Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217Q103 + (08:31:21, 23 May 2025)
- ML20217Q101 + (08:31:22, 23 May 2025)
- ML20217Q093 + (08:31:28, 23 May 2025)
- IR 05000333/1997003 + (08:31:29, 23 May 2025)
- IR 05000354/1997003 + (08:31:32, 23 May 2025)
- IR 05000317/1997003 + (08:31:39, 23 May 2025)
- ML20217Q071 + (08:31:44, 23 May 2025)
- IR 05000327/1997005 + (08:31:45, 23 May 2025)
- ML20217Q056 + (08:31:49, 23 May 2025)
- 05000341/LER-1998-001, :on 980201,automatic Reactor Scram Occurred Due to Main Turbine Trip.Caused by Protective Relay Failure in 345 Kv Switchyard.Circuit Card Was Installed in 50BF Relay for CM Breaker in Jan 1997 + (08:31:51, 23 May 2025)
- ML20217Q039 + (08:31:55, 23 May 2025)
- IR 05000289/1997004 + (08:31:59, 23 May 2025)
- ML20217Q024 + (08:32:01, 23 May 2025)
- ML20217Q021 + (08:32:02, 23 May 2025)
- ML20217Q017 + (08:32:04, 23 May 2025)
- IR 05000317/1997002 + (08:32:06, 23 May 2025)
- IR 05000245/1997002 + (08:32:09, 23 May 2025)
- IR 05000333/1997004 + (08:32:10, 23 May 2025)
- IR 05000317/1996010 + (08:32:13, 23 May 2025)
- ML20217P991 + (08:32:15, 23 May 2025)
- ML20217P984 + (08:32:17, 23 May 2025)
- ML20217P972 + (08:32:20, 23 May 2025)
- 05000454/LER-1998-007-01, :on 980306,process Sampling Valve 1PS9354A Was Found W/Packing Leak.Caused by Personnel Error That Did Not Verify Adequate Testing.Declared Subject Valve Inoperable, Entered LCO & Will Revise Procedures + (08:32:27, 23 May 2025)
- IR 05000331/1997009 + (08:32:29, 23 May 2025)
- ML20217P933 + (08:32:32, 23 May 2025)
- IR 05000321/1997006 + (08:32:38, 23 May 2025)
- IR 05000289/1997009 + (08:32:40, 23 May 2025)
- ML20217P859 + (08:32:49, 23 May 2025)
- 05000295/LER-1997-015-01, :on 970724,Unit 1 EDGs & Unit 2 RHR Sys Was Declared Inoperable Which Resulted in Inadvertent ESF While Performing TS Related Surveillance.Caused by Unclear Expectations.Declared EDG Operable on 970729 + (08:32:52, 23 May 2025)
- IR 05000254/1997002 + (08:32:56, 23 May 2025)
- ML20217P796 + (08:33:05, 23 May 2025)
- ML20217P782 + (08:33:09, 23 May 2025)
- ML20217P780 + (08:33:11, 23 May 2025)
- IR 05000277/1998001 + (08:33:41, 23 May 2025)
- IR 05000324/1997012 + (08:33:43, 23 May 2025)
- ML20217P719 + (08:33:48, 23 May 2025)
- IR 05000219/1996009 + (08:33:56, 23 May 2025)
- IR 05000334/1997009 + (08:34:08, 23 May 2025)
- L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station + (08:34:31, 23 May 2025)
- ML20217P491 + (08:34:42, 23 May 2025)
- ML20217P482 + (08:34:46, 23 May 2025)
- 05000424/LER-1997-002-02, Forwards LER 97-002-02,per 10CFR50.73.Encl Is Second Rev to LER Originally Submitted on 970220 & First Revised on 970730.Revs Are Marked W/Rev Bars in Left Hand Border + (08:35:09, 23 May 2025)
- ML20217P386 + (08:35:15, 23 May 2025)
- ML20217P367 + (08:35:20, 23 May 2025)
- ML20217P348 + (08:35:26, 23 May 2025)
- TXX-9805, Requests Relief to Unit 2 ISI Program IAW Requirements of 10CFR50.55a(g)(5)(iii).Relief Requests B-4,B-5,B-6,C-2 & C-3 Encl for Approval + (08:35:29, 23 May 2025)
- NSD-NRC-98-5640, Transmits Rev 4 of Section 3.0, Non-Sys Based Design Descriptions & ITAAC & Section 5.0, Site Parameters of AP600 Certified Design Matl.Changes Made as Result of W Responses to NRC Questions & FSER Open Items Since 970516 + (08:35:35, 23 May 2025)
- ML20217P319 + (08:35:37, 23 May 2025)
- ML20217P308 + (08:35:39, 23 May 2025)
- 05000461/LER-1998-005-01, Forwards LER 98-005-01 Re Failure to Verify Closed Pcivs,Per TS Sr.Commitments Made in Rept,Listed + (08:35:44, 23 May 2025)
- IR 05000461/1997003 + (08:35:47, 23 May 2025)