Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000324/1997012 + (08:33:43, 23 May 2025)
- ML20217P719 + (08:33:48, 23 May 2025)
- IR 05000219/1996009 + (08:33:56, 23 May 2025)
- IR 05000334/1997009 + (08:34:08, 23 May 2025)
- L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station + (08:34:31, 23 May 2025)
- ML20217P491 + (08:34:42, 23 May 2025)
- ML20217P482 + (08:34:46, 23 May 2025)
- 05000424/LER-1997-002-02, Forwards LER 97-002-02,per 10CFR50.73.Encl Is Second Rev to LER Originally Submitted on 970220 & First Revised on 970730.Revs Are Marked W/Rev Bars in Left Hand Border + (08:35:09, 23 May 2025)
- ML20217P386 + (08:35:15, 23 May 2025)
- ML20217P367 + (08:35:20, 23 May 2025)
- ML20217P348 + (08:35:26, 23 May 2025)
- TXX-9805, Requests Relief to Unit 2 ISI Program IAW Requirements of 10CFR50.55a(g)(5)(iii).Relief Requests B-4,B-5,B-6,C-2 & C-3 Encl for Approval + (08:35:29, 23 May 2025)
- NSD-NRC-98-5640, Transmits Rev 4 of Section 3.0, Non-Sys Based Design Descriptions & ITAAC & Section 5.0, Site Parameters of AP600 Certified Design Matl.Changes Made as Result of W Responses to NRC Questions & FSER Open Items Since 970516 + (08:35:35, 23 May 2025)
- ML20217P319 + (08:35:37, 23 May 2025)
- ML20217P308 + (08:35:39, 23 May 2025)
- 05000461/LER-1998-005-01, Forwards LER 98-005-01 Re Failure to Verify Closed Pcivs,Per TS Sr.Commitments Made in Rept,Listed + (08:35:44, 23 May 2025)
- IR 05000461/1997003 + (08:35:47, 23 May 2025)
- ML20217P276 + (08:35:50, 23 May 2025)
- NPL-98-0311, Forwards Annual Monitoring Rept for 1997, for Point Beach Nuclear Plant, & Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm. Annual Monitoring Rept Contains Info Re Plant Releases,Solid Waste Shipments & New & Spent Fuel Shipments + (08:35:52, 23 May 2025)
- ML20217P155 + (08:36:16, 23 May 2025)
- RA99-133, Forwards Third Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization. Ltr from Leggette,Brashears & Graham,Inc, Authorizing Reproduction of Repts,Encl + (08:36:31, 23 May 2025)
- ML20217P097 + (08:36:34, 23 May 2025)
- ML20217P095 + (08:36:35, 23 May 2025)
- ML20217P081 + (08:36:39, 23 May 2025)
- ML20217P075 + (08:36:41, 23 May 2025)
- ML20217P072 + (08:36:42, 23 May 2025)
- ML20217P069 + (08:36:44, 23 May 2025)
- ML20217P064 + (08:36:49, 23 May 2025)
- L-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld + (08:36:50, 23 May 2025)
- ML20217P032 + (08:37:02, 23 May 2025)
- 05000336/LER-1997-033-01, Forwards LER 97-033-01,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970727.LER Submitted Per 10CFR50.73(a)(2)(ii) & 10CFR50.73(a)(2)(v) + (08:37:03, 23 May 2025)
- 05000327/LER-1999-002-03, :on 990916,EDG Started as Result of Cable Being Damaged During Installation of Thermo-Lag for Kaowool Upgrade Project.Caused by Inadequate pre-job Briefing. Involved Individuals Were Counseled on Event + (08:37:06, 23 May 2025)
- 05000454/LER-1997-023, :on 971229,1B DG Control Power Wiring Discrepancy Occurred Due to Mod Installation Error & Programmatic Deficiencies.Caused by Failure to Use self-check Principles.Counseled Technician + (08:37:07, 23 May 2025)
- SVP-98-160, Forwards 1997 Annual Radiological Environ Operating Rept for Quad Cities Station. Rept Contains Results of Radiological Environ Meteorological Monitoring Programs + (08:37:10, 23 May 2025)
- IR 05000315/1998005 + (08:37:13, 23 May 2025)
- ML20217P010 + (08:37:15, 23 May 2025)
- TAC:M96821 + (08:37:16, 23 May 2025)
- 05000373/LER-1998-001-06, :on 980131,missed TS Fire Watch Were Noted Due to Personnel Error.Terminated Responsible Contracted Fire Watch Inspectors + (08:37:28, 23 May 2025)
- ML20217N954 + (08:37:31, 23 May 2025)
- ML20217N948 + (08:37:33, 23 May 2025)
- 05000219/LER-1998-002-01, :on 980227,480 V Switchgear Room Fire Barrier Deficiency Was Noted.Caused by Inadequate Fire Barrier Spec. Two of Seven Fire Zones Where Conduit Fire Barriers Are Installed Were Reviewed,No Deficiencies Found + (08:37:35, 23 May 2025)
- 05000334/LER-1998-003, :on 980128,failure to Perform Chemical Addition Sys Valve Cycling Surveillance as Required by TSs Occurred. Caused by Inadequate Application of Tss.Test Procedures 1OST-13.11 Was Revised + (08:37:37, 23 May 2025)
- ML20217N930 + (08:37:41, 23 May 2025)
- 05000285/LER-1998-001, :on 980202,TS Violation Occurred Due to Inadequate Inservice Testing.Caused by Lack of Attention to Detail When FCS ISI Program Plan for 3rd ten-year Interval Was Put Together in 1992.Changes Will Be Made + (08:37:43, 23 May 2025)
- ML20217N926 + (08:37:45, 23 May 2025)
- 05000219/LER-1998-003-01, :on 980303,failure to Perform High Drywell Pressure Check Surveillance Was Noted.Caused by Inadequate Procedure.Reviewed & Revised Appropriate Plant Documents & Provided Operator Training + (08:37:47, 23 May 2025)
- ML20217N914 + (08:37:50, 23 May 2025)
- 05000362/LER-1984-045-01, :on 840719,recognized That Four Iodine Transients Met Reporting Criteria of TS 3.4.7,but Had Not Been Reported.Cause Indeterminate.Nrc Approved TS Amend Which Deleted Reporting Requirement of TS 3.4.7.A + (08:37:51, 23 May 2025)
- ML20217N911 + (08:37:53, 23 May 2025)
- ML20217N902 + (08:37:57, 23 May 2025)
- ML20217N893 + (08:38:00, 23 May 2025)