Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19316A427 + (05:30:08, 2 January 2025)
- ML19316A425 + (05:30:09, 2 January 2025)
- ML19316A424 + (05:30:10, 2 January 2025)
- ML19316A423 + (05:30:10, 2 January 2025)
- ML19316A422 + (05:30:11, 2 January 2025)
- ML19316A421 + (05:30:11, 2 January 2025)
- 05000269/LER-1978-029-03, /03L-0:on 780105,Unit 2 Failed to Start on Initiation.Caused by Failure of Breaker DB-26 to Close. Breaker Verified Operable by Subsequent Operation.Insp & Servicing Resulted in No Further Corrective Action + (05:30:12, 2 January 2025)
- ML19316A419 + (05:30:16, 2 January 2025)
- ML19316A417 + (05:30:17, 2 January 2025)
- ML19316A418 + (05:30:17, 2 January 2025)
- ML19316A416 + (05:30:18, 2 January 2025)
- ML19316A414 + (05:30:19, 2 January 2025)
- ML19316A415 + (05:30:19, 2 January 2025)
- ML19316A411 + (05:30:20, 2 January 2025)
- ML19316A412 + (05:30:20, 2 January 2025)
- ML19316A410 + (05:30:21, 2 January 2025)
- 05000269/LER-1978-006-03, /03L-0:on 780305,Keowee Hydro Unit 2 Failed to Start.Caused by Inoperable Field Flashing Breaker.Breaker Failed on Three Previous Occasions (ROs 269/77-29,269/78- 01 & 269/78-03).Cause Unknown & Under Investigation + (05:30:22, 2 January 2025)
- ML19316A406 + (05:30:24, 2 January 2025)
- ML19316A407 + (05:30:24, 2 January 2025)
- ML19316A404 + (05:30:25, 2 January 2025)
- ML19316A405 + (05:30:25, 2 January 2025)
- ML19316A402 + (05:30:26, 2 January 2025)
- ML19316A403 + (05:30:26, 2 January 2025)
- 05000269/LER-1978-006, Forwards RO-269/78-06 & LER 78-006/03L-0 + (05:30:28, 2 January 2025)
- ML19316A399 + (05:30:29, 2 January 2025)
- ML19316A398 + (05:30:30, 2 January 2025)
- ML19316A397 + (05:30:31, 2 January 2025)
- ML19316A395 + (05:30:32, 2 January 2025)
- ML19316A396 + (05:30:32, 2 January 2025)
- ML19316A394 + (05:30:34, 2 January 2025)
- ML19316A393 + (05:30:36, 2 January 2025)
- 05000269/LER-1978-010-01, /01T-0:on 780324,Unit 2 Not Verified Operable within Tech Specs Limit.Caused by Failure to Properly Issue & Follow Procedures Which Resulted in Exceeding Tech Spec Limits.Personnel Reinstructed & Procedures Rewritten + (05:30:37, 2 January 2025)
- ML19316A391 + (05:30:40, 2 January 2025)
- ML19316A390 + (05:30:41, 2 January 2025)
- ML19316A389 + (05:30:42, 2 January 2025)
- ML19316A388 + (05:30:43, 2 January 2025)
- ML19316A387 + (05:30:44, 2 January 2025)
- ML19316A385 + (05:30:44, 2 January 2025)
- 05000269/LER-1978-008-03, /03L-0:on 780315,valve 1FDW-108 Failed to Close. Failure Has Occurred Previously.Caused by Apparent Inability to Withstand Environ.Valves FDW-106 & 108 Will Be Replaced W/Valves of Appropriate Design + (05:30:45, 2 January 2025)
- ML19316A383 + (05:30:47, 2 January 2025)
- ML19316A382 + (05:30:49, 2 January 2025)
- ML19316A381 + (05:30:49, 2 January 2025)
- ML19316A380 + (05:30:50, 2 January 2025)
- ML19316A378 + (05:30:51, 2 January 2025)
- ML19316A377 + (05:30:53, 2 January 2025)
- ML19316A374 + (05:30:53, 2 January 2025)
- ML19316A372 + (05:30:55, 2 January 2025)
- 05000269/LER-1978-013-01, /01T-0:on 780421,primary-to-secondary Leak Indicated.Caused by Leaking Tubes Due to Weld Crack.Five Tubes Plugged.Investigations by Util & B&W Continuing + (05:30:57, 2 January 2025)
- ML19316A370 + (05:30:58, 2 January 2025)
- ML19316A369 + (05:30:59, 2 January 2025)
- ML19316A367 + (05:31:00, 2 January 2025)