Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC Generic Letter 79-19, NRC Staff Review of Responses to I&E Bulletins 79-06 and 79-06a + (22:30:59, 18 February 2020)
- NRC Generic Letter 79-18, Westinghouse Two-Loop NSSS + (22:31:07, 18 February 2020)
- NRC Generic Letter 79-17, Reliability of Onsite Diesel Generators at Light Water Reactors + (22:31:13, 18 February 2020)
- NRC Generic Letter 79-16, Meeting Re Implementation Of Physical Security Requirements + (22:31:24, 18 February 2020)
- NRC Generic Letter 79-15, Steam Generators-Enclosing Summary of Operating Experience with Recirculating Steam Generators, NUREG-0523 + (22:31:31, 18 February 2020)
- NRC Generic Letter 79-14, Pipe Crack Study Group – Enclosing NUREG-0531 and Notice + (22:31:40, 18 February 2020)
- NRC Generic Letter 79-12, ATWS – Enclosing Letter to GE, with NUREG-0460, Vol. 3 + (22:32:58, 18 February 2020)
- NRC Generic Letter 79-11, Transmitting "Summary of Operating Experience with Recalculating Steam Generators, January 1979" NUREG-0523 + (22:33:39, 18 February 2020)
- NRC Generic Letter 79-10, Transmitting Regulatory Guide 2.6 for Comment + (22:34:22, 18 February 2020)
- NRC Generic Letter 79-09, Staff Evaluation of Interim Multiple-Consecutive Safety-Relief Valve Actuations + (22:35:05, 18 February 2020)
- NRC Generic Letter 79-08, Amendment to 10 CFR 73.55 + (22:35:12, 18 February 2020)
- NRC Generic Letter 79-07, Seismic (SSE) and LOCA Responses (NUREG-0484) + (22:35:21, 18 February 2020)
- NRC Generic Letter 79-06, Contents of the Offsite Dose Calculation Manual + (22:35:29, 18 February 2020)
- NRC Generic Letter 79-05, Information Relating to Categorization of Recent Regulatory Guides by the Regulatory Requirements Review Committee + (22:36:14, 18 February 2020)
- NRC Generic Letter 79-04, Referencing 4/14/78 Letter – Modifications to NRC Guidance "Review and Acceptance of Spent Fuel Pool Storage and Handling" + (22:37:28, 18 February 2020)
- NRC Generic Letter 79-03, Offsite Dose Calculation Manual + (22:37:33, 18 February 2020)
- NRC Generic Letter 79-02, Transmitting Rev. to Entry Control Systems Handbook (SAND 77-1033), Intrusion Detection Handbook (SAND 76-0554), and Barrier Penetration Database + (22:37:41, 18 February 2020)
- NRC Generic Letter 79-01, Interservice Procedures for Instructional Systems Development – TRADOC + (22:37:50, 18 February 2020)
- NRC Generic Letter 80-113, Control of Heavy Loads + (22:37:54, 18 February 2020)
- NRC Generic Letter 80-112, IEB 80-25 Operating Problems with Target Rock Safety Relief Valves + (22:38:03, 18 February 2020)
- NRC Generic Letter 80-111, IEB 80-17 Supplement 4, Failure of Control Rods to Insert During a Scram at a BWR + (22:38:10, 18 February 2020)
- NRC Generic Letter 80-110, Periodic Updating of FSARS + (22:38:17, 18 February 2020)
- NRC Generic Letter 80-109, Guidelines for SEP Soil Structure Interaction Reviews + (22:38:25, 18 February 2020)
- NRC Generic Letter 80-108, Emergency Planning + (22:38:34, 18 February 2020)
- NRC Generic Letter 80-107, BWR Scram Discharge System + (22:38:42, 18 February 2020)
- NRC Generic Letter 80-106, Report on ECCS Cladding Models, NUREG-0630 + (22:38:48, 18 February 2020)
