Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML21169A043 + (03:02:31, 16 September 2025)
- ML21169A001 + (03:02:33, 16 September 2025)
- ML21168A375 + (03:02:34, 16 September 2025)
- PMNS20210830, Closed Meeting with Kairos Power LLC on Mechanistic Source Term Topical Report Preliminary Clarification Questions + (03:02:47, 16 September 2025)
- PMNS20210788, Meeting Between the NRC Staff and the Electric Power Research Institute + (03:02:50, 16 September 2025)
- PMNS20210798, Partially Closed Meeting with Global Nuclear Fuel to Discuss Plans for Higher Burnup Advanced Boiling Water Reactor (BWR) Fuels + (03:03:40, 16 September 2025)
- ML21167A313 + (03:03:49, 16 September 2025)
- TSTF-21-04, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling + (03:04:17, 16 September 2025)
- ML21166A294 + (03:04:34, 16 September 2025)
- ML21166A152 + (03:04:47, 16 September 2025)
- ML21166A151 + (03:04:48, 16 September 2025)
- ML21166A150 + (03:04:49, 16 September 2025)
- PMNS20210813, Meeting with the Nuclear Regulatory Commission and Framatome on Requests for Additional Information (Rais) 8 -10 Regarding Topical Report BAW-10227P, Rev. 2, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Fuel + (03:04:59, 16 September 2025)
- ML21165A179 + (03:05:16, 16 September 2025)
- ML21165A130 + (03:05:26, 16 September 2025)
- ML21162A353 + (03:05:55, 16 September 2025)
- ML21162A351 + (03:05:56, 16 September 2025)
- ML21162A350 + (03:05:57, 16 September 2025)
- ML21162A251 + (03:06:06, 16 September 2025)
- ML21162A078 + (03:06:14, 16 September 2025)
- ML21162A076 + (03:06:15, 16 September 2025)
- PMNS20210806, Closed post-submittal Virtual Meeting with Westinghouse Electric Company to Discuss Westinghouse Topical Report WCAP-18546-P/NP, Westinghouse Axiom Cladding for Use in Pressurized Water Reactor Fuel + (03:06:28, 16 September 2025)
- PMNS20210807, Meeting with X-energy Regarding the CNSC-NRC Joint Report for the Xe-100 Reactor Pressure Vessel Construction Code Assessment + (03:07:30, 16 September 2025)
- ML21160A246 + (03:07:37, 16 September 2025)
- ML21160A221 + (03:07:43, 16 September 2025)
- ML21160A170 + (03:07:51, 16 September 2025)
- ML21160A079 + (03:08:05, 16 September 2025)
- ML21160A078 + (03:08:06, 16 September 2025)
- ML21160A076 + (03:08:07, 16 September 2025)
- ML21160A070 + (03:08:08, 16 September 2025)
- ML21160A069 + (03:08:09, 16 September 2025)
- ML21159A221 + (03:08:31, 16 September 2025)
- PMNS20210793, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (03:08:35, 16 September 2025)
- ML21159A207 + (03:08:38, 16 September 2025)
- PMNS20210789, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (03:08:43, 16 September 2025)
- ML21159A143 + (03:08:54, 16 September 2025)
- ML21159A121 + (03:09:00, 16 September 2025)
- ML21159A120 + (03:09:02, 16 September 2025)
- ML21159A027 + (03:09:18, 16 September 2025)
- PMNS20210168, Small Modular Reactor Topical Report on Elimination of Large Break Loss of Coolant Accident - Request for Additional Information Review + (03:09:23, 16 September 2025)
- PMNS20210668, Closed Meeting to Discuss Request for Additional Information (RAI) 3 Regarding Framatome Topical Report, BAW-10227P, Revision 2, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel + (03:09:41, 16 September 2025)
- ML21158A046 + (03:10:29, 16 September 2025)