Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122) + (20:45:49, 2 January 2025)
- 05000186/LER-2024-001, Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d + (20:45:57, 2 January 2025)
- ML24145A128 + (20:46:02, 2 January 2025)
- RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications + (20:46:04, 2 January 2025)
- 05000387/LER-2024-001, Main Steam Isolation Valve Leakage + (20:46:23, 2 January 2025)
- 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater + (20:46:23, 2 January 2025)
- IR 05000338/2024010 + (20:46:26, 2 January 2025)
- IR 05000443/2024011 + (20:46:30, 2 January 2025)
- ML24144A094 + (20:46:44, 2 January 2025)
- ML24142A442 + (20:47:22, 2 January 2025)
- ML24142A438 + (20:47:24, 2 January 2025)
- ML24142A385 + (20:47:37, 2 January 2025)
- STC-24-029, Notification of the NRC SECY-24-0035, Advancing the Use of Artificial Intelligence at the U.S. Nuclear Regulatory Commission + (20:48:03, 2 January 2025)
- ML24141A286 + (20:48:22, 2 January 2025)
- 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation + (20:48:43, 2 January 2025)
- IR 05000259/2024403 + (20:48:47, 2 January 2025)
- 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications + (20:48:49, 2 January 2025)
- ML24141A146 + (20:48:51, 2 January 2025)
- LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle + (20:48:55, 2 January 2025)
- 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip + (20:48:56, 2 January 2025)
- ML24141A101 + (20:48:59, 2 January 2025)
- 05000323/LER-2024-001, LCO 3.0.3 Completion Time Limits + (20:49:08, 2 January 2025)
- IR 05000461/2024012 + (20:49:33, 2 January 2025)
- 05000373/LER-2024-002, Reactor Protection System Half Scram Due to Motor Generator Set Electric Power Monitoring Assembly Output Breaker Trip + (20:49:35, 2 January 2025)
- 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure + (20:49:37, 2 January 2025)
- EPID:L-2023-LLA-0038 + (20:49:44, 2 January 2025)
- SRM-M240516A, Enclosure - Affirmation Session - SECY-24-0017: Final Rule - Renewing Nuclear Power Plant Operating Licenses - Environmental Review (Rin 3150-AK32; NRC-2018-0296) + (20:49:54, 2 January 2025)
- IR 05000272/2024010 + (20:50:02, 2 January 2025)
- ML24137A088 + (20:50:09, 2 January 2025)
- 05000341/LER-2024-002, Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications + (20:50:13, 2 January 2025)
- 05000341/LER-2024-001, Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-22 + (20:50:25, 2 January 2025)
- NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report + (20:50:31, 2 January 2025)
- 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum + (20:50:32, 2 January 2025)
- ML24136A196 + (20:50:34, 2 January 2025)
- 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure + (20:50:36, 2 January 2025)
- ML24136A138 + (20:50:38, 2 January 2025)
- ML24136A062 + (20:50:53, 2 January 2025)
- BW240026, Annual Radiological Environmental Operating Report (1 January Through 31 December 2023) + (20:50:58, 2 January 2025)
- ML24135A321 + (20:51:06, 2 January 2025)
- ML24135A315 + (20:51:08, 2 January 2025)
- L-MT-24-013, 2023 Annual Radiological Environmental Operating Report + (20:51:13, 2 January 2025)
- IR 05000336/2024001 + (20:51:15, 2 January 2025)
- ML24135A106 + (20:51:29, 2 January 2025)
- ML24135A104 + (20:51:30, 2 January 2025)
- ML24135A101 + (20:51:32, 2 January 2025)
- ML24135A100 + (20:51:34, 2 January 2025)
- ML24135A098 + (20:51:36, 2 January 2025)
- ML24135A095 + (20:51:38, 2 January 2025)
- ML24135A090 + (20:51:40, 2 January 2025)
- SVPLTR 24-0018, Annual Radiological Environmental Operating Report + (20:51:45, 2 January 2025)
- 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical + (20:51:50, 2 January 2025)