- GO2-83-106, Final Deficiency Rept,Condition 286 Re Linear Indication on Containment Weld Pads.Initially Reported on 831014.Potential for Beam Seat Separation Under Worst Case Loads Nonexistent. Item Not Reportable Per 10CFR50.55(e) + (09:26:03, 26 May 2025)
- GO2-83-109, Final Deficiency Rept,Condition 274 Re Excessive Gapping Between Pipe Support baseplates.Fifty-nine of 2,299 Baseplates Require Rework to Correct Deficient Baseplate Gap + (09:26:30, 26 May 2025)
- ML20082L884 + (09:26:58, 26 May 2025)
- 05000333/LER-1995-001, :on 950106,test Results for Five of Six Valves Exceeded 1% Tolerance Allowed by TS for Valve Actuation. Caused by Initial Lift Setpoint Drift Set High for All Pilot Mechanisms.Replaced SRV Pilot Assemblies + (09:27:07, 26 May 2025)
- ML20082L356 + (09:27:51, 26 May 2025)
- 05000311/LER-1982-017, Supplemental LER 82-017/03X-1:on 820228,svc Water Flow Indicated Zero Upon Starting Containment Fan Coil Unit 22 (Cfcu).On 820301,svc Water Flow to Cfcu 23 Less than Required 2,500 Gpm.Caused by Stuck Valve + (09:28:09, 26 May 2025)
- ML20082L197 + (09:28:13, 26 May 2025)
- 05000272/LER-1982-024, Svc Water Flow to Containment Fan Coil Unit 12 Discovered Less Required than 700 Gpm.Caused by Closed Flow Control Valve 125w223.Valve opened.W/831117 + (09:28:32, 26 May 2025)
- 05000311/LER-1982-001, Supplemental LER 82-001/03X-1:on 820110,steam Generator 24 Pressure Channel 4 Failed High.Caused by Ventilation Damper Stuck Open,Freezing Pressure Sensing Line.Damper Freed, Exercised & Closed + (09:29:01, 26 May 2025)
- 05000293/LER-1993-003, :on 930301,found Settings of RWCU High Switches Out of Tolerance During Surveillance.Caused Setpoint Drift. Re-calbr DPIS-1243 & DPIS-1244 in Accordance W/Procedure 8.M2-12.1 W/Satisfactory Results 930301 + (09:29:40, 26 May 2025)
- 05000254/LER-1983-024-03, While Performing QOS-1600-1,Div 1 Position Indication Lights for Vacuum Breaker 1-601-33F Indicated Valve Not Closed.Caused by Binding in Switch Due to Corrosion + (09:30:33, 26 May 2025)
- ML20082J662 + (09:30:39, 26 May 2025)
- ML20082J656 + (09:30:42, 26 May 2025)
- 05000293/LER-1991-005, :on 910325,loss of AC Power to B Train of Safety Sys Occurred.Caused by Failure of Automatic Voltage Regulator.Calibr Frequency to Be Established & Calibr Procedures to Be Developed + (09:33:38, 26 May 2025)
- ML20082H148 + (09:33:52, 26 May 2025)
- ML20082H143 + (09:33:55, 26 May 2025)
- ML20082H132 + (09:33:57, 26 May 2025)
- ML20082G996 + (09:34:12, 26 May 2025)
- TAC:M88316 + (09:34:31, 26 May 2025)
- SNRC-1782, Provides Clarification of 910115 Request for Limited Scope Exemption from Seismic Qualification Requirements of Criterion 2,App A,10CFR50 Re Facility 125 Volt Dc Batteries + (09:34:37, 26 May 2025)
- 05000482/LER-1995-001, :on 950308,reactor Tripped Resulting in Loss of Two CW Sys Pumps,Condenser Vacuum & Two Rcps.Caused by Failure of RT Manual Actuation Switch Contacts to Maintain Continuity.Surveillance Procedures Revised + (09:36:17, 26 May 2025)
- TAC:52405 + (09:36:20, 26 May 2025)
- 05000250/LER-1981-016-03, 125-volt Dc Battery 3A Failed to Hold Charge.Root Cause Not Identified.Battery Replaced,Tested & Returned to Svc.Recommendations Received from Manufacturer + (09:36:37, 26 May 2025)
- B10951, Forwards Amend 5 to FSAR & Responses to Selected Requests for Info,Including Revised Responses to 830131,0503 & 31 Requests & Responses to Series 640 Questions Submitted in .Amend Incorporates Revs/Responses + (09:38:00, 26 May 2025)
- GO2-83-104, Provides 120-day Response to IE Bulletin 83-06 Re Nonconforming Matls Supplied by Tube-Line Corp.Investigation Revealed No Usage of Tube-Line Supplied Matls in Const of Project + (09:38:06, 26 May 2025)