- NRC Generic Letter 80-105, Implementation of Guidance for USI A-12, Potential for Low Fracture Toughness and Lamellar Tearing on Component Supports + (22:38:55, 18 February 2020)
- NRC Generic Letter 80-104, Orders on Environmental Qualification of Safety Related Electrical Equipment + (22:39:04, 18 February 2020)
- NRC Generic Letter 80-103, Fire Protection - Revised Federal Register Notice + (22:39:12, 18 February 2020)
- NRC Generic Letter 80-102, Commission Memorandum and Order of May 23, 1980 (Referencing IEB 79-01b Supplement 2 - q.2 & 3 - Sept 30, 1980) + (22:39:57, 18 February 2020)
- NRC Generic Letter 80-101, Inservice Inspection Programs for Prestressed Concrete Containment Structures + (22:40:04, 18 February 2020)
- NRC Generic Letter 80-100, Appendix R to 10 CFR 50 Regarding Fire Protection-Federal Register Notice + (22:40:12, 18 February 2020)
- NRC Generic Letter 80-99, Technical Specification Revisions For Snubber Surveillance + (22:40:20, 18 February 2020)
- NRC Generic Letter 80-98, IEB 80-24 Prevention of Damage Due to Water Leakage Inside Containment + (22:40:28, 18 February 2020)
- NRC Generic Letter 80-97, IEB 80-23 Failures of Solenoid Valves Manufactured by Valcor Engineering Corporation + (22:40:36, 18 February 2020)
- NRC Generic Letter 80-95, Generic Activity A-10 + (22:41:55, 18 February 2020)
- NRC Generic Letter 80-94, Emergency Plan + (22:42:03, 18 February 2020)
- NRC Generic Letter 80-92, IEB 80-21 Valve Yokes Supplied by Malcolm Foundry Company, Inc. + (22:43:23, 18 February 2020)
- NRC Generic Letter 80-91, Odyn Code Calculation + (22:44:05, 18 February 2020)
- NRC Generic Letter 80-90, Post TMI Requirements, NUREG-0737 + (22:44:50, 18 February 2020)
- NRC Generic Letter 80-89, IEB 79-01b Supplement 3 Environmental Qualification of Class 1E Equipment + (22:45:34, 18 February 2020)
- NRC Generic Letter 80-88, Seismic Qualification of Auxiliary Feedwater Systems + (22:45:41, 18 February 2020)
- NRC Generic Letter 80-87, Notice of Meeting to Discuss Status of EPRI-Proposed Resolution of the USI A-12 Fracture Toughness Issue + (22:45:48, 18 February 2020)
- NRC Generic Letter 80-86, Notice of Meeting to Discuss Final Resolution of USI A-12 + (22:45:55, 18 February 2020)
- NRC Generic Letter 80-85, Implementation of Guidance From Unresolved Safety Issue A-12, "Potential for Low Fracture Toughness and Lamellar Tearing on Component Supports" + (22:46:01, 18 February 2020)
- NRC Generic Letter 80-84, BWR Scram System + (22:46:45, 18 February 2020)
- NRC Generic Letter 80-83, Environmental Qualification of Safety-Related Equipment + (22:47:29, 18 February 2020)
- NRC Generic Letter 80-82, IEB 79-01b Supplement 2 Environmental Qualification of Class 1E Equipment + (22:47:36, 18 February 2020)
- NRC Generic Letter 80-81, Preliminary Clarification of TMI Action Plan Requirements - Addendum to 9/5/80 Letter + (22:47:45, 18 February 2020)
- NRC Generic Letter 80-80, Preliminary Clarification of TMI Action Plan Requirements + (22:48:30, 18 February 2020)
- NRC Generic Letter 80-79, IEB 80-17 Supplement 3 Failures Revealed by Testing Subsequent to Failure of Control Rods to Insert During a Scram at a BWR + (22:48:38, 18 February 2020)