Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009E628 + (13:32:20, 21 December 2024)
- ML20009E624 + (13:32:21, 21 December 2024)
- ZS-2019-0114, Restoration Project Final Status Survey Report - Phase 3, A14 FSS Release Record - Survey Unit 10209E + (13:32:22, 21 December 2024)
- ML20009E622 + (13:32:25, 21 December 2024)
- ML20009E621 + (13:32:27, 21 December 2024)
- 05000298/LER-1981-011-03, /03L-0:on 810528,during Insp of Unexpected Alarm, CS Header Break Detection Instrument Switches Found Piped to Incorrect Lines.Caused by Connection to Wrong Line at Drywell Penetration.Instruments Connected to Proper Lines + (13:32:28, 21 December 2024)
- ML20009E619 + (13:32:30, 21 December 2024)
- ML20009E618 + (13:32:31, 21 December 2024)
- ML20009E617 + (13:32:32, 21 December 2024)
- ML20009E616 + (13:32:34, 21 December 2024)
- ML20009E615 + (13:32:35, 21 December 2024)
- 05000254/LER-1981-012-03, /03L-0:on 810624,pressure Switch 1-5600-PS-3 Tripped Below Tech Spec Level During Loss of Electrohydraulic Fluid Pressure Calibr & Functional Test. Caused by Instrument Drift.Switch Recalibr & Tested + (13:32:36, 21 December 2024)
- ML20009E612 + (13:32:42, 21 December 2024)
- ML20009E611 + (13:32:44, 21 December 2024)
- ML20009E610 + (13:32:45, 21 December 2024)
- ML20009E609 + (13:32:46, 21 December 2024)
- ML20009E607 + (13:32:48, 21 December 2024)
- ML20009E606 + (13:32:49, 21 December 2024)
- ML20009E605 + (13:32:51, 21 December 2024)
- ML20009E604 + (13:32:52, 21 December 2024)
- ML20009E602 + (13:32:53, 21 December 2024)
- ML20009E601 + (13:32:54, 21 December 2024)
- ML20009E600 + (13:32:56, 21 December 2024)
- ML20009E599 + (13:32:57, 21 December 2024)
- ML20009E598 + (13:32:58, 21 December 2024)
- 05000348/LER-1981-046-03, /03L-0:on 810620,chlorine Detector a Declared Inoperable When Detector Alarmed & Would Not Reset.Caused by Faulty Bulb.Bulb Replaced & Chlorine Detector Returned to Svc + (13:33:00, 21 December 2024)
- ML20009E595 + (13:33:01, 21 December 2024)
- ML20009E594 + (13:33:03, 21 December 2024)
- ML20009E592 + (13:33:05, 21 December 2024)
- 05000298/LER-1981-011, Forwards LER 81-011/03L-0.Detailed Event Analysis Submitted + (13:33:06, 21 December 2024)
- ML20009E589 + (13:33:08, 21 December 2024)
- AECM-81-246, Forwards Revised FSAR Section 7.5.1.3,clarifying Administrative Controls Re Infrequently Operated Valves Which Could Impair Engineered Safety Feature Performance,In Response to NRC Concerns Raised at 810609 & 10 Meeting + (13:33:09, 21 December 2024)
- ML20009E586 + (13:33:12, 21 December 2024)
- ML20009E585 + (13:33:13, 21 December 2024)
- ML20009E584 + (13:33:15, 21 December 2024)
- 05000254/LER-1981-012, Forwards LER 81-012/03L-0 + (13:33:16, 21 December 2024)
- ML20009E581 + (13:33:18, 21 December 2024)
- ML20009E580 + (13:33:19, 21 December 2024)
- ML20009E579 + (13:33:20, 21 December 2024)
- ML20009E578 + (13:33:22, 21 December 2024)
- ML20009E577 + (13:33:23, 21 December 2024)
- 05000366/LER-1981-060-03, /03L-0:on 810622,inboard Reactor Water Cleanup Primary Containment Isolation Valve Found Open in Presence of Isolation Signal.Caused by Attempt to Electrically Close Valve After Backseating to Repair Packing Leak + (13:33:25, 21 December 2024)
- ML20009E573 + (13:33:27, 21 December 2024)
- ML20009E572 + (13:33:28, 21 December 2024)
- ML20009E571 + (13:33:30, 21 December 2024)
- ML20009E570 + (13:33:31, 21 December 2024)
- 05000348/LER-1981-046, Forwards LER 81-046/03L-0 + (13:33:33, 21 December 2024)
- ML20009E568 + (13:33:34, 21 December 2024)
- ML20009E566 + (13:33:35, 21 December 2024)
- ML20009E564 + (13:33:36, 21 December 2024)
- ML20009E563 + (13:33:38, 21 December 2024)