- ELV-02368, Discusses 10CFR50.46 ECCS Evaluation Model Significant Errors/Changes Rept & Provides Info Re Current Analysis Peak Cladding Temp Results & Provides Plant Safety Evaluations + (09:38:43, 26 May 2025)
- TAC:51626 + (09:38:49, 26 May 2025)
- A830002, Responds to NRC Re Violations Noted in IE Insp Rept 50-298/83-18.Corrective Actions:Fire Barrier Conduit Capped by Licensee Immediately After Being Notified by Senior Resident Inspector + (09:39:21, 26 May 2025)
- 05000346/LER-1981-037-03, RCS Saturation Margin Meters & Auxiliary Feedwater Flow Indication 1 Lost.Makeup Pump 1-1 Tripped.Caused by Mechanical Shock to Ith Relay + (09:39:48, 26 May 2025)
- GO2-83-105, Responds to IE Bulletin 80-06, ESF Reset Controls. Preoperational Loss of Power Testing Identified Addl balance-of-plant Valves Not in Compliance W/Bulletin,Per .Reset Control Logic Will Be Modified + (09:40:03, 26 May 2025)
- GO2-83-101, Final Deficiency Rept,Condition 216 Re RHR Relief Valve Vents.Initially Reported on 821022.Relief Valves Removed, Eliminating Containment Leakage Path.Const in Progress on Physical Changes & Will Be Complete Prior to Fuel Load + (09:40:13, 26 May 2025)
- 05000302/LER-1991-003, :on 910420,water Intrusion Into Pump Motor Lead to Loss of Circulating Water Pump,Emergency Feedwater Actuation & Manual Reactor Trip.Will Provide Addl Rain Protection for Circulating Water Pump + (09:40:18, 26 May 2025)
- ML20082D169 + (09:40:38, 26 May 2025)
- 05000259/LER-1983-028-03, Stack Gas Radiation Monitors RM 90-147 & RM 90-148 Inoperable Due to Failure of Sample Pumps a & B.Caused by Broken Glass Oil Filter Bowl on Pump a & Buildup of Dirt & Grit in Pump B + (09:40:56, 26 May 2025)
- ML20082C688 + (09:41:26, 26 May 2025)
- ML20082C114 + (09:42:31, 26 May 2025)
- 05000325/LER-1983-035-03, During Performance of High Steam Line Radiation Channel Functional Test,Main Steam Line Radiation Monitor Actuated Above Limits.Caused by Monitor Instrument Drawer Problems + (09:42:55, 26 May 2025)
- ML20082B921 + (09:43:17, 26 May 2025)
- TXX-9123, Forwards Endorsement 42 to Neila Policy NF-274 & Endorsements 17,14 & 8 to Maelu Policies MF-131,MW-190 & MW-90,respectively + (09:44:06, 26 May 2025)
- LIC-95-0076, V 1 + (09:44:30, 26 May 2025)
- ML20082B202 + (09:45:10, 26 May 2025)
- ML20082B142 + (09:45:20, 26 May 2025)
- ML20082B121 + (09:45:25, 26 May 2025)
- ML20082A971 + (09:45:38, 26 May 2025)
- ML20082A970 + (09:45:40, 26 May 2025)
- 05000317/LER-1981-022-03, ESF Actuation Sys Degraded Voltage Relay 127/B-11-H Found Inoperable.Caused by Relay Output Contact Binding.Relay Repaired + (09:46:09, 26 May 2025)
- 05000498/LER-1995-003, :on 950227,MSSV & Pressurizer Safety Valve Setpoint Found Outside Required Tolerances.Caused by Setpoint Drift.Adjusted Lift Settings of Seven MSSV to Be within Required Allowable Tolerances + (09:46:12, 26 May 2025)
- 05000443/LER-1990-004, Forwards Util Commitment to Perform Visual Insp of Four Feedwater Sys Check Valves Dash Plate Capscrews During First Refueling Outage,Per LER 90-004-00 + (09:46:37, 26 May 2025)
- 05000369/LER-1983-101-01, /01T-0:on 831024,Westinghouse Notified Util of Potentially Defective Relays SA1.Relay Used in Class IE Switchgear for Diesel Generator Protection & May Cause False Trip Output to Diesel Generator.Caused by Mfg Deficiency + (09:47:43, 26 May 2025)
- 05000416/LER-1983-154-03, /03L-0:on 831002,containment Spray Loop a Declared Inoperable When Breaker for Standby Svc Water HX Bypass Valve Would Not Close on Valve Close Signal.Caused by Contact Sticking Due to Tight Screw + (09:47:45, 26 May 2025)
- TXX-9119, Suppl to Significant Deficiency Rept CP-87-61 Re Snug Tight Torquing of Structural Bolts.Initially Reported on 870821.FSAR Revised to Allow for Engineering Analysis in Lieu of Meeting Pretensioning for Bolted Connections + (09:47:56, 26 May 2025)