slipped Out of Connection & Created Short Circuit Which Blew Fuse.Blown Fuse Replaced + (09:02:23, 3 December 2024)
- ML20235U605 + (09:02:23, 3 December 2024)
- ML20235U604 + (09:02:24, 3 December 2024)
- ML20235U602 + (09:02:25, 3 December 2024)
- IR 05000254/1989005 + (09:02:28, 3 December 2024)
- W3P87-1746, Emergency Preparedness Exercise + (09:02:29, 3 December 2024)
- ML20235U595 + (09:02:30, 3 December 2024)
- ML20235U596 + (09:02:30, 3 December 2024)
- ML20235U594 + (09:02:31, 3 December 2024)
- ML20235U588 + (09:02:32, 3 December 2024)
- ML20235U591 + (09:02:32, 3 December 2024)
- IR 05000321/1987012 + (09:02:35, 3 December 2024)
- ML20235U586 + (09:02:35, 3 December 2024)
- ML20235U583 + (09:02:36, 3 December 2024)
- ML20235U581 + (09:02:37, 3 December 2024)
- ML20235U575 + (09:02:38, 3 December 2024)
- ML20235U577 + (09:02:38, 3 December 2024)
- ML20235U574 + (09:02:39, 3 December 2024)
- BECO-89-025, Responds to NRC Bulletin 88-007,Suppl 1, Power Oscillations in Bwrs. Initial & Requalification License Training Programs Will Be Modified to Reflect Revised Procedures + (09:02:40, 3 December 2024)
- A06779, Informs That Util Will Provide Response to NRC 870824,0903 & 04 Requests for Addl Info Re Generic Ltr 83-28,Item 4.2 or Schedule for Addressing Requests by 871215,once Scope of Work Properly Defined + (09:02:42, 3 December 2024)
- ML20235U570 + (09:02:42, 3 December 2024)
- ML20235U568 + (09:02:43, 3 December 2024)
- ML20235U567 + (09:02:44, 3 December 2024)
- 05000245/LER-1987-037, :on 870908,while Operating at 100% Power, Surveillance Sp 609.1 Not Performed within Required Frequency,Per Tech Specs.Caused by Operator Error.Shift Surveillance Log Revised + (09:02:45, 3 December 2024)
- ML20235U563 + (09:02:46, 3 December 2024)
- ML20235U565 + (09:02:46, 3 December 2024)
- NRC-87-0160, Ro:On 870905,start Failure of Emergency Diesel Generator 13 Occurred During Invalid Test.Caused by Emergency Diesel Generator Tripping on Low Fuel Oil Pressure During Monthly Surveillance Slow Start & Load Test.Personnel Counseled + (09:02:47, 3 December 2024)
- ML20235U558 + (09:02:48, 3 December 2024)
- ML20235U560 + (09:02:48, 3 December 2024)
- 0CAN098707, Forwards follow-up of Regulatory Effectiveness Review Rept of 860609.Encl Withheld (Ref 10CFR73.21 & 10CFR2.790) + (09:02:49, 3 December 2024)
- ML20235U556 + (09:02:49, 3 December 2024)
- 05000277/LER-1987-020-01, :on 870904,HPCI Sys Determined Inoperable Due to Opening of Resistor in Voltage Dropping Assembly.Exact Cause for Opening of Resistor Unknown.Resistor Replaced on 870914 + (09:02:51, 3 December 2024)
- IR 05000382/1987012 + (09:02:52, 3 December 2024)
- ML20235U548 + (09:02:53, 3 December 2024)
- ML20235U541 + (09:02:54, 3 December 2024)
- ML20235U547 + (09:02:54, 3 December 2024)
- RBG-30186, Provides Supplementary Info on Roofing Program,As Committed in Util .Purpose of Built Up Roofing Is to Provide Drainage,Watertightness,Installation & Protection of Access Openings + (09:02:55, 3 December 2024)
- ML20235U535 + (09:02:56, 3 December 2024)
- ML20235U530 + (09:02:57, 3 December 2024)
- ML20235U532 + (09:02:57, 3 December 2024)