L-2006-182, Response to NRC Bulletin 2004-01 Update Pressurizer Replacement
| ML062010138 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/14/2006 |
| From: | Johnston G Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| BL-04-001, L-2006-182 | |
| Download: ML062010138 (1) | |
Text
0 Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 July 14, 2006 iPL L-2006-182 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 J
Re: St. Lucie Unit 1 Docket No. 50-335 NRC Bulletin 2004-01 Update Pressurizer Replacement In the responses to NRC Bulletin 2004-01 via letters L-2004-160 and L-2005-011 dated July 27, 2004 and January 18, 2005, respectively, FPL stated that the St. Lucie Unit 1 pressurizer was scheduled for replacement during the SL1-20 refueling outage. FPL completed the pressurizer replacement during the SL1-20 refueling outage via Plant Change Modification (PCM) 04149.
The NRC docketed its inspection of the pressurizer replacement and associated activities in the NRC Integrated Inspection Report 05000335/2005005 and 05000389/2005005.
Please contact Ken Frehafer at (772) 467-7748 if there are any questions on this matter.
Very truly yours, GLJ/KWF 41/0 an FPL Group company
Text
0 Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 July 14, 2006 iPL L-2006-182 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 J
Re: St. Lucie Unit 1 Docket No. 50-335 NRC Bulletin 2004-01 Update Pressurizer Replacement In the responses to NRC Bulletin 2004-01 via letters L-2004-160 and L-2005-011 dated July 27, 2004 and January 18, 2005, respectively, FPL stated that the St. Lucie Unit 1 pressurizer was scheduled for replacement during the SL1-20 refueling outage. FPL completed the pressurizer replacement during the SL1-20 refueling outage via Plant Change Modification (PCM) 04149.
The NRC docketed its inspection of the pressurizer replacement and associated activities in the NRC Integrated Inspection Report 05000335/2005005 and 05000389/2005005.
Please contact Ken Frehafer at (772) 467-7748 if there are any questions on this matter.
Very truly yours, GLJ/KWF 41/0 an FPL Group company