Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000445/1989065 + (19:14:37, 16 March 2025)
- ML20248C014 + (19:14:41, 16 March 2025)
- TAC:66529 + (19:15:17, 16 March 2025)
- ML20248B865 + (19:15:28, 16 March 2025)
- NUREG-0133, Safety Evaluation Accepting Licensee Rev 3 to ODCM for Plant Through Temporary Change 4.Rev Meets Criteria of NUREG-0133 & Other Guidance. Guidance + (19:15:41, 16 March 2025)
- 05000334/LER-1998-020, :on 980403,use of non-calibrated Computer Points for TS Surveillance Was Noted.Caused by Inadequate Understanding & Application of TS Sr.Main Benchboard Instrumentation in CR Has Been Calibrated + (19:15:45, 16 March 2025)
- 05000293/LER-1997-023-01, Forwards LER 97-023-01 Re Both Radwaste Bldg Trucklock Doors Closed Resulting in Configuration Inconsistent W/Tornado Depressurization Analysis Assumptions + (19:15:53, 16 March 2025)
- IR 05000313/1998003 + (19:15:56, 16 March 2025)
- IR 07100231/1998201 + (19:16:06, 16 March 2025)
- IR 05000413/1989002 + (19:16:12, 16 March 2025)
- 05000293/LER-1998-008, :on 980427,discovered Section of CR High Efficiency Air Filtration Sys Seismic Class I Ductwork Being Supported by Class II Ductwork.Caused by Lack of Consistent Application of Seismic Criteria.Will Implement Mods + (19:16:15, 16 March 2025)
- NSD-NRC-98-5702, Forwards Formal Transmittal of Correspondence W Previously Sent to NRC Informally Over Period 980223-0316.Index of Attached Matl,Encl Per Request + (19:16:29, 16 March 2025)
- IR 05000413/1989025 + (19:16:45, 16 March 2025)
- IR 05000219/1985039 + (19:16:54, 16 March 2025)
- ML20248B661 + (19:19:49, 16 March 2025)
- DD-89-03, Advises That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-89-03 Expired.Commission Declined Review.Decision Became Final Action on 890522.W/Certificate of Svc.Served on 890606 + (19:19:58, 16 March 2025)
- IR 05000338/1989026 + (19:21:04, 16 March 2025)
- TXX-9812, Responds to NRC Re Violations Noted in Insp Repts 50-445/98-02 & 50-446/98-02.Corrective Actions:Reinforced Mgt Expectations Re Conduct of Activities in Switchyard & Procedure Compliance Re Receipt,Insp & Storage of New Fuel + (19:21:14, 16 March 2025)
- ML20248B464 + (19:21:38, 16 March 2025)
- TXX-8973, Supplemental Deficiency Rept CP-86-07 Re Station Svc Water Sys Leakage.Initially Reported on 860411.Estimated Completion Date for Corrective Action Items 1 & 3 Rescheduled for Completion Prior to Unit 1 Fuel Load + (19:21:39, 16 March 2025)
- IR 05000250/1989009 + (19:21:50, 16 March 2025)
- ML20248B419 + (19:22:17, 16 March 2025)
- NUREG-1275, Informs That Util Fulfilled Requirements of Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety Related Sys + (19:22:34, 16 March 2025)
- ML20248B329 + (19:22:57, 16 March 2025)
- IR 05000282/1998006 + (19:23:01, 16 March 2025)
- 3F0890-02, Responds to Violations Noted in Insp Rept 50-302/89-14. Corrective actions:short-term Instruction Issued to on-duty Operators Emphasizing Conditions Necessary to Perform Procedural Steps W/O Presence of Procedure + (19:23:09, 16 March 2025)
- IR 05000267/1989016 + (19:23:23, 16 March 2025)
- 3F0890-01, Responds to Violations Noted in Insp Rept 50-302/89-11. Corrective Action:Misplaced Tag re-hung on Correct Valve. Valve Identification Label Repositioned to More Suitable Location.Individual Counseled + (19:23:29, 16 March 2025)
- IR 05000482/1998301 + (19:23:41, 16 March 2025)
- ML20248B283 + (19:23:45, 16 March 2025)
- IR 05000341/1989009 + (19:23:48, 16 March 2025)
- IR 05000346/1998007 + (19:24:19, 16 March 2025)
- ML20248B164 + (19:24:37, 16 March 2025)
- TAC:M95204 + (19:25:31, 16 March 2025)
- TXX-8969, Provides Addl Info Necessary to Resolve Proposed License Condition 8,including Results of Site Specific Assessment of Structural Adequacy of Main Steam Lines Under water-filled Conditions + (19:25:33, 16 March 2025)
- ML20248B002 + (19:25:47, 16 March 2025)
- IR 05000416/1998301 + (19:25:58, 16 March 2025)
- ML20248A931 + (19:26:10, 16 March 2025)
- IR 05000324/1989020 + (19:27:08, 16 March 2025)
- ML20248A885 + (19:27:35, 16 March 2025)
- BECO-89-116, Application for Amend to License DPR-35,consisting of Changes to Tech Spec Section 6.0, Administrative Controls, Deleting Organization Charts & Specifying General Requirements,Per Generic Ltr 88-06 + (19:27:38, 16 March 2025)
- ML20248A879 + (19:27:59, 16 March 2025)
- NUREG-0820, Safety Evaluation Supporting Amend 125 to License DPR-20 + (19:28:12, 16 March 2025)
- IR 05000220/1998008 + (19:28:46, 16 March 2025)
- IR 05000445/1989064 + (19:29:27, 16 March 2025)
- 05000302/LER-1989-030, :on 890826 Plant Shut Down Following 890824 Declaration of Pump RWP-2B Inoperability.On 890902 Subj Pump Failed Again When Tested After Silt Removal.Caused by Wrong Impeller in Pump.Subj Impeller Sent for Repair + (19:29:31, 16 March 2025)
- NUREG-1272, Forwards List of 1988 Lers,List of Abnormal Occurrences as Defined by NRC & Contained in 1988 AEOD Annual Rept,App B & Raw Data on Radioactive Matls Released Into Environ from Commercial Nuclear Power Plants in 1988.W/o Ref Encl + (19:29:55, 16 March 2025)
- IR 05000373/1998009 + (19:30:55, 16 March 2025)
- IR 05000445/1989066 + (19:31:06, 16 March 2025)
- 05000445/LER-1998-004, :on 980427,failure to Perform Response Time Testing of Shunt Trip Feature of Reactor Trip Breaker.Caused by Failure to Recognize Difference in Functional Designs. Breaker Was Declared Inoperable & Test Was Performed + (19:31:09, 16 March 2025)
- 05000331/LER-1998-004, :on 980502,noted That Five of Eight Valves Failed to Meet Setpoint Requirements.Caused by Inadequate Corrective Actions.Replaced MSRVs Pilots & MSSVs W/Valves That Were Previously Set Pressure Tested + (19:31:17, 16 March 2025)