Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:MF1209 + (16:58:46, 27 July 2018)
- TAC:ME9156 + (19:00:30, 27 July 2018)
- TAC:ME8300 + (19:08:19, 27 July 2018)
- TAC:ME9429 + (19:11:21, 27 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 5.0 - Reactor Coolant System and Connected Systems + (19:17:09, 27 July 2018)
- RS-12-221, Braidwood, Units 1 and 2 and Byron, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Appendix C - Turbine Missile Study + (19:18:09, 27 July 2018)
- RS-12-221, Braidwood, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 2.0 - Site Characteristics, Table of Contents Through Table 2.5.53 + (19:18:59, 27 July 2018)
- BVY 12-080, Engineering Report VY-RPT-12-00019, Vermont Yankee Seismic Walkdown Submitted Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page 205 of 505 Through Page 464 of 505 + (20:13:51, 27 July 2018)
- TAC:ME8492 + (22:23:27, 27 July 2018)
- TAC:ME9582 + (02:14:30, 28 July 2018)
- TAC:ME9219 + (02:27:05, 28 July 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 34 to ULNRC-05893 - Callaway NPDES MO-0098001 + (04:15:49, 28 July 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 39 to ULNRC-05893 - Burns & Mcdonnell (Burns and Mcdonnell Engineering Company) 2008. Phase Ii Hydrogeologic Investigation Report Collector Well Siting Study, Callaway Unit 2. June (Part 2 of 3) + (04:19:25, 28 July 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 29 to ULNRC-05893 - 2011 Facility Summary Reports + (04:19:45, 28 July 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 4 to ULNRC-05893, Figure 1, Callaway NPDES Flow Diagram. + (04:20:41, 28 July 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 13 to ULNRC-0589 - Drawing 8600-X-88133, Building Fill & Backfill Cross Sections, Power Block + (04:22:23, 28 July 2018)
- ML12191A398 + (07:21:53, 28 July 2018)
- ML12191A397 + (07:21:58, 28 July 2018)
- TAC:ME7126 + (11:07:35, 28 July 2018)
- TAC:ME7802 + (11:10:59, 28 July 2018)
- DCL-12-050, Diablo Canyon, Units 1 and 2, Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar. + (14:14:16, 28 July 2018)
- DCL-12-050, Diablo Canyon, Units 1 and 2, Attachment 4 to DCL-12-050, Scm 36-01, Rev. 0, Process Protection System (PPS) Replacement Software Configuration Management Plan (SCMP) Nuclear Safety Related. + (14:14:33, 28 July 2018)
- TAC:ME7583 + (14:59:22, 28 July 2018)
- TAC:ME7124 + (14:59:27, 28 July 2018)
- TAC:ME7123 + (15:08:21, 28 July 2018)
- TAC:ME8308 + (18:25:23, 28 July 2018)
- TAC:ME4969 + (18:59:11, 28 July 2018)
- TAC:ME7703 + (19:30:25, 28 July 2018)
- TAC:ME6974 + (20:23:40, 28 July 2018)
- TAC:MR6538 + (22:09:25, 28 July 2018)
- LR-N12-0124, Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 + (01:20:46, 29 July 2018)
- DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 + (02:24:13, 29 July 2018)
- DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 3 of 5 + (02:26:54, 29 July 2018)
- DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 2 of 5 + (02:27:52, 29 July 2018)
- DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 5 of 5 + (02:28:37, 29 July 2018)
- TAC:ME7193 + (03:27:23, 29 July 2018)
- LR-N12-0121, Salem and Hope Creek - Radiological Environmental Monitoring Program, 2011 Annual Radiological Environmental Operating Report, January 1 to December 31, 2011 + (03:48:23, 29 July 2018)
- TAC:ME7303 + (04:21:36, 29 July 2018)
- TAC:ME5875 + (07:36:44, 29 July 2018)
- NL-12-032, NRC Pre-Filed Hearing Exhibit NRC000021 - Correction to Previous Response Regarding Unit 1 Buried Piping Indian Point Nuclear Generating Unit Nos. 1, 2 & 3 + (13:57:12, 29 July 2018)
- TAC:ME0004 + (02:41:48, 30 July 2018)
- TAC:ME7257 + (02:45:39, 30 July 2018)
- RS-12-023, WCAP-17330-NP, Rev. 1, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5). + (04:07:23, 30 July 2018)
- L-2012-072, ANP-3067, Rev. 1, St. Lucie, Unit 1 EPU - Information to Support NRC Review of RCS Depressurization with Pressurizer Overfill + (09:23:43, 30 July 2018)
- ENS 53528 + (11:30:15, 30 July 2018)
- ENS 53529 + (11:30:18, 30 July 2018)
- ML12054A196 + (13:36:32, 30 July 2018)
- ML120540078 + (14:00:18, 30 July 2018)
- TAC:ME7236 + (14:22:55, 30 July 2018)
- TAC:ME5900 + (14:37:23, 30 July 2018)
- ML120480282 + (15:18:34, 30 July 2018)