Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248L186 + (17:59:52, 16 March 2025)
- ML20248L172 + (18:00:00, 16 March 2025)
- ML20248L164 + (18:00:06, 16 March 2025)
- ML20248L161 + (18:00:09, 16 March 2025)
- ML20248L155 + (18:00:14, 16 March 2025)
- TXX-9800, Submits 90-day Response to GL 97-05, Steam Generator Tube Insp Techniques + (18:00:17, 16 March 2025)
- ML20248L089 + (18:00:41, 16 March 2025)
- ML20248L086 + (18:00:43, 16 March 2025)
- 05000334/LER-1998-008, :on 980207,failure to Test EDG IAW TSs Were Noted.Caused by Inadequate Application of TSs When Initial Surveillance Procedures Were Being Developed.Condition Rept on Potential Issue Was Written on 980207 + (18:00:48, 16 March 2025)
- IR 05000334/1998300 + (18:01:38, 16 March 2025)
- ML20248L047 + (18:01:43, 16 March 2025)
- ML20248L018 + (18:01:50, 16 March 2025)
- TAC:M99892 + (18:01:55, 16 March 2025)
- ML20248K930 + (18:02:08, 16 March 2025)
- ML20248K927 + (18:02:10, 16 March 2025)
- ML20248K923 + (18:02:12, 16 March 2025)
- ML20248K914 + (18:02:15, 16 March 2025)
- ML20248K865 + (18:02:30, 16 March 2025)
- ML20248K841 + (18:02:35, 16 March 2025)
- ML20248K831 + (18:02:38, 16 March 2025)
- ML20248K829 + (18:02:40, 16 March 2025)
- ML20248K824 + (18:02:42, 16 March 2025)
- 05000440/LER-1998-001, :on 980506,instruction Rev Results in Inadequate Testing & Missed TS Sr.Caused by Human Error.On 980506,testing of PRM RM High Alarm Relay Contacts Was Performed + (18:03:01, 16 March 2025)
- 05000318/LER-1998-003-01, :on 980507,relays out-of-calibration Were Noted Due to Bumped Dial & Actions Not Taken.Caused by Improperly Installed Cover.Technicians Will Be Trained on Event & Protective Covers Will Be Clearly Marked + (18:03:08, 16 March 2025)
- 05000457/LER-1998-003-05, :on 980508,failure to Identify ESF Battery Inoperability Resulted in Missed LCO Action Requirement. Caused by Personnel Error & Inadequate Procedure.Revised Procedure & Counseled Individuals Involved + (18:03:20, 16 March 2025)
- 05000213/LER-1998-003, :on 980505,compensatory Sampling Frequency Exceeded Time Limit W/Sw Effluent RM Inoperable.Caused by Personnel Error.Individual Was Counseled & Technicians Were Reminded of Sampling within Required Frequency + (18:03:25, 16 March 2025)
- IR 05000312/1998002 + (18:03:29, 16 March 2025)
- ML20248K599 + (18:03:45, 16 March 2025)
- ML20248K590 + (18:03:53, 16 March 2025)
- ML20248K580 + (18:03:56, 16 March 2025)
- ML20248K577 + (18:03:58, 16 March 2025)
- 05000293/LER-1997-015-01, Forwards LER 97-015-01,re SSW Pumps Overload Settings to Low for Single SSW Pump Operation W/Degraded Voltage.Commitments Made within Ltr,Listed + (18:03:58, 16 March 2025)
- ML20248K573 + (18:04:01, 16 March 2025)
- IR 05000263/1998005 + (18:04:02, 16 March 2025)
- ML20248K562 + (18:04:05, 16 March 2025)
- 05000220/LER-1998-010-01, :on 980430,inadequate Reactor Vessel Level Instruments Were Noted.Caused by Inaccurate Input Parameter. Revised Calculations & Associated Instruments Were Recalibrated + (18:04:23, 16 March 2025)
- L-98-113, Forwards Annual Financial Repts,Including Certified Financial Statements of Dqe,Firstenergy Corp,Oh Co,Il Co & Toledo Edison Co + (18:04:26, 16 March 2025)
- ML20248K483 + (18:04:32, 16 March 2025)
- ML20248K420 + (18:04:46, 16 March 2025)
- 05000425/LER-1998-003-03, :on 980508,lightning Strike Leads to Turbine Reactor Trip.Caused by Main Generator Trip.Spare step-up Transformer Was Placed Into Service & Unit Was Returned to Power on 980514 + (18:04:49, 16 March 2025)
- ML20248K391 + (18:04:54, 16 March 2025)
- TAC:M97197 + (18:04:55, 16 March 2025)
- ML20248K385 + (18:04:59, 16 March 2025)
- ML20248K359 + (18:05:10, 16 March 2025)
- TXX-8915, Supplemental Deficiency Rept CP-87-54 Re Electrical Design Drawings Not Implementing FSAR Requirements for Class 1E motor-operated Valve Motor Starters.Initially Reported on 880128.Completion of Wiring Revs Applicable to Unit 1 Only + (18:05:19, 16 March 2025)
- ML20248K334 + (18:05:27, 16 March 2025)
- ML20248K321 + (18:05:33, 16 March 2025)
- 05000423/LER-1997-063-01, Forwards LER 97-063-01,re Event Determined Reportable at Millstone Unit 3 on 971231.Commitments Made within Ltr,Encl + (18:05:34, 16 March 2025)
- ML20248K314 + (18:05:41, 16 March 2025)
- TXX-8917, Supplemental Deficiency Rept CP-86-68 Re Weather Protection of Class 1E Components Used in Outdoor Installations. Initially Reported on 861002.Completion of Corrective Action for Unit 1 Rescheduled to 890609 & Unit 2 Remains Unchanged + (18:05:42, 16 March 2025)
- 05000482/LER-1998-003, :on 980505,analog Channel Operational Test Did Not Meet TS Requirements.Caused by Incorrect Assumptions. Submitted License Amend Request to Allow 6 H to Place an Inoperable Channel in Bypass Condition + (18:05:48, 16 March 2025)