Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-2006-118, 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. + (22:37:41, 23 November 2019)
- RNP-RA/06-0040, Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. + (22:38:08, 23 November 2019)
- LR-N06-0253, Updated Response to Generic Letter 2004-02 and Request for Extension for Insulation Replacement + (22:38:11, 23 November 2019)
- NOC-AE-06002018, Control Room Inleakage Testing + (22:39:56, 23 November 2019)
- W3F1-2006-0028, Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations + (22:41:23, 23 November 2019)
- L-HU-06-025, Response to Generic Letter 2006-03: Potentially Nonconforming Hemyc and MT Fire Barrier Configurations + (22:41:26, 23 November 2019)
- RC-06-0106, Day Response to NRC Generic Letter 2006-03: Potentially Nonconforming Hemyc and Mt Fire Barrier Configurations + (22:44:15, 23 November 2019)
- NOC-AE-06002011, Request for Use of Delta Protection Mururoa Blu Single-Use Suits + (22:44:56, 23 November 2019)
- WO 06-0028, Operating Corporation Update Response to Requested Information Part 2 of Generic Letter 2004-02; Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (22:46:11, 23 November 2019)
- RBG-46570, Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. + (22:47:38, 23 November 2019)
- ULNRC-05294, Day Response to NRC Generic Letter 2006-03, Potentially Nonconformance Hemyc and MT Fire Barrier Configurations. + (22:47:43, 23 November 2019)
- ULNRC-05295, Response Update to Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (22:48:44, 23 November 2019)
- GNRO-2006/00032, Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations + (22:48:54, 23 November 2019)
- ML061560079 + (22:51:22, 23 November 2019)
- ML061560073 + (22:51:25, 23 November 2019)
- LIC-06-0061, Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations + (22:51:37, 23 November 2019)
- NLS2006047, Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations, Dated April 10, 2006 + (22:53:03, 23 November 2019)
- RS-06-081, Supplement to Exelon Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (22:57:07, 23 November 2019)
- NOC-AE-06002022, 60-Day Response to NRC Generic Letter 2006-03: Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. + (22:59:13, 23 November 2019)
- NOC-AE-06002017, Transmittal of South Texas, Units 1 & 2 - Radioactive Effluent Release Report for 2005 + (23:52:05, 23 November 2019)
- ML18282A223 + (23:57:46, 23 November 2019)
- M060502, M060502-Briefing on Status of Emergency Planning Activities (Slides) + (00:14:58, 24 November 2019)
- TAC:D91824 + (00:16:30, 24 November 2019)
- ML061170329 + (00:24:12, 24 November 2019)
- ML061160189 + (00:27:58, 24 November 2019)
- NOC-AE-06002008, Changes and Additions to NRC Distribution Lists + (00:34:39, 24 November 2019)
- NOC-AE-06002003, Supplemental Information Regarding Indirect Transfer of Control to Nrg Energy, Inc + (00:42:27, 24 November 2019)
- ML061070166 + (00:48:40, 24 November 2019)
- HNP-06-032, Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. + (00:57:20, 24 November 2019)
- NOC-AE-06001997, License Amendment Request - Proposed Licensee Name Change + (00:58:23, 24 November 2019)
- ULNRC-05270, 60-Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and Operability of Offsite Power. + (00:59:44, 24 November 2019)
- NOC-AE-06001979, 60-Day Response to NRC Generic Letter 2006-02: Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. + (01:15:15, 24 November 2019)
- PLA-6031, Response to NRC Generic Letter 2006-02 Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power PLA-6031 + (01:20:47, 24 November 2019)
- RNP-RA/06-0014, Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power + (01:21:17, 24 November 2019)
- NLS2006008, Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power, Dated February 1, 2006 + (01:26:56, 24 November 2019)
- ML060940307 + (01:27:55, 24 November 2019)
- ML060940180 + (01:29:22, 24 November 2019)
- ML060940176 + (01:29:27, 24 November 2019)
- ML060940170 + (01:29:30, 24 November 2019)
- ML060940166 + (01:29:32, 24 November 2019)
- ML060940135 + (01:29:41, 24 November 2019)
- NOC-AE-06001985, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-44) + (01:34:35, 24 November 2019)
- NOC-AE-06001995, Organization Changes as Described in the Operation Quality Assurance Plan + (01:35:50, 24 November 2019)
- ML060870178 + (01:43:05, 24 November 2019)
- ML060870144 + (01:43:17, 24 November 2019)
- SBK-L-06044, Notification of Deviation from MRP-139 Inspection Requirement + (02:04:31, 24 November 2019)
- NRC 2006-0023, Supplement to 60-Day Response to Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. + (02:04:52, 24 November 2019)
- ML060680434 + (02:16:49, 24 November 2019)
- ML060680387 + (02:17:08, 24 November 2019)
- NOC-AE-06001982, Response to Request for Additional Information Regarding the IRE12 Refueling Outage Inservice Inspection Results for Steam Generator Tubing + (02:27:08, 24 November 2019)
- ML060650461 + (02:29:26, 24 November 2019)