Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000346/2006010 + (17:49:36, 23 November 2019)
- NL-06-2378, Regulatory Commitment to the Response to Generic Letter 2003-01 - Control Room Habitability + (17:52:41, 23 November 2019)
- RC-06-0182, Response to NRC Generic Letter 96-06: Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions - Change to Commitment Implementation Schedule + (18:11:59, 23 November 2019)
- NRC-2006-0077, Supplemental Response to Generic Letter 2004 - 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors + (18:15:34, 23 November 2019)
- NOC-AE-06002068, Response to Request for Additional Information: Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43) + (18:15:50, 23 November 2019)
- ML062840430 + (18:17:30, 23 November 2019)
- L-06-020, Revised Commitment Dates Relevant to Firstenergy Nuclear Operating Company Correspondence to the NRC, L-06-020, Dated April 3, 2006 + (18:23:42, 23 November 2019)
- NOC-AE-06002060, Revision to Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. + (18:24:06, 23 November 2019)
- U-603782, Correction Letter to Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions Response + (18:40:25, 23 November 2019)
- NOC-AE-06002066, Commitment in Support of Proposed Alternative to ASME Section XI Requirements for Application of a Weld Overlay (RR-ENG-2-43) + (18:46:33, 23 November 2019)
- L-2006-216, Clarification for St. Lucie Response to Generic Letter 2006-03 + (18:50:59, 23 November 2019)
- NOC-AE-06002063, Operator Licensing National Examination Schedule. + (19:01:47, 23 November 2019)
- ML062570374 + (19:07:05, 23 November 2019)
- W3F1-2006-0043, Additional Information in Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in Pressurizer Penetrations and Steam Space Piping Connections + (19:34:27, 23 November 2019)
- NOC-AE-06002055, Response to NRC Request for Additional Information on Proposed Alternative to ASME Section XI Requirements for Application of Weld Overlay (RR-ENG-2-43) + (19:39:06, 23 November 2019)
- NOC-AE-06002049, Commitment Change Summary Report + (19:43:33, 23 November 2019)
- ML062360119 + (19:48:14, 23 November 2019)
- ML062330237 + (19:53:13, 23 November 2019)
- NOC-AE-06002047, Groundwater Protection - Data Collection Questionnaire + (19:58:03, 23 November 2019)
- ML062270064 + (20:01:48, 23 November 2019)
- NOC-AE-06002050, Submittal of Operations Quality Assurance Plan Change QA-061 + (20:02:04, 23 November 2019)
- NOC-AE-06002053, Semiannual Fitness for Duty Program Performance Report for the First Half of 2006 + (20:02:09, 23 November 2019)
- NOC-AE-06002023, Completion of Nrg Entergy, Inc. Corporate Restructuring Affecting Nrg South Texas LP and Effectiveness of Support Agreement + (20:02:26, 23 November 2019)
- ML062220484 + (20:09:09, 23 November 2019)
- WM 06-0027, Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. + (20:34:20, 23 November 2019)
- NOC-AE-06002040, Technical Specifications, Bases Control Program + (20:50:48, 23 November 2019)
- ML062090066 + (20:50:59, 23 November 2019)
- ULNRC-05310, Supplemental Information for the 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. + (21:00:18, 23 November 2019)
- L-2006-182, Response to NRC Bulletin 2004-01 Update Pressurizer Replacement + (21:11:42, 23 November 2019)
- RNP-RA/06-0067, Supplemental Response to NRC GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (21:18:20, 23 November 2019)
- ML061950377 + (21:24:33, 23 November 2019)
- ML061840086 + (21:46:52, 23 November 2019)
- LIC-06-0070, Supplement to Revised Request for an Extension to the Completion Date for Corrective Actions Taken in Response to Generic Letter 2004-02 + (21:54:31, 23 November 2019)
- NOC-AE-06002030, Submittal of Operation Quality Assurance Plan Change QA-060 + (22:16:25, 23 November 2019)
- NOC-AE-06002031, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for Use of Penetrameters in Radiographic Examinations + (22:16:56, 23 November 2019)
- NL-06-060, Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations + (22:19:15, 23 November 2019)
- ULNRC-05298, Amended Response to Generic Letter 2003-01, Control Room Habitability. + (22:19:19, 23 November 2019)
- GO2-06-086, Response to Generic Letter 2006-003, Potentially Nonconforming Heymc and MT Fire Barrier Configurations. + (22:21:56, 23 November 2019)
- HNP-06-082, Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations + (22:27:51, 23 November 2019)
- RBG-46577, Clarification of Response to Generic Letter 2006-03 + (22:31:01, 23 November 2019)
- NRC-06-0042, Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations + (22:33:47, 23 November 2019)
- JAFP-06-0089, Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations + (22:36:31, 23 November 2019)
- RS-06-083, 60-Day Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. + (22:36:56, 23 November 2019)
- L-2006-118, 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. + (22:37:41, 23 November 2019)
- RNP-RA/06-0040, Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations. + (22:38:08, 23 November 2019)
- LR-N06-0253, Updated Response to Generic Letter 2004-02 and Request for Extension for Insulation Replacement + (22:38:11, 23 November 2019)
- NOC-AE-06002018, Control Room Inleakage Testing + (22:39:56, 23 November 2019)
- W3F1-2006-0028, Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations + (22:41:23, 23 November 2019)
- L-HU-06-025, Response to Generic Letter 2006-03: Potentially Nonconforming Hemyc and MT Fire Barrier Configurations + (22:41:26, 23 November 2019)
- RC-06-0106, Day Response to NRC Generic Letter 2006-03: Potentially Nonconforming Hemyc and Mt Fire Barrier Configurations + (22:44:15, 23 November 2019)
- NOC-AE-06002011, Request for Use of Delta Protection Mururoa Blu Single-Use Suits + (22:44:56, 23 November 2019)