Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20232D114 + (08:17:41, 23 May 2025)
- EPID:L-2020-DPS-0000 + (08:17:43, 23 May 2025)
- EPID:L-2020-LLE-0094 + (08:17:47, 23 May 2025)
- EPID:L-2020-LLR-0012 + (08:17:51, 23 May 2025)
- ML20231A835 + (08:17:57, 23 May 2025)
- ML20231A538 + (08:18:04, 23 May 2025)
- PMNS20200894, Public Scoping Meeting to Discuss the Review and Potential Update of NUREG1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plantsfinal Report (Lr GEIS) + (08:18:11, 23 May 2025)
- EPID:L-2018-LLM-0015 + (08:18:13, 23 May 2025)
- ML20227A344 + (08:18:34, 23 May 2025)
- PMNS20200893, Public Scoping Meeting to Discuss the Review and Potential Update of NUREG1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plantsfinal Report (Lr GEIS) + (08:18:36, 23 May 2025)
- PMNS20200892, Public Scoping Meeting to Discuss the Review and Potential Update of NUREG1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plantsfinal Report (Lr GEIS) + (08:18:37, 23 May 2025)
- ML20226A444 + (08:18:57, 23 May 2025)
- VR-SECY-19-0072, Denial of Petition for Rulemaking on Measurement and Control of Combustible Gas Generation and Dispersal (PRM-50-103; NRC-2011-0189) (Hanson) + (08:19:05, 23 May 2025)
- PMNS20200903, Risk Informed Process for Exemptions (RIPE) Public Meeting + (08:19:47, 23 May 2025)
- Information Notice 2007-21, Pipe Wear Due to Interaction of Flow-Induced Vibration and Reflective Metal Insulation + (08:19:52, 23 May 2025)
- ML20225A196 + (08:19:54, 23 May 2025)
- ML20225A093 + (08:20:07, 23 May 2025)
- ML20225A029 + (08:20:11, 23 May 2025)
- ML20225A025 + (08:20:14, 23 May 2025)
- ML20224A521 + (08:20:19, 23 May 2025)
- ML20224A211 + (08:20:40, 23 May 2025)
- ML20224A009 + (08:21:08, 23 May 2025)
- PMNS20200916, Decommissioning Webinar + (08:21:17, 23 May 2025)
- PMNS20200917, Webinar Regarding Post-Shutdown Activities Report (PSDAR) + (08:21:32, 23 May 2025)
- EPID:L-2019-CRS-0002 + (08:21:44, 23 May 2025)
- PMNS20200914, Public Predecisional Enforcement Conference with the Queens Medical Center + (08:21:51, 23 May 2025)
- Regulatory Guide 3.72 + (08:21:54, 23 May 2025)
- ML20219A414 + (08:22:07, 23 May 2025)
- ML20219A292 + (08:22:08, 23 May 2025)
- ML20218A663 + (08:22:17, 23 May 2025)
- ML20218A576 + (08:22:23, 23 May 2025)
- PMNS20200830, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (08:22:42, 23 May 2025)
- ML20218A432 + (08:22:43, 23 May 2025)
- PMNS20200879, Notice of Virtual Meeting to Discuss Changes to Emergency Preparedness Digital Assets Cyber Security + (08:22:48, 23 May 2025)
- IR 05000321/2020002 + (08:22:51, 23 May 2025)
- 05000424/LER-1997-005-02, :on 970804,test Procedure Inadequacy Results in AFW Actuation Occurred.Caused by Procedure Inadequacy. Procedure Will Be Revised + (08:22:57, 23 May 2025)
- IR 05000369/1997300 + (08:23:29, 23 May 2025)
- ML20217R348 + (08:23:31, 23 May 2025)
- IR 05000282/1997008 + (08:23:38, 23 May 2025)
- IR 05000295/1997020 + (08:23:40, 23 May 2025)
- ML20217R332 + (08:23:43, 23 May 2025)
- ML20217R329 + (08:23:45, 23 May 2025)
- 05000265/LER-1997-006-06, :on 970729,cable for Unit 2 in Same Fire Area as Fire of Concern Due to Ineffective Implementation of Original Safe Shutdown Analysis.Rev to Ssd Analysis to Credit Alternate Power Feeds,Will Be Performed + (08:23:48, 23 May 2025)
- 05000265/LER-1997-006, Forwards LER 97-006-00 Re Cable in Unit 2 Being in Same Fire Area as Fire of Concern Due to Ineffective Implementation of Original Safe Shutdown Analysis.List of Commitments Provided + (08:23:49, 23 May 2025)
- 05000334/LER-1997-022, :on 970730,ESFA of P-12 Interlock Occurred Due to Decreased Reactor Water Temp.Caused by Operator Unfamiliarity W/Level Controller Response in All Situations. Controller Windup Will Be Demonstrated + (08:23:52, 23 May 2025)
- 05000482/LER-1997-010-01, Forwards LER 97-010-01 Re Failure to Test All Contacts on Slave Relay in Solid State Protection Sys.Event Is Second Discovery of Surveillance Test Deficiency Found During GL 96-01 Review Program + (08:23:55, 23 May 2025)
- ML20217R299 + (08:24:04, 23 May 2025)
- ML20217R298 + (08:24:05, 23 May 2025)
- 05000334/LER-1997-023, :on 970801,determined Two Analog Rod Position Indicators (Arpi) Channels Inoperable.Caused by Calibr Drift of Arpi Sys.Will Complete Mod to Upgrade Arpi Sys During Upcoming Unit 1 Refueling Outage + (08:24:14, 23 May 2025)
- 05000482/LER-1997-014, :on 970730,determined That Waste Gas Sys Hydrogen/Oxygen Analyzers Were Not Operated IAW Tech Spec Requirements.Caused by Inadequate Administrative Controls. Revised Applicable Procedures + (08:24:16, 23 May 2025)
- ML20217R278 + (08:24:20, 23 May 2025)