Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC Generic Letter 80-51, On-Site Storage of Low-Level Waste + (23:01:42, 18 February 2020)
- NRC Generic Letter 80-50, Generic Activity A-10 BWR Cracks + (23:01:50, 18 February 2020)
- NRC Generic Letter 80-49, Nuclear Safeguards Problems + (23:02:37, 18 February 2020)
- NRC Generic Letter 80-48, Revision to 5/19/80 Letter on Fire Protection + (23:02:48, 18 February 2020)
- NRC Generic Letter 80-47, Additional Guidance on "Potential for Low Fracture Toughness and Lamellar Tearing on PWR Steam Generator and Reactor Coolant Pump Supports" + (23:02:55, 18 February 2020)
- NRC Generic Letter 80-46, Generic Technical Activity A-12 Fracture Toughness + (23:03:02, 18 February 2020)
- NRC Generic Letter 80-45, Fire Protection Rule + (23:03:11, 18 February 2020)
- NRC Generic Letter 80-44, Reorganization of Functions and Assignments Within ONRR/SSPB + (23:03:19, 18 February 2020)
- NRC Generic Letter 80-43, IEB 80-13 Cracking in Core Spray Spargers + (23:03:28, 18 February 2020)
- NRC Generic Letter 80-42, IEB 80-12 Decay Heat Removal System Operability + (23:03:40, 18 February 2020)
- NRC Generic Letter 80-41, Summary of Meetings Held on April 22 & 23, 1980 with Representatives of the Mark I Owners Group + (23:04:25, 18 February 2020)
- NRC Generic Letter 80-40, Transmittal of NUREG-0654 "Report of the B&O Task Force"And Appropriate NUREG-0626 "Generic Eval of FW Transient and Sbl + (23:04:31, 18 February 2020)
- NRC Generic Letter 80-39, IEB 80-11 Masonry Wall Design + (23:04:40, 18 February 2020)
- NRC Generic Letter 80-38, Summary of Certain Non-Power Reactor Physical Protection Requirements + (23:04:49, 18 February 2020)
- NRC Generic Letter 80-37, Five Additional TMI-2 Related Requirements to Operating Reactors + (23:04:57, 18 February 2020)
- NRC Generic Letter 80-36, IEB 80-10 Contamination of Non-Radioactive System and Resulting Potential for Unmonitored, Uncontrolled Release to Environment + (23:05:04, 18 February 2020)
- NRC Generic Letter 80-35, Effect of a DC Power Supply Failure on ECCS Performances + (23:05:11, 18 February 2020)
- NRC Generic Letter 80-33, Actions Req. From OL Applicants of B&W Designed NSSS Resulting From NRC B&O Task Force Review of TMI2 Accident + (23:06:32, 18 February 2020)
- NRC Generic Letter 80-32, Information Request on Category I Masonry Walls Employed by Plants Under CP and OL Review + (23:07:21, 18 February 2020)
- NRC Generic Letter 80-31, IEB 80-09 Hydramotor Actuator Deficiencies + (23:07:35, 18 February 2020)
- NRC Generic Letter 80-30, Clarification of the Term "Operable" As It Applies to Single Failure Criterion For Safety Systems Required by TS + (23:08:22, 18 February 2020)
- NRC Generic Letter 80-29, Modifications to Boiling Water Reactor Control Rod Drive Systems + (23:08:54, 18 February 2020)
- NRC Generic Letter 80-28, IEB 80-08 Examination of Containment Liner Penetration Welds + (23:09:04, 18 February 2020)
- NRC Generic Letter 80-27, IEB 80-07 BWR Jet Pump Assembly Failure + (23:09:13, 18 February 2020)
- NRC Generic Letter 80-26, Qualifications of Reactor Operators + (23:09:55, 18 February 2020)
- NRC Generic Letter 80-25, IEB 80-06 Engineering Safety Feature (ESF) Reset Controls + (23:10:25, 18 February 2020)
- NRC Generic Letter 80-24, Transmittal of Information on NRC "Nuclear Data Link Specifications" + (23:11:09, 18 February 2020)
- NRC Generic Letter 80-23, Change of Submittal Date for Evaluation Time Estimates + (23:11:19, 18 February 2020)
- NRC Generic Letter 80-21, IEB 80-05 Vacuum Condition Resulting in Damage to Chemical Volume Control System Holdup Tanks + (23:12:41, 18 February 2020)
- NRC Generic Letter 80-20, Actions Req. From OL Applicants of NSSS Designs by W and CE Resulting From NRC B&O Task Force Review of TMI2 Accident + (23:12:47, 18 February 2020)
- NRC Generic Letter 80-19, Resolution of Enhanced Fission Gas Release Concern + (23:12:55, 18 February 2020)
- NRC Generic Letter 80-18, Crystal River 3 Reactor Trip From Approximately 100% Full Power + (23:13:06, 18 February 2020)
- NRC Generic Letter 80-17, Modifications to Boiling Water Reactor Control Rod Drive Systems + (23:13:13, 18 February 2020)
- NRC Generic Letter 80-16, IEB 79-01b Environmental Qualification of Class 1E Equipment + (23:13:24, 18 February 2020)
- NRC Generic Letter 80-15, Request for Additional Management and Technical Resources Information + (23:13:30, 18 February 2020)
- NRC Generic Letter 80-14, LWR Primary Coolant System Pressure Isolation Valves + (23:14:14, 18 February 2020)
- NRC Generic Letter 80-13, Qualification of Safety Related Electrical Equipment + (23:14:22, 18 February 2020)
- NRC Generic Letter 80-12, IEB 80-04 Analysis of a PWR Main Steam Sine Break with Continued Feedwater Addition + (23:14:29, 18 February 2020)
- NRC Generic Letter 80-11, IEB 80-03 Loss of Charcoal From Standard Type II, 2 Inch, Tray Absorber Cells + (23:14:36, 18 February 2020)
- NRC Generic Letter 80-10, Issuance of NUREG-0588, "Interim Staff Position on Equipment Qualifications of Safety-Related Electrical Equipment" + (23:14:46, 18 February 2020)
- NRC Generic Letter 80-09, Low Level Radioactive Waste Disposal + (23:15:31, 18 February 2020)
- NRC Generic Letter 80-08, IEB 80-02 Inadequate Quality Assurance for Nuclear Supplied Equipment + (23:15:38, 18 February 2020)
- NRC Generic Letter 80-07, Information Regarding the Program For Environmental Qualification of Safety-Related Electrical Equipment + (23:16:21, 18 February 2020)
- NRC Generic Letter 80-06, Issuance of NUREG-0313, Rev 1, "Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure" + (23:16:28, 18 February 2020)
- NRC Generic Letter 80-05, IEB 79-01b Environmental Qualification of Class 1E Equipment + (23:17:12, 18 February 2020)
- NRC Generic Letter 80-04, IEB 80-01 Operability of ADS Valve Pneumatic Supply + (23:17:19, 18 February 2020)
- NRC Generic Letter 80-03, BWR Control Rod Failures + (23:18:03, 18 February 2020)
- NRC Generic Letter 80-02, Quality Assurance Requirements Regarding Diesel Generator Fuel Oil + (23:18:11, 18 February 2020)
- NRC Generic Letter 80-01, NUREG-0630 "Cladding, Swelling and Rupture - Models for LOCA Analysis" + (23:18:19, 18 February 2020)
- NRC Generic Letter 81-40, Qualifications of Reactor Operators + (23:18:27, 18 February 2020)
- NRC Generic Letter 81-39, NRC Volume Reduction Policy + (23:18:34, 18 February 2020)