Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000333/LER-1993-007-01, :on 930322,determined That Thermal Power Trip Function of APRM Not Tested to Completion When RPS Bypassed Resulting in Blocked Initiation of Scram Signal.Caused by Procedural Deficiency.Procedures Revised + (09:15:43, 20 December 2024)
- ML20035G232 + (09:15:45, 20 December 2024)
- ML20035G231 + (09:15:46, 20 December 2024)
- ML20035G229 + (09:15:47, 20 December 2024)
- ML20035G228 + (09:15:48, 20 December 2024)
- ML20035G227 + (09:15:49, 20 December 2024)
- ML20035G224 + (09:15:51, 20 December 2024)
- ML20035G223 + (09:15:52, 20 December 2024)
- ML20035G221 + (09:15:53, 20 December 2024)
- ML20035G219 + (09:15:54, 20 December 2024)
- ML20035G218 + (09:15:55, 20 December 2024)
- ML20035G217 + (09:15:56, 20 December 2024)
- ML20035G214 + (09:15:57, 20 December 2024)
- ML20035G211 + (09:15:59, 20 December 2024)
- ML20035G204 + (09:16:00, 20 December 2024)
- ML20035G202 + (09:16:01, 20 December 2024)
- ML20035G201 + (09:16:02, 20 December 2024)
- ML20035G200 + (09:16:10, 20 December 2024)
- ML20035G199 + (09:16:12, 20 December 2024)
- ML20035G198 + (09:16:13, 20 December 2024)
- LD-93-068, Forwards Revised Bases for Sys 80+ Ts.Revs Will Be Included in CESSAR-Design Certification,Amend O,Which Will Be Printed in May 1993 + (09:16:17, 20 December 2024)
- LD-93-065, Forwards Markups to CESSAR-Design Certification for Closure of Corresponding Dser,Including Revs to I&C Sys Descriptions in Chapter 7 & Revs to Fire Protection Sys Description in Section 9.5.1 + (09:16:23, 20 December 2024)
- ML20035G194 + (09:16:25, 20 December 2024)
- ML20035G193 + (09:16:27, 20 December 2024)
- ET-NRC-93-3862, Forwards Rev 1 to Proprietary NRC-Requested Catawba Unit 1 SG Leakage Evaluation, in Response to NRC Request at Unit 1 SG Tube Interim Plugging Criterion Meeting of 930401.Rev Withheld (Ref 10CFR2.790) + (09:16:28, 20 December 2024)
- ML20035G191 + (09:16:34, 20 December 2024)
- ML20035G190 + (09:16:35, 20 December 2024)
- ML20035G189 + (09:16:36, 20 December 2024)
- ML20035G188 + (09:16:37, 20 December 2024)
- ML20035G186 + (09:16:38, 20 December 2024)
- ML20035G184 + (09:16:39, 20 December 2024)
- 05000353/LER-1993-005, :on 930326,reactor Scram Occurred in Response to Inadvertent Closure of Main Turbine/Main Stop Valves & Automatic Reactor Protection Sys Actuated.Caused by Air Entrained in Control Sys.Orifices Installed in Ports + (09:16:41, 20 December 2024)
- 05000382/LER-1992-019-01, :on 920327,indicated That Actual RCS Boron Concentration Below Required Concentration.Caused by Inadequate Procedure Guidance.C/A Included Procedure Changes to Account for Training of Personnel + (09:16:43, 20 December 2024)
- ML20035G175 + (09:16:45, 20 December 2024)
- ML20035G174 + (09:16:46, 20 December 2024)
- 05000354/LER-1993-001, :on 930216,while Performing Monthly Functional Test for HPCI Sys Delta T Channel A5,discovered That Channel Under Test in Bypass Condition.Caused by Procedural Inadequacy.Procedures Re Use of Spare Channel Revised + (09:16:48, 20 December 2024)
- ML20035G170 + (09:16:50, 20 December 2024)
- 05000354/LER-1993-001-01, Forwards Revised LER 93-001-01,correcting Typo in LER Number Specified in Previous Occurrence Section from 86-009-00 to 89-006-00 + (09:16:52, 20 December 2024)
- ML20035G166 + (09:16:55, 20 December 2024)
- 05000282/LER-1990-002-01, Forwards LER 90-002-01 Re Excessive Pressurizer Cooldown Rate & Excessive Spray/Pressurizer delta-T.Procedures Will Be Revised to Require Use of Pressurizer Water Temp for Determining Pressurizer Heatup & Cooldown Rates + (09:16:59, 20 December 2024)
- ML20035G162 + (09:17:01, 20 December 2024)
- ML20035G161 + (09:17:02, 20 December 2024)
- ML20035G159 + (09:17:03, 20 December 2024)
- ML20035G158 + (09:17:04, 20 December 2024)
- 05000382/LER-1993-001-03, :on 930304,reactor Trip Occurred as Result of Two Nearly Simultaneous Power Supply Failures.Caused by age- Related Degradation of Frequency Detection Card.Cards Replaced & Updated Power Supply Installed + (09:17:06, 20 December 2024)
- 05000382/LER-1993-001, Forwards Corrected LER 93-001-00,superseding LER W/Same Number Dtd 930401.Reporting Requirement in Block 11 Marked Incorrectly in Original Rept + (09:17:07, 20 December 2024)
- ML20035G154 + (09:17:09, 20 December 2024)
- ML20035G151 + (09:17:10, 20 December 2024)
- ML20035G149 + (09:17:10, 20 December 2024)
- ML20035G147 + (09:17:11, 20 December 2024)
- LD-93-066, Confirms That full-size P&Ids of CESSAR-DC Figures Listed in Inservice Testing Program,Transmitted Via ,Sent to BNL to Support NRC Review of Program + (09:17:12, 20 December 2024)