Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138F244 + (04:08:51, 25 May 2025)
- IR 05000528/1985001 + (04:09:11, 25 May 2025)
- TAC:M93372 + (04:09:47, 25 May 2025)
- IR 05000254/1985024 + (04:10:27, 25 May 2025)
- TAC:M94246 + (04:10:30, 25 May 2025)
- TAC:M88319 + (04:10:48, 25 May 2025)
- TAC:M92465 + (04:10:56, 25 May 2025)
- TAC:55762 + (04:12:48, 25 May 2025)
- IR 05000335/1994009 + (04:13:50, 25 May 2025)
- TAC:59523 + (04:14:43, 25 May 2025)
- 05000333/LER-1996-010, :on 960916,plant Was Shut Down Re Inadvertent Connection of Two Terminals While Calibrating Protective Relay Due to Human Error.Personnel Responsible for Initiating Event Have Been Counseled + (04:16:07, 25 May 2025)
- ML20138D788 + (04:16:10, 25 May 2025)
- L-93-004, Discusses Encl Proposed Amend to Windsor Fundamental Nuclear Matl Control Plan.W/O Encl + (04:17:01, 25 May 2025)
- TXX-9308, Forwards fitness-for-duty Program Performance Data for Jul-Dec 1992 + (04:18:18, 25 May 2025)
- L-93-005, Informs That Windsor Decommissioning Plan Will Be Submitted to NRC by 930331 + (04:18:34, 25 May 2025)
- ML20138D156 + (04:18:38, 25 May 2025)
- 05000315/LER-1997-006, :on 970327,interim LER Equipment in Containment Rendered Inoperable Due to Cracked Floodup Tubes.Damaged Unit 1 EQ Futs,Replaced + (04:20:46, 25 May 2025)
- 05000316/LER-1982-003-01, /01X-1:on 820119,leak Discovered in Attachment Weld on Upstream Side of Suction Strainer for West Containment Spray Pump.Caused by Residual & High Cycle Alternating Stress.Design Change Initiated + (04:20:59, 25 May 2025)
- ML20138C702 + (04:21:10, 25 May 2025)
- ML20138C587 + (04:21:37, 25 May 2025)
- ML20138C417 + (04:23:47, 25 May 2025)
- ML20138C304 + (04:24:23, 25 May 2025)
- ML20138C265 + (04:24:33, 25 May 2025)
- ML20138C212 + (04:24:43, 25 May 2025)
- ML20138C198 + (04:24:47, 25 May 2025)
- NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 + (04:24:56, 25 May 2025)
- ML20138C132 + (04:25:07, 25 May 2025)
- ML20138B996 + (04:25:40, 25 May 2025)
- TAC:56794 + (04:25:45, 25 May 2025)
- 05000458/LER-1985-006, :on 850916,reactor Protection Sys Actuated While in Noncoincident Trip Mode When Malfunction in Undervoltage Printed Circuit Board on Alternate Supply Breaker Tripped Electrical Protection Assembly + (04:25:56, 25 May 2025)
- ML20138B701 + (04:27:15, 25 May 2025)
- 05000423/LER-1996-036-01, Forwards LER 96-036-01,documenting Condition at Facility on 960926.Commitments Listed + (04:28:39, 25 May 2025)
- ML20138B373 + (04:28:41, 25 May 2025)
- ML20138B345 + (04:28:48, 25 May 2025)
- ML20138B266 + (04:29:06, 25 May 2025)
- NPL-97-0182, Forwards Copy of Annual Monitoring Rept for Pbnp for 960101- 1231 & Vendor Analytical Results for Radiological Environ Monitoring Program (REMP) as Well as Vendor Qa/Qc Results + (04:30:11, 25 May 2025)
- TAC:61274 + (04:30:13, 25 May 2025)
- 05000341/LER-1997-007, :on 970325,condition Prohibited by TS Due to Failure of Reactor Building Hvac.East RBHVAC Exhaust & Supply Fans Were Started in Order to Reestablish Secondary Containment Integrity & Failed Solenoid Valve Replaced + (04:30:25, 25 May 2025)
- ML20138A954 + (04:31:01, 25 May 2025)
- ML20138A771 + (04:31:46, 25 May 2025)
- ML20138A535 + (04:32:38, 25 May 2025)
- ML20138A429 + (04:33:05, 25 May 2025)
- ML20138A401 + (04:33:10, 25 May 2025)
- ML20138A360 + (04:33:21, 25 May 2025)
- 05000341/LER-1996-017-01, Forwards LER 96-017-01,re Failure of Multiple SRVs to Open within Required TS Allowable Tolerance.Listed Commitments Included + (04:34:07, 25 May 2025)
- 05000295/LER-1997-008, :on 970321,air Filters Containing Al Were Inadvertently Installed in Containment Due to Faulty Parts Selection Process.Hepa Filters Containing Al Will Be Removed or Replaced w/non-Al Containing Filters + (04:34:23, 25 May 2025)
- ML20138A129 + (04:34:29, 25 May 2025)
- ML20138A030 + (04:34:58, 25 May 2025)
- 05000029/LER-1983-013, :on 830413,due to Shifts in App G Curve, Determined That Events as Postulated in Original Design Basis Could Potentially Exceed Pressure Restrictions of Revised Curve.Caused by Personnel Error + (04:36:43, 25 May 2025)
- IR 05000397/1986001 + (04:38:31, 25 May 2025)
- 05000387/LER-1985-032, :on 851011 & 13,RWCU Sys Spilled Process Water & Resin Resulting in Isolation.Caused by Erosion of Valve Seat FV-14566A & Inadequate Single Valve Isolation.Valve Seat Replaced.Valve Control Circuitry Modified + (04:38:44, 25 May 2025)