Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20035C034 + (10:32:42, 20 December 2024)
- ML20035C032 + (10:32:48, 20 December 2024)
- ML20035C031 + (10:32:54, 20 December 2024)
- TAC:M85482 + (10:32:55, 20 December 2024)
- ML20035C028 + (10:33:00, 20 December 2024)
- ML20035C027 + (10:33:06, 20 December 2024)
- IR 05000313/1993003 + (10:33:12, 20 December 2024)
- IR 05000160/1993001 + (10:33:19, 20 December 2024)
- IR 05000333/1993005 + (10:33:28, 20 December 2024)
- PNO-I-93-017, on 930326,six Lamb Carcasses Containing Licensed Matl Mistakenly Shipped from Facility W/Other Biohazard Carcasses.Caused by Freezer Normally Used for Radioactive Matl Not Being Operational.Meeting Held 930329 + (10:33:35, 20 December 2024)
- ML20035C021 + (10:33:41, 20 December 2024)
- ML20035C019 + (10:33:47, 20 December 2024)
- ML20035C018 + (10:33:53, 20 December 2024)
- ML20035C014 + (10:34:06, 20 December 2024)
- PNO-IV-93-013, on 930330,low Magnitude Earthquake Occurred at Plant.Notification of Unusual Event Declared Immediately. Extensive Plant Tours & Surveillance Tests Conducted to Ensure That safety-related Equipment Unaffected + (10:34:13, 20 December 2024)
- IR 05000220/1993002 + (10:34:19, 20 December 2024)
- ML20035C011 + (10:34:29, 20 December 2024)
- ML20035C007 + (10:34:43, 20 December 2024)
- ML20035C002 + (10:34:49, 20 December 2024)
- IR 05000271/1993004 + (10:34:56, 20 December 2024)
- ML20035B997 + (10:35:03, 20 December 2024)
- ML20035B996 + (10:35:10, 20 December 2024)
- ML20035B995 + (10:35:16, 20 December 2024)
- ML20035B993 + (10:35:22, 20 December 2024)
- ML20035B992 + (10:35:28, 20 December 2024)
- ML20035B991 + (10:35:37, 20 December 2024)
- 05000455/LER-1993-002-08, :on 930311,determines Unit 1 Essential Svc Water Pump Availability to Unit 2 Surveillance Not Complete. Caused by Failure to Complete Requirements of Shift/Daily Operating Surveillance.Surveillance Revised + (10:35:43, 20 December 2024)
- IR 05000155/1993005 + (10:35:50, 20 December 2024)
- 05000328/LER-1993-001-04, :on 930301,extraction Steam Line Rupture Causes High Generator Output Voltage & Manual Reactor Trip.Caused by Programmatic Failure of Erosion/Corrosion Program.Insps, Repair & Replacements Will Be Performed + (10:35:56, 20 December 2024)
- ML20035B987 + (10:36:03, 20 December 2024)
- ML20035B986 + (10:36:09, 20 December 2024)
- ML20035B984 + (10:36:15, 20 December 2024)
- ML20035B982 + (10:36:21, 20 December 2024)
- ML20035B980 + (10:36:27, 20 December 2024)
- ML20035B978 + (10:36:33, 20 December 2024)
- ML20035B977 + (10:36:39, 20 December 2024)
- ML20035B976 + (10:36:46, 20 December 2024)
- ML20035B975 + (10:36:47, 20 December 2024)
- ML20035B974 + (10:36:48, 20 December 2024)
- ML20035B972 + (10:36:49, 20 December 2024)
- 05000334/LER-1993-005, :on 930302,identified Discrepancy in QA Categorization of Solenoid Valve.Caused by Inappropriate Replacement of Valve During Maint in 1986.Design Change Process Includes Administrative Guidance + (10:36:51, 20 December 2024)
- IR 05000331/1993003 + (10:36:53, 20 December 2024)
- 05000325/LER-1993-006, :on 930302,identified Several Fire Barrier Penetrations W/Fire Seal Application Discrepancies.Caused by Inadequate Design.Fire Watches Stationed & Will Remain Until Deficient Fire Seals Restored + (10:36:58, 20 December 2024)
- ML20035B967 + (10:37:01, 20 December 2024)
- 05000352/LER-1993-003-02, :on 930303,A & B Toxic Gas Analyzers Declared Inoperable Since Analyzers Would Not Respond to Presence of Ammonia.Caused by Hardware Deficiency.Reduced Flush Time Incorporated Into Site Procedures + (10:37:03, 20 December 2024)
- ML20035B964 + (10:37:08, 20 December 2024)
- ML20035B963 + (10:37:09, 20 December 2024)
- IR 05000298/1993007 + (10:37:13, 20 December 2024)
- 05000353/LER-1993-004-01, :on 930303,inadvertent EDG Start as Result of Personnel Error from Misunderstood Verbal Communication During Performance of Procedure.Test Director Counseled Re Event & Importance of Proper Communication + (10:37:16, 20 December 2024)
- ML20035B959 + (10:37:17, 20 December 2024)
- ML20035B958 + (10:37:41, 20 December 2024)