December 30, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Zion Nuclear Power Station, Units 1 and 2 An EnergySolutions Company Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304

Subject:

Final Status Survey Final Report - Phase 3

References:

ZS-2019-0114

1) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "Final Status Survey Final Report - Phase l," dated November 1, 2018
2) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "Final Status Survey Final Report - Phase 2, Part l," dated March 11, 2019
3) John B. Hickman, U.S. Nuclear Regulatory Commission, Letter to John Sauger, Energy Solutions, "Zion Nuclear Power Station Units 1 and 2 - Review of Final Status Survey Report - Phase l," dated March 22, 2019
4) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "Final Status Survey Report Phase 1 Request for Additional Information,"

dated May 14, 2019

5) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "Revised Final Status Survey Report-Phase l," dated June 21, 2019
6) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "Revised Final Status Survey Report-Phase 2," dated September 30, 2019
7) Gerard van Noordennen, ZionSolutions, Letter to U.S. Nuclear Regulatory Commission, "Revised Final Status Survey Report-Phase 2 Part 2," dated November 25, 2019 The Zion Station Restoration Project License Termination Plan (L TP) describes the process of releasing land for unrestricted use. L TP Section 5.11 states that the Final Status Survey (FSS) Final Report will be provided to the NRC in phases as remediation and FSS are completed with related portions of the site.

ZionSolutions (ZS) submitted FSS Final Report, Phase 1, Phase 2, Parts 1 and 2 for NRC review, as documented in References 1, 2, 5, 6 and 7. contains the Zion Station Restoration Project FSS Final Report - Phase 3. This Phase 3 Final Report encompasses open land survey units for the eastern portions of the site. This report contains a compilation of forty-one ( 41) survey units contained in forty-one ( 41) release records.

Table 1-1 of the FSS Final Report - Phase 3 provides a listing of all the survey units addressed in this report, along with their classifications and size. Figure 1-1 of the FSS Final Report - Phase 3 depicts the locations of the survey units in relation to the ZNPS site as well as survey unit boundaries.

101 Shiloh Boulevard, Zion* IL 60099 (224) 789-4016

  • Fax: (224) 789-4008
  • www.zionsolutionscompany.com

ZionSolutions, LLC ZS-2019-0114 Page 2 of 2 ZionSolutions anticipates one additional FSS Final Report submittal. The Phase 4 FSS Final Report will encompass the west portions of the site.

ZionSolutions hereby requests the NRC review the attached FSS Final Report - Phase 3 for acceptance of this portion of the site final radiological survey by April 30, 2020.

There are no regulatory commitments made in this submittal. If you should have any questions regarding this submittal, please contact me at (860) 462-9707.

Respectfully, G~~~

Gerard van Noordennen Vice President Regulatory Affairs Attachments: - Final Status Survey Final Report - Phase 3 - Preflight Report

Enclosures:

CD contains Final Status Survey Final Report - Phase 3 cc:

John Hickman, U.S. NRC Senior Project Manager Regional Administrator, U.S. NRC, Region III Service List (Cover letter only, no enclosures)

Zion Nuclear Power Station, Unit 1 and 2 License Transfer Service List cc:

Ken Robuck President and CEO Energy Solutions 299 South Main St,reet, Suite 1700 Salt Lake City, UT 84111 John Sauger President and Chief Nuclear Officer ReactorD&D Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Bruce Hinkley Senior Vice President D&D Operations Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Gerard van N oordennen Senior VP Regulatory Affairs Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Jerry Houff General Manager ZionSolutions, LLC 2701 Deborah Avenue Zion, IL 60099 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Steven A. Reynolds Manager, Nuclear Facility Inspection Division of Nuclear Safety Illinois Emergency Management Agency 245 W. Roosevelt Road, Units 55 & 56 West Chicago, Illinois 60185 Kelly F. Grahn, Senior Health Physicist Illinois Emergency Management Agency Division of Nuclear Safety 245 W Roosevelt Road, Building 8, Suite 55 West Chicago, IL 60185 William P. Mazzeno Emergency Management Coordinator Lake County Emergency Management Agency 1303 N. Milwaukee Avenue Libertyville, IL 60048-1308 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Revised Final Status Survey Report - Phase 3