Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20045D650 + (16:35:56, 19 December 2024)
- B14516, Forwards Request for Relief from ASME Code,Section XI Requirements to Make Interim Repairs to Leak in Svc Water Sys Piping Line 3SWP-150-064-3,as Alternative to IWA-7000 Replacement,Per GL 90-05 + (16:35:57, 19 December 2024)
- ML20045D646 + (16:36:00, 19 December 2024)
- 05000309/LER-1993-011, :on 930525,integrity of Inner Door of Containment Hatch Compromised.On 930526,hatch Outer Door Opened for Maint on Inner Door & TS 3.0.A.2 Entered.Caused by Failure of O-ring to Seal Uniformly & Lubricant Buildup + (16:36:06, 19 December 2024)
- ML20045D641 + (16:36:08, 19 December 2024)
- ML20045D638 + (16:36:10, 19 December 2024)
- 05000325/LER-1993-005, :on 930214,testing of SBGT Showed That Unthrottled Flow of Single Train Would Exceed TS Rated Flow Limit of 3,330 Cfm.Caused by Design Deficiency.Existing SBGT Heaters Upgraded & Rewired + (16:36:12, 19 December 2024)
- 05000325/LER-1993-005-01, Forwards LER 93-005-01,submitted W/Suppl Info Section to Rept Evaluation Results + (16:36:14, 19 December 2024)
- ML20045D634 + (16:36:17, 19 December 2024)
- 05000213/LER-1993-006, :on 930523,EDG Failure Occurred Due to Diode Assembly Short.C/As:Installed New Diode Assemblies & Ventilation Fan Motors for Both Generators + (16:36:19, 19 December 2024)
- BSEP-93-0096, Responds to Violations Noted in Insp Repts 50-324/93-19 & 50-325/93-19 on 930403-30.Corrective Actions:Briefing Conducted on Containment Atmospheric Control Valve Clearance Event & Line Mgt Involvement Increased + (16:36:22, 19 December 2024)
- ML20045D631 + (16:36:24, 19 December 2024)
- ML20045D630 + (16:36:25, 19 December 2024)
- ML20045D625 + (16:36:27, 19 December 2024)
- ML20045D626 + (16:36:27, 19 December 2024)
- 1CAN069301, Defers Proposed Mod of Control Room Human Engineering Discrepancies on VSF-9 Ventilation Sys,Per Crdr Final Summary Rept Submitted Via ,Until Refueling Outage 12 + (16:36:28, 19 December 2024)
- ML20045D623 + (16:36:30, 19 December 2024)
- TAC:M86377 + (16:36:33, 19 December 2024)
- ML20045D622 + (16:36:33, 19 December 2024)
- ML20045D621 + (16:36:35, 19 December 2024)
- ML20045D620 + (16:36:37, 19 December 2024)
- ML20045D619 + (16:36:37, 19 December 2024)
- ML20045D618 + (16:36:38, 19 December 2024)
- ML20045D616 + (16:36:46, 19 December 2024)
- ML20045D615 + (16:36:47, 19 December 2024)
- ML20045D614 + (16:36:53, 19 December 2024)
- ML20045D613 + (16:36:59, 19 December 2024)
- ML20045D609 + (16:37:10, 19 December 2024)
- ML20045D608 + (16:37:16, 19 December 2024)
- ML20045D606 + (16:37:22, 19 December 2024)
- TAC:M81506 + (16:37:23, 19 December 2024)
- ML20045D605 + (16:37:24, 19 December 2024)
- ML20045D604 + (16:37:26, 19 December 2024)
- ML20045D601 + (16:37:28, 19 December 2024)
- ML20045D602 + (16:37:28, 19 December 2024)
- ML20045D600 + (16:37:29, 19 December 2024)
- 05000331/LER-1993-003, :on 930525,primary Containment Isolation Sys Half Group III Isolation Occurred Due to Loss of Jumper to Terminal Continuity During Planned Maint.Automatic Actions Confirmed & Signal Received Verified + (16:37:31, 19 December 2024)
- ML20045D598 + (16:37:33, 19 December 2024)
- TAC:M86583 + (16:37:34, 19 December 2024)
- ML20045D597 + (16:37:34, 19 December 2024)
- ML20045D596 + (16:37:36, 19 December 2024)
- ML20045D592 + (16:37:37, 19 December 2024)
- ML20045D591 + (16:37:38, 19 December 2024)
- ND-20-0093, Supplement to Request for License Amendment: Tornado Missile Protection for Main Steam Vent Stacks and Wall 11 (LAR-19-014S1) + (16:37:38, 19 December 2024)
- ML20045D589 + (16:37:40, 19 December 2024)
- 05000324/LER-1993-006-02, :on 930521,HCU 06-31 Declared Inoperable When CRD Accumulator Low Pressure/High Level Alarm Received in Cr.Hcu 02-23 Inoperable at Time.Hcu 02-23 Restored to Svc & Excess Water Drained from HCU 06-31 + (16:37:42, 19 December 2024)
- NG-93-2195, Application for Amend to License DPR-49,clarifying Existing TS Wording for LPCI & Containment Spray Modes of RHR to Ensure Consistency W/Requirements Delineated in Updated FSAR + (16:37:43, 19 December 2024)
- ML20045D584 + (16:37:52, 19 December 2024)
- ML20045D585 + (16:37:52, 19 December 2024)
- ML20045D583 + (16:37:53, 19 December 2024)
- ML20045D582 + (16:38:00, 19 December 2024